| 1 | L1₹12.3 LAccepted-AOC 47 VED NAGAR COLONY DEORI ROAD AGRA 282 001 | AGRA | AGRA | UTTAR PRADESH | 282001 | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹14.0 L+₹1.7 L (14.0%)Rejected-Finance | L2 | Rejected-Finance BEING OTHER THAN L1 | |
| 3 | L3₹17.5 L+₹5.2 L (41.8%)Rejected-Finance | L3 | Rejected-Finance BEING OTHER THAN L1 | |
| 4 | L4₹18.0 L+₹5.6 L (45.7%)Rejected-Finance 72 USMAN ENCAVE SECTOR O ALIGANJ LUCKNOW 226004 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226004 | L4 | Rejected-Finance BEING OTHER THAN L1 | |
| 5 | L5₹18.8 L+₹6.5 L (52.4%)Rejected-Finance | L5 | Rejected-Finance BEING OTHER THAN L1 |
Tender Value
₹23.4 L
EMD Value
₹46,780
Closing Date
16 Jun 2021, 6:00 pmClosed
GE EAST AGRA
Garrison Engineer East Agra, Gwalior House, 62 Taj Road Agra Cantt
OUTSOURCING FOR OPERATION AND MAINTENANCE OF CENTRAL TYPE AC PLANTS INSTALLED AT VARIOUS UNITS AND DG SETS OF 509 ABW AT UNDER GE EAST AGRA
2021_MES_436324_1
9347/E8
Open Tender
Civil Works
Item Rate
335 days
AGRA
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹500
GE EAST AGRA
₹46,780
Yes
24 Jul 2021
15 Apr 2021
18 Jun 2021
15 Apr 2021
16 Jun 2021
29 Apr 2021
Amount
Note: Please refer schedule 'A' notes given on serial page No. 13 to 15 before quoting the tender.
M&L for manning & operation and including routine comprehensive maintenance of central Air conditioning plant water cooled type of capacity 2 x 75 TR at Clean Room Gp complete for its proper smooth functioning and including operation & maintenance of complete AC plant like compressor unit, chiller unit , condensor unit with pump set and motor , AHUs, cooling tower , valve sets along with connected panel board and connecting fixing accessories of complete system etc including repair / rectification of loose / tightness connection and also changing of difected partrs which is easly done by techanician at site and making as when required to ensure serviceability of complete plant and daily checking of any type of leakage of gas / pressure/water drop in AC Plant and taken immediate action to stop the same leakage and making pump down the complete system and assuring OP, HP & LP are with in safe limit including cleaning of complete plant / plant room / surrounding area neat & clean and also cleaning of cooling tower, air condenser coil unit, air filters of AHU etc and removing grass from installation yard and surrounding area and also recording of hourly basis AC plant run in specific log sheet which is as approved by Engineer-in-Charge and log sheet will be supplied by the contractor for all working days and also working of one single shift duty operator (Refg Mech) basis of each shift of 08 hours at central AC plant installation of Clean Room of 509 ABW complete all as specified and directed
Description all as per in item No 2 above but for central AC plant of capcity 2x60 TR at TL Group installed at 509 ABW
Description all as per in item No 2 above but for central AC plant of capcity 2x22.5 TR at IN Group (Leaser Lab) including 1x125 KVA DG Set WSG, installed at 509 ABW
Description all as per in item No 2 here in before but for central AC plant of capacity 3 x 10 TR including 1x40 KVA DG Set installed at Para Missile shed for round the clock 24 hours of three shift duty operator basis of each shift of 08 hours
Description all as per in item No 2 above but with FGM for 1 x 320 KVA and 160 KVA DG Set TL high Gp, 1x125 KVA DG Set adm Block installed at 509 ABW
Description all as per in item No 2 above but with FGM for 1 x 500 KVA over hall bay and 50 KVA DG Set of lazer tower installed at 509 ABW
Notes for item No 2.00 to 7.00:- (i) The plants shall be run for 08/24 hrs daily all working days including sundays and holidays or as per base on user requirements times or as per time schedule direction by AGE E&M /GE and including Sunday and holidays. (ii) The unit rates shall also be deemed to be inclusive for collection of Refrigerant Gas cylender & compressor oil and arrangment of veh and labour for transporting of Refrigerant Gas cylender & compressor oil by own arrangment from carry out AGE E/M store yard to site and depositing the empty cylender ,oil barrel from site to AGE E/M Store yard (iii) The quoted rates shall be deemed to include for checking & maintenance and testing of AC plant by well qualifeld techanician of AC mech for repair / rectification / connection / tightness and also changing of difected partrs which is easly done by techanician at site and making as when required to ensure serviceability of complete plant (iv) The unit rates shall also be deemed to be inclusive for T & P required for shift duty operator for routine check & maintenance of installation i.e. hand gloves, pliers, testers, DE wrench set, ring spanner set, box wrench set, screw driver set, adjustable wrench,including all type of tool which is required at site. (v) The unit rates shall also be deemed to be inclusive for proforma of log sheet, cleaning material, will be arranged by the contractor at no extra cost.
Sanjay Associates
Garg Engineers
Unnati Engineers
AIRDOT ENGINEERING
Allied Builders
J K Enterprises
M/S LN ASSOCIATES
MAA SANTOSHI ENTERPRISES
ENVIRO TECH SERVICES
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .