Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC GAUSHALA MARKET TEHSIL NARNAUL NARNAUL 123001 | NARNAUL | NARNAUL | HARYANA | 123001 | L1 | Accepted-AOC . | |
| 2 | L2₹5.5 L+₹19,220.86 (3.62%)Rejected-Finance | L2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | SHREE SHYAM ELECTRICAL L2 | Shree Shyam Associates L1 |
|---|---|---|---|---|---|
| 1.01 | Supply Erection of PCC pole 11metre long complete with in all respect to complete as per DHBVN specification. | 17 | Each | 9,927 ₹1,68,759 Lowest | 12,000 ₹2,04,000 |
| 1.02 | Supply Erection of HDPE pipe 160mm2 complete with in all respect to complete as per DHBVN specification. | 15 | Each | 1,544.37 ₹23,165.55 Lowest | 2,000 ₹30,000 |
| 1.03 | Supply Erection of V-shape 100x50mm wt. 13.200Kg complete with in all respect to complete as per DHBVN specification. | 9 | Each | 1,926.17 ₹17,335.53 | 1,500 ₹13,500 Lowest |
| 1.04 | Supply Erection of 11 KV Top bracket wt. 1.480Kg. complete with in all respect to complete as per DHBVN specification. | 9 | Each | 234.47 ₹2,110.23 | 150 ₹1,350 Lowest |
| 1.05 | Supply Erection of 11 kV Pin insulator complete with in all respect to complete as per DHBVN specification. | 30 | Each | 224.8 ₹6,744 | 150 ₹4,500 Lowest |
| 1.06 | Supply Erection of 11 KV Polymeric Disc insulator complete with in all respect to complete as per DHBVN specification. | 24 | Each | 195.26 ₹4,686.24 | 150 ₹3,600 Lowest |
| 1.07 | Supply Erection of Half clamp wt. 1.47Kg. complete with in all respect to complete as per DHBVN specification. | 50 | Each | 232.98 ₹11,649 | 150 ₹7,500 Lowest |
| 1.08 | Supply Erection of Full clamp complete with in all respect to complete as per DHBVN specification. | 2 | Each | 367.33 ₹734.66 | 200 ₹400 Lowest |
| 1.09 | Supply Erection of G.I. channel (X-ArMG.I.) 100x50x6mm 200mm complete with in all respect to complete as per DHBVN specification. | 4 | Each | 3,069 ₹12,276 | 1,800 ₹7,200 Lowest |
| 1.10 | Supply Erection of G.I. Channel 75x40x6 mm 2200mm complete with in all respect to complete as per DHBVN specification. | 8 | Each | 2,294 ₹18,352 | 1,800 ₹14,400 Lowest |
Tender Value
₹4.9 L
EMD Value
₹9,727
Closing Date
6 Mar 2026, 5:00 pmClosed
RAVI Ladwal
ED - Rewari
Construction of New Judicial Courts Complex, Bawal in Distt. Rewari (Shifting of HT line passing over the land of SDM Office and new proposed Judicial Court Complex land on 11KV Keshopur RDS feeder at Saban road Bawal under op S/Divn Bawal Rewari dur
2026_HRY_505586_1
2026316B0901 E426 49AF 8F6B E81CA93CECE1668BAR
Open Tender
Civil Works
Works
60 days
Bawal
2 documents required · 2 mandatory
₹500
₹9,727
Yes
30 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply Erection of PCC pole 11metre long complete with in all respect to complete as per DHBVN specification. | 17 | Each | 1 | ₹17 |
| 1.02 | Supply Erection of HDPE pipe 160mm2 complete with in all respect to complete as per DHBVN specification. | 15 | Each | 1 | ₹15 |
| 1.03 | Supply Erection of V-shape 100x50mm wt. 13.200Kg complete with in all respect to complete as per DHBVN specification. | 9 | Each | 2 | ₹18 |
| 1.04 | Supply Erection of 11 KV Top bracket wt. 1.480Kg. complete with in all respect to complete as per DHBVN specification. | 9 | Each | 3 | ₹27 |
| 1.05 | Supply Erection of 11 kV Pin insulator complete with in all respect to complete as per DHBVN specification. | 30 | Each | 4 | ₹120 |
| 1.06 | Supply Erection of 11 KV Polymeric Disc insulator complete with in all respect to complete as per DHBVN specification. | 24 | Each | 5 | ₹120 |
| 1.07 | Supply Erection of Half clamp wt. 1.47Kg. complete with in all respect to complete as per DHBVN specification. | 50 | Each | 6 | ₹300 |
| 1.08 | Supply Erection of Full clamp complete with in all respect to complete as per DHBVN specification. | 2 | Each | 7 | ₹14 |
| 1.09 | Supply Erection of G.I. channel (X-ArMG.I.) 100x50x6mm 200mm complete with in all respect to complete as per DHBVN specification. | 4 | Each | 8 | ₹32 |
| 1.1 | Supply Erection of G.I. Channel 75x40x6 mm 2200mm complete with in all respect to complete as per DHBVN specification. | 8 | Each | 9 | ₹72 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_584308.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .