Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.3 LAccepted-AOC A102 RIVIERA ELEGANCE SAGAR SHETTY A102 RIVERA ELEGANCE PRAHLADNAGAR AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | ₹72.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L1₹1.7 CrAccepted-AOC D115 GHATKOPAR INDUSTRIAL ESTATE L B S MARG GHATKOPAR WEST MUMBAI MAHARASHTRA 400086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | ₹1.7 Cr | L1 | Accepted-AOC L1 Bidder |
| 3 | L2Rejected-Finance TC III BUILDING POST BAG 979 LNT VALVES MOUNT POONAMALLE ROAD MOUNT POONAMALLEE ROAD MANAPAKKAM KANCHIPURAM TAMIL NADU 600089 | KANCHIPURAM | TAMIL NADU | 600089 | - | L2 | Rejected-Finance L2 Bidder |
| 4 | L2Rejected-Finance T 45 MIDC INDUSTRIAL AREA HINGNA ROAD NAGPUR NAGPUR MAHARASHTRA 440016 | NAGPUR | MAHARASHTRA | 440016 | - | L2 | Rejected-Finance L2 Bidder |
| 5 | Rejected-Technical BLOCK NO 258 AHMEDABAD MEHSANA HIGHWAY KALOL GANDHI NAGAR GUJARAT 382721 | GANDHINAGAR | GUJARAT | 382721 | - | - | Rejected-Technical Techno Commercially Not Acceptable |
Tender Value
Refer Docs
Closing Date
2 Aug 2022, 3:00 pmClosed
Mr. Nilesh Sathe
thyssenKrupp Industrial Solutions (India) Private Limited (Formerly Uhde India Private Limited) Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India.
SUPPLY OF VALVE GATE (MOTOR OPERATED) FOR P25 PROJECT AT IOCL PANIPAT REFINERY
2022_REFHQ_153233_1
6745-PPM-000-CA-PI36
Limited
Mechanical - Piping, materials, flanges, valves, seals
Supply
210 days
IOCL Panipat Refinery
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
26 Feb 2024
5 Jul 2022
3 Aug 2022
5 Jul 2022
2 Aug 2022
12 Jul 2022
SUPPLY OF VALVE GATE (MOTOR OPERATED)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, B16.34, FLGD,B16.47 SER-B,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 4.5 KG/CM2(G), DESIGN TEMPERATURE 120 DEG.C, SHUT-OFF PRESSURE 4.5 KG/CM2(G), FLOW THROUGH MOV 42600 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 12.04 KG/CM2(G), DESIGN TEMPERATURE 155 DEG.C, SHUT-OFF PRESSURE 12.04 KG/CM2(G), FLOW THROUGH MOV 42600 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 12.04 KG/CM2(G), DESIGN TEMPERATURE 155 DEG.C, SHUT-OFF PRESSURE 12.04 KG/CM2(G), FLOW THROUGH MOV 10470 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 14.06 KG/CM2(G), DESIGN TEMPERATURE 140 DEG.C, SHUT-OFF PRESSURE 14.06 KG/CM2(G), FLOW THROUGH MOV 12400 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 14.06 KG/CM2(G), DESIGN TEMPERATURE 140 DEG.C, SHUT-OFF PRESSURE 14.06 KG/CM2(G), FLOW THROUGH MOV 12400 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 10.5 KG/CM2(G), DESIGN TEMPERATURE 125 DEG.C, SHUT-OFF PRESSURE 10.5 KG/CM2(G), FLOW THROUGH MOV 6560 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,CS,MOTOR OP.,H2 SER, 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, A216 GR.WCB, 13% CR, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B7/A194Gr.2H, STELLITED, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.DESIGN PRESSURE 10.5 KG/CM2(G), DESIGN TEMPERATURE 125 DEG.C, SHUT-OFF PRESSURE 10.5 KG/CM2(G), FLOW THROUGH MOV 6560 M3/HR., 4.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 5.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,AS,MOTOR OP., 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, REFER ANNEXURE-I FOR PURGING, DETAILS, A217 GR.C12, STELLITED, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B16/A194Gr.7, STEM 13% CR STEEL, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.DESIGN PRESSURE 16 KG/CM2(G), DESIGN TEMPERATURE 420 DEG.C, SHUT-OFF PRESSURE 16 KG/CM2(G), FLOW THROUGH MOV 921.3 M3/HR., 3.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 4.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
GATE VALVE,AS,MOTOR OP., 300,0, API 600, FLGD,B16.5,RF, BB, BOLTED GLAND, OPERATION MOTOR OPERATED., MOTOR SPECIFICATIONS, REFER ANNEXURE-A & ANNEXURE-B, DCS INTERFACE IS NOT ENVISAGED, REFER ANNEXURE-I FOR PURGING, DETAILS, A217 GR.C12, STELLITED, FLEXIBLE GRAPHITE, SP WD SS316+GRPH, A193 Gr.B16/A194Gr.7, STEM 13% CR STEEL, SUPP. REQUIREMENTS, VALVE SHALL BE SUPPLIED WITH MOTOR, INSTALLED ON VALVE., TESTING REQUIREMENT FOR ACTUATOR OF MOV, SHALL BE FURNISHED BY THE VENDOR., ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, 6745-PIP-000-EC-0003, 2.DESIGN PRESSURE 16 KG/CM2(G), DESIGN TEMPERATURE 420 DEG.C, SHUT-OFF PRESSURE 16 KG/CM2(G), FLOW THROUGH MOV 921.3 M3/HR., 3.VALVE SHALL BE FULLY OPENING AND, FULLY CLOSING TYPE., 4.VALVE OPENING RESPONSE TIME SHALL, BE AS MINIMUM AS POSSIBLE. (Bidder to refer Technical_Documents/ Tech_Spec_Confirmation_Sheets for details of Spare Actuator)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .