Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹3.2 L+₹68,047 (26.7%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹3.4 L+₹82,156.80 (32.3%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹3.7 L+₹1.1 L (43.6%)Rejected-Finance | 4 | Rejected-Finance 4 |
| Sl No | Description | Qty | Unit | M/S BHASKAR SHARMA CONTRACTOR L1 | M/S R S CONSTRUCTIONS L2 | SON VIR L3 | M/S RINKU CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 1,568 | Sqm | 4.5 ₹7,056 | 5 ₹7,840 | 4.4 ₹6,899.2 Lowest | 4.4 ₹6,899.2 Lowest |
| 2.00 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 30 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 3,205 | Cum | 42 ₹1,34,610 Lowest | 50 ₹1,60,250 | 64 ₹2,05,120 | 70 ₹2,24,350 |
| 3.00 | Earth Work in Silt Clearance of including Lift upto 1.5 M and Lead upto 100 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 415 | Cum | 139 ₹57,685 | 100 ₹41,500 Lowest | 103 ₹42,745 | 110 ₹45,650 |
| 4.00 | Scrapping internal section of existing channel i.e. slopes with silt upto 5 cm as directed by Engineer-in-Charge | 13,540 | Sqm | 3 ₹40,620 Lowest | 5 ₹67,700 | 4.5 ₹60,930 | 5 ₹67,700 |
| 5.00 | V.R.B./D.R.B. Clearance as directed by Engineer-in-Charge | 14 | Nos. | 12 ₹168 Lowest | 1,500 ₹21,000 | 660 ₹9,240 | 660 ₹9,240 |
| 6.00 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 18 | Sqm | 60 ₹1,080 | 150 ₹2,700 | 57 ₹1,026 Lowest | 57 ₹1,026 Lowest |
| 7.00 | Printing Latters upto 10 CM Hight including Material, labour T&P etc.completed all as specified and as directed by Engineer-in-Charge. | 32 | Each | 100 ₹3,200 | 150 ₹4,800 | 14 ₹448 Lowest | 14 ₹448 Lowest |
| 8.00 | Painting gauge including all cost of material upto 25 cm. Width, labour T&P etc.completed all as specified and as directed by Engineer-in-Charge. | 1.8 | RM | 180 ₹324 Lowest | 500 ₹900 | 184 ₹331.2 | 184 ₹331.2 |
| 9.00 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. All as specified and as directed by Engineer-in-charge. | 1 | Cum | 5,300 ₹5,300 Lowest | 7,000 ₹7,000 | 5,542.9 ₹5,542.9 | 5,542.9 ₹5,542.9 |
| 10.00 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc. All as specified and as directed by Engineer-in-charge. | 22 | Sqm | 200 ₹4,400 | 400 ₹8,800 | 196.25 ₹4,317.5 Lowest | 196.25 ₹4,317.5 Lowest |
Tender Value
₹3.8 L
EMD Value
₹8,000
Closing Date
19 Sept 2026, 12:00 pmClosed
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_3
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹8,000
Yes
2 Oct 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 1,568 | Sqm | - | - |
| 2 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 30 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 3,205 | Cum | - | - |
| 3 | Earth Work in Silt Clearance of including Lift upto 1.5 M and Lead upto 100 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 415 | Cum | - | - |
| 4 | Scrapping internal section of existing channel i.e. slopes with silt upto 5 cm as directed by Engineer-in-Charge | 13,540 | Sqm | - | - |
| 5 | V.R.B./D.R.B. Clearance as directed by Engineer-in-Charge | 14 | Nos. | - | - |
| 6 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 18 | Sqm | - | - |
| 7 | Printing Latters upto 10 CM Hight including Material, labour T&P etc.completed all as specified and as directed by Engineer-in-Charge. | 32 | Each | - | - |
| 8 | Painting gauge including all cost of material upto 25 cm. Width, labour T&P etc.completed all as specified and as directed by Engineer-in-Charge. | 1.8 | RM | - | - |
| 9 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. All as specified and as directed by Engineer-in-charge. | 1 | Cum | - | - |
| 10 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc. All as specified and as directed by Engineer-in-charge. | 22 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2230587.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .