Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
18 Nov 2020, 5:00 pmClosed
EXECUTIVE ENGINEER
ELECTY. 400 KV S/S DIVISION, SAROJINI NAGAR, LUCKNOW
DIFFERENT UP-GRADATION/ MODIFICATION IN 33 KV SWITCHYARD AND MAINTENANCE WORKS IN 132 KV SWITCHYARD AT 220 KV SUB STATION, SAROJININ NAGAR, LUCKNOW
2020_UPTCL_525385_1
08/2020-21
Open Tender
Electrical Works
Fixed-rate
60 days
ELECTY. 220 KV S/S
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹590
A/C No. 1277784333, IFSC CBIN0283745
₹2,000
24 Nov 2020
27 Oct 2020
19 Nov 2020
27 Oct 2020
18 Nov 2020
27 Oct 2020
Amount
Erection of following Structures / Equipments as per instruction manual & technical specifications including shifting of structures/equipments from store site to erection site with all other associated work for completion of the job.
Auxiliary Structure. (ALP in 630 KVA T/F-2nd circuit)
33 kV Fuse Set ( 1 No. in 250 KVA T/F & 1No. in 630 KVA T/F-1st circuit)
33 kV Circuit Breaker ( in 630 KVA T/F-2nd circuit).
33 kV CT ( in630 KVA T/F-2nd circuit).
Earthing of above main & auxiliary structures & equipments using 50 X 6mm size M.S. flat as per UPPTCL standard.
Shifting of 33 kV Naderganj – 2nd feeder from 33 kV Main Bus B to 33 kV Main Bus A complete in all respect including cutting & carriage of conductors from store site to work place and after completion of work shifting of old materials from work site to store site with all other associated work.
Dismantling of connecting jumpers from 33 kV Main Bus B.
Jumper connecting of 33 kV Naderganj-2nd feeder from 33 kV Main Bus A.
Following detailed work are to be done for construction of plinth and stair around fuse set ( L V Side of 630 KVA Station Transformer ) as below with all cost of men, materials and labour etc. which required to complete the job satisfactorily. (i). Making base pad of size 1500mm X 900mm X 200mm using cement, coarse sand & brick ballast in ratio 1:3:6. (ii). After completion of base pad making plinth of size 1500mm X 900mm X 600mm using C.C. & brick work as per direction of Supervising Engineer. (iii). After completion of plinth making stair of size 900mm X 300mm X 300mm using brick work as per direction of Supervising Engineer. (iv). After completion of plinth & stair 12mm thick plastering using cement & coarse sand mixture in the ratio of 1:4 on top surface. ( 01 Job for each 630 KVA T/F plinth and stair)
Safely Dismantling of following Equipment/Structure/Jumper by opening of nut & bolts, jumper, cable connections, earthings and store at safe place for shifting of 33 kV Capacitor Bank-2nd from 33 kV Main Bus B to 33 kV Main Bus A.
ALP Structure
Opening of Jumpers from 33 kV B Bus.
Safely Erection of following Equipments/Structures/Jumpers as per instruction manual & technical specifications including all associated work to complete the job satisfactorily to connecting 33 kV Capacitor Bank – 2nd from 33 kV Main Bus A.
ALP Structure
Jumper connecting of 33 kV Capacitor Bank – 2nd to 33 kV Main Bus A
Earthing of ALP Structures using 50X6 mm M.S. flat as per UPPTCL Standard.
Replacement of damaged jack bus Panther Conductor Jumpers of 132 kV different Bays. Work includes:-
Dismantling of 132 kV Jack Bus from disc, Tension/Gun fitting & safely lowering down the Conductor from both side at height of 7 mtr approx and disc insulator avoiding any damage to disc insulator or any other equipments. Work also includes the opening of jumpers connected to Jack Bus with Circuit Breaker & line isolator and proper stacking of old dismantled conductor at storage place as per instruction of J.E./A.E.
Stringing of new Conductor of 132 kV Jack Bus along with disc, gun/tension fitting at the height of 7 mtr approx from both side with proper sagging. Work also includes the connection of jumpers connected to jack bus with LSI & Circuit Breaker.
Erection of ALP structure for proper twin moose jumper support (3 Nos. before line isolator & 1 No. before A Bus isolator) of 220/132 kV,200 MVA T/F-1st & 2nd circuit. The work includes carriage of ALP structures from the store site and completing the job satisfactorily.
Safe erection of 132 kV post insulator on above new ALP structure with the help of crane and proper fixing on ALP structure top base & connecting jumper with P.I. clamp. The work also includes carriage of post insulators from store to work site & completing the job satisfactorily.
jagdish enterprises
Verma Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .