Tender Value
₹10.8 L
Closing Date
6 Jan 2022, 6:00 pmClosed
Er. Surinder Kumar
Tawi Canal Const Division Jammu
Protection work of syphon at RD 14600M of MTC, construction of retaining wall and improvement of canal section of main D3 RD 4930-5000M at stretches
2021_IFC_155366_1
e-NIT No 21 of 2021-22 dated 29.12.2021
Open Tender
Civil Works - Canal
Item Rate
45 days
Protection work of syphon at RD 14600M of MTC, con
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer TCC Division Jammu
Exempted
8 Jan 2022
29 Dec 2021
7 Jan 2022
30 Dec 2021
6 Jan 2022
30 Dec 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Hand-packing stones in wire-crates; excluding cost of crates and stones
Supply of stone boulder nallah nominal size 225 mm stack measurements reduced by 15 % )
Dumping stone excluding cost of stones. in Horizontal on level
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in rough excavation banking excavated earth in layers not exceeding 20 Cm in depth,breaking clods,watering,rolling each layer with half tonne roller or wooden or steel rammer and ro lling every third and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads flood banks marginal banks and guide or filling up gro und depressions lead upto 50 m and lift upto 1.5 m . All kinds of s oil.Deduct for not rolling with power roller of min 8 tonne for banking excavated earth in layer not exceeding 20 Cm in depth. Deduct for not watering the excavated earth for banking .
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level.
1:3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20MM nominal size) crushed.
1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) crushed.
Centering and shuttering including strutting propping etc and removal of form for :
Foundation, Footing, bases of columns etc for mass concrete
Walls any thickness including attached pilasters buttresses plinth and string course etc.
Grouting of stone pitching using M-10 nomin al mix concrete ( Max size of aggregates 20 mm nominal @ 6.00 cum per 100 sqm on horizontal/side slopes ,complete including curing crushed.
Carriage of material by Mechanical transport from source to site of work including loading unloading and stacking
Sand and agg average distance 20 Km
Soling stone average distance 20 Km
Crates average distance 15 Km
Providing and laying Gabion Crates
Ashok Kumar
Ram Pal Sharma
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .