Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance L2 Reject |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw the Contractor |
| Sl No | Description | Qty | Unit | M. SUBBAIYA L1 | S. MARIMUTHU L2 |
|---|---|---|---|---|---|
| 1.00Providing for Fencing at Thulaiyanur Chetti Oorani (Drinking Water Oorani) Alround in Thulaiyanur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 17.7 | cum | 263.5 ₹4,663.95 | 275 ₹4,867.50 |
| 3.00 | Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete | 4.63 | cum | 1,787.3 ₹8,275.20 | 1,799 ₹8,329.37 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 4.63 | cum | 5,533.5 ₹25,620.11 | 5,575 ₹25,812.25 |
| 5.00 | Centring for sides and soffits including cost and conveyance of all labour charges etc complete. | 147.2 | Sqm | 547.5 ₹80,592 | 550 ₹80,960 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 22.22 | Cum | 6,837.5 ₹1.5 L | 6,840 ₹1.5 L |
| 7.00Supply and fixing of cutstone pillar including cost and conveyance of all materials to work site and all labour charges etc., complete. | |||||
| 8.00 | Cut Stone Pillar Cost | 186 | Sqm | 165.5 ₹30,783 | 167 ₹31,062 |
| 9.00 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x10 gauge of best approved quality including cost of GI wire and labour charges for fixing in position etc., complete | 474 | Sqm | 251 ₹1.2 L | 255 ₹1.2 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 9 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | Nos | 75,750.75 ₹75,750.75 | 76,299.47 ₹76,299.47 |
Tender Value
₹5.3 L
EMD Value
₹5,260
Closing Date
12 Mar 2026, 3:00 pmClosed
Bdo,Thirumayam
Pt.union Office,Thirumayam
Providing for Fencing at Thulaiyanur Chetti Oorani (Drinking Water Oorani) Alround in Thulaiyanur Panchayat
2026_RDTN_670700_1
Tym/QuarryFund/Work---7
Open Tender
Civil Works
Thirumayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,260
29 Apr 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Providing for Fencing at Thulaiyanur Chetti Oorani (Drinking Water Oorani) Alround in Thulaiyanur Panchayat
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Centring for sides and soffits including cost and conveyance of all labour charges etc complete.
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and fixing of cutstone pillar including cost and conveyance of all materials to work site and all labour charges etc., complete.
Cut Stone Pillar Cost
Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x10 gauge of best approved quality including cost of GI wire and labour charges for fixing in position etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 9 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tym_doc--7.pdf
Tender Documents • 0.18 MB
BOQ_806007.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid