| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.8 LAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L1 | Accepted-AOC AOC | |
| 2 | L2₹59.2 L+₹31,303 (0.53%)Rejected-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹61.4 L+₹2.6 L (4.33%)Rejected-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L3 | Rejected-AOC Rejected |
Tender Value
₹58 L
EMD Value
₹1.2 L
Closing Date
16 Mar 2020, 6:00 pmClosed
CWE (NW) MUMBAI
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
MANNING AND OPERATION, COMPREHENSIVE MAINTENANCE AND REPAIR/REPLACEMENT OF CERTAIN PARTS OF CENTRAL AIR CONDITIONING PLANTS INSTALLED AT BOAT POOL AND INS SHIKRA AND MANNING OPERATION AND ROUTINE MAINTENANCE OF RO PLANT INCLUDING SUPPLY OF ESSENTIA
2020_MES_325623_1
8615/CWE(NW)/MUMBAI
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE NW NOFRA
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
GE(NW) NOFRA
₹1.2 L
Yes
15 Apr 2020
15 Feb 2020
18 Mar 2020
15 Feb 2020
16 Mar 2020
2 Mar 2020
15 Feb 2020 - 29 Feb 2020
Amount
MANNING AND OPERATION,COMPREHENSIVE MAINTENANCE AND REPAIRS/ REPLACEMENT OF CERTAIN PARTS OF CENTRAL AIR CONDITIONING PLANTS INSTALLED AT BOAT POOL AND INS SHIKRA Part - I Manning & operation of Central AC Plant two in number 32.5 TR make Kirloskar run at a time one compressor and one stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+5% AC plant consists of the following items fitting/ fixtures/ device components for operation at Epoxy coating workshop boat pool 8hrs daily excluding Sunday and Holiday in one shift.(i.e 0800 To 1600 Hrs) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- (a) Compressor make Kirloskar -02Nos.(b) Compressor motor HBB 50HP-02Nos.(c) Condenser water pump set mono block 7.5HP - 02 Nos. (d) Air handling unit with blower motor 10HP-01No. (e) AHU motor 10HP HBB-01No.(f) Cooling tower induced draft type -01No. (g) Electrical control panel cubical type floor mounted with maint switch MCBs voltmeter, Ammeter, Starter condenser etc. complete-01Set. (h) Control devices such as expansion valve thermostat solenoid valves HP/LP/CP cuts out with panel board installed gauges-01 Set (j) Digit type thermometer-01Set (k) Air supply duct with grill diffusers, dampers and heater etc. complete-01Set (l) Condensor MS piping 100mm with valves, pressure gauge, temperature gauge complete-01Set
Manning & operation of Central AC Plant of water cooled chillers 3Nos. x 50 TR (Two running,one standby) Total 150 TR make: voltas for smooth functioning of entire system and to maintain temperature of AC plant consists of the following items fitting/ fixtures/ device components for operation at INS SHIKRA . 16 hrs daily excluding Sunday and Holiday in two shift.(i.e 0600 to 1400 Hrs,1400 to 2200 Hrs ) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete for the following:- (a) Compressor model No. ACCWC05000MNT-03 Nos. (b) Compressor motor 60HP-03Nos (c) Condenser / chiller water pump set mono block 10/7.5HP-04Nos. (d) Air handling unit with blower motor -01No. (e) FRP Cooling tower with CT Fan-01No. (f) Control devices such as expansion valve thermostat solenoid valves HP/LP/CP cut outs with panel board installed gauges -01Set. (g) Digit type thermometer-01 Set. (h) Air supply duct with grill diffusers dampers and heater etc. complete-01Set. (j) Condenser piping MS 100/80/50mm dia with valves, pressure gauge, temperature gauge -01Set
PART-II Comprehensive maintenance of Central Air conditioning Plant of capacity 32.5TR X 2Nos comprising of following equipment mentioned under including cleaning, securing, gearing the merable parts of pump motors and painting of plants motor, cooling towers and pipes, cleaning of cooling tower etc complete all as specified and directed by Engineer-in-Charge at Boat Pool Workshop:- (a) Compressor make Kirloskar -02Nos.(b) Compressor motor HBB 50HP-02Nos.(c) Condenser water pump set mono block 7.5HP - 02 Nos. (d) Air handling unit with blower motor 10HP-01No. (e) AHU motor 10HP HBB-01No.(f) Cooling tower induced draft type -01No. (g) Electrical control panel cubical type floor mounted with maint switch MCBs voltmeter, Ammeter, Starter condenser etc. complete-01Set. (h) Control devices such as expansion valve thermostat solenoid valves HP/LP/CP cuts out with panel board installed gauges-01 Set (j) Digit type thermometer-01Set (k) Air supply duet with grill diffusers, dampers and heater etc. complete-01Set (l) Condensor MS piping 100mm with valves, pressure gauge, temperature gauge complete-01Set
Comprehensive maintenance inclduing Sundays & Holidays of central AC plant of water cooled chillers 3Nos. x 50 TR (Two running,one standby) Total 100 TR make: voltas, model No. AC WC05000MNT at INS SHIKRA complete with cooling tower AHU & other accessories for for the following:- (a) Compressor model No. ACCWC05000MNT-03 Nos. (b) Compressor motor 60HP-03Nos. (c) Condenser / chiller water pump set mono block 10/7.5HP-04Nos. (d) Air handling unit with blower motor -01No. (e) FRP Cooling tower with CT Fan-01No. (f) Control devices such as expansion valve thermostat solenoid valves HP/LP/CP cut outs with panel board installed gauges -01Set. (g) Digit type thermometer-01 Set. (h) Air supply duet with grill diffusers dampers and heater etc. complete-01Set. (j) Condenser piping MS 100/80/50mm dia with valves, pressure gauge, temperature gauge -01Set. (Note The commencment of maintenance work start wef 28 Aug 2020)
PART-III Material and labour for pumping down and transfer existing refrigerant gas of compressor complete for over hauling of compressor, reciprocating open type Model No. AC- 470 Make:Kirloskar 32.5Ton capacity and dismantling complete assembly & replacing of minor unserviceable parts including matching of crank shaft boring polishing etc. replacing of gaskets packing reassembly and recharging of pumped down refrigerant & topping up if required, maintain the required standing pressure charging of compressor oil complete testing for smooth functioning etc complete all as specified and directed by Engineer-in-Charge at Epoxy work shop Boat Pool. Note: (Major spare parts, compressor oil and refrigerant gas for topping up will be measured and paid seperately herein after as supply only).
Material and labour for pumping down and transfer existing refrigerant gas of compressor complete for over hauling of compressor, reciprocating open type Model No. 5H20 Make:Voltas 50Ton capacity and dismantling complete assembly & replacing of minor unserviceable parts including matching of crank shaft boring polishing etc. replacing of gaskets packing reassembly and recharging of pumped down refrigerant & topping up if required, maintain the required standing pressure charging of compressor oil complete testing for smooth functioning etc complete all as specified and directed by Engineer-in-Charge at INS Shikra. Note: (Major spare parts, compressor oil and refrigerant gas for topping up will be measured and paid seperately herein after as supply only).
Supply only following items for compressor reciprocating model No AC-470. Make :- Kirloakar 32.5 ton and compressor reciprocating model No.5H20 Make :- Voltas 50 ton capacity
Main bearing
Liner assembly
Piston rings
Piston Oil rings
Piston pins
Suction valve reeds
Suction valve reed springs
Discharge valve reeds
Discharge valve reed spring
Discharge valve guide assembly
Connting Rod
Oil filter inner/ outer
Discharge valve retaining plate
Piston
Oil regulating valve
Connecting rod bearing of two
Loading/ unloading valves
Loading/ unloading rings
Crankshaft
Oil pump Assembly
Oil pump bush
Solenoid coil valve assembly
Taking down old unserviceable shaft seal assembly complete and supply and fix new shaft seal assembly suitable for 32.5 TR capacity central AC Plant all as directed by Engineer-in-Charge
Taking down old unserviceable shaft seal assembly complete and supply and fix new shaft seal assembly suitable for 50TR capacity central AC Plant all as directed by Engineer-in-Charge
Material and labour for expansion valve of AC plant capacity 32.5TR including taking down unserviceable valve complete all as specified and directed by Engineer-in-Charge at Boat pool. Make : Sporlon or equivalent
Material and labour for expansion valve model no- MV-52 of AC plant capacity 50TR including taking down unserviceable valve complete all as specified and directed by Engineer-in-Charge at Boat pool. Make : Sporlon or equivalent
Material and labour for pumping down the plant to preserve the existing in refrigerant gas & leak testing of plant by charging of nitrogen gas in to entire plant & monitoring for 24hrs to find the leakages, rectification of leak by brazing & replacement of necessary gasket packing wherever required including copper tubes of suitable size vacumising of the plant by vacum pump & keeping 24hrs for testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning complete all as specified & as directed by Engineer-in-Charge.
Dismantling AHU of 3 x 50TR capacity AC plant carefully by removing side and top panel removing unserviceable blower shaft bearings,removing motor & blower assembly, replacement of new AHU blower shaft bearings reassembling blower assembly and refixing electric motor & top side panel in original position with new nut bolts washers & shafts keys & checking the shafts balancing & testing for smooth running all as specified and directed at INS SHIKRA.
Removing the unserviceable liquid line valve of size 25mm dia from the liquid line after pumping down the compressor & supply and fixing new liquid line valve 25mm dia including connected works as required for smooth functioning of AC plants complete all as specified and directed by Engineer-in-Charge
Material and labour for dismantling FRP cooling tower of capacity 50x3 TR at INS Shikra by removing CT Fans, sprinklers, PVC filler and clean cooling tower body by removing scale , dust, dirt and refix PVC filler by cleaning with diluted HCL solution reassembling, connecting , cleaning external surface and applying two coats of approved synthetic enamel paint including writing SM number/ marking and testing etc. complete all as specified and directed
Taking out old unserviceable cooling tower fills sheets of 3X50 TR from the site and supply and fix new fibre fills sheet of same size for cooling tower as per the existing at site and all as specified and directed at INS Sikra AC Plant
Taking out old unserviceable cooling tower nozzles and supply and fix new cooling tower nozzles suitable for 3x 50 TR Mihir make cooling tower as per existing at INS Shikra
Material and labour for disconnecting condenser for descaling, plugging them & providing of 15mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7flush with fresh water mixed with sodium carbonate tubes and cleaning with nylonbrush after closing the end covers, circulating diluted acid solution as specified above, to maintaine PH value as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed by Engineer-in-Charge.
Replacement of Compressor Oil with new Compressor oil of Frizol 68 all as specified and directed by Engineer-in-Charge.
Removing old unserviceable discharge valve 25mm dia and supply and fix new discharge valve of size 25mm dia suitable for R-22 gas discharge line all as specified & directed.
Supply and fix in replacement of unserviceable / wornout 'V' belt of compressor, AHU etc of make fenner Dunlop / Nurlon as approved
Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 125 mm dia
Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 100 mm dia
Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 80 mm dia
Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 100 mm dia:
Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 80 mm dia:
Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 50 mm dia:
Removing the unserviceable solenoid valve 5/8" flare from the liquid line and supply and fix new solenoid valve 5/8" suitable for AC plant of various capacities complete with all as specified and as directed by Engineer-in-Charge
Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) as per IS 13095 of size 125 mm bore .Make: AUDCO/SANT/SIR as approved.
Ditto - as per item above but 100 mm bore.
Ditto - as per item above but 80 mm bore.
Ditto - as per item above but 65 mm bore.
Taking down old unserviceable Non Return valve and supply and fix new CI Non Return valve of size 100 mm Bore. Make: -Kirloskar /Kartar/Zolota/Leader as approved
Ditto - as per item above but 80 mm bore.
Ditto - as per item above but 65 mm bore.
Taking down old unserviceable Strainer of any make and size and supply and fix new Strainer of size 100 mm Bore.Kirloskar /Hammer/Zolota/Leader as approved
Ditto - as per item above but 80 mm bore.
Supply and fix Condensor safety valve suitable for chiller unit all as specified and directed by Engineer-in-Charge.
Removing old unserviceable over load relay assembly and supply fixing new overload relay assembly of same make and capacity all as directed.Make: L & T or its equivalent
Removing old unserviceable timer and supply & fix NewTimer of L&T make for Condenser motor all as specified & directed.
Supply and charge refrigerant R-22 Gas as per requirement.
Removing old unserviceable power contactor and supply & fix new power contactor 3TF-47 all as specified & directed by Engineer-in-Charge Make : Siemens or equivalent
Removing old unserviceable power contactor ML-2 and supply & fixing new power contactor ML-2 all as specified & directed.Make:L&T/Siemens/BCH
Removing old unserviceable power contactor ML-3 and supply & fixing new power contactor ML-3 all as specified & directed. Make:L&T/Siemens/BCH
Removing old unserviceable Auxilary contactor and supply & fix new Auxilary contactor all as specified & directed by Engineer-in-Charge. Make : L & T or equivalent
Removing old unserviceable power contactor and supply & fix new power contactor MNX -32 all as specified & directed by Engineer-in-Charge Make : L & T or equivalent
Removing the unserviceable pressure gauges HP/LP/OP from existing position and supply and fixing new pressure gauge of capacity 0 to 30Kg. / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge
Removing the unserviceable water pressure gauges from water line & supplying and fixing new water meter up to pressure 0-7Kg. / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge
Material and labour for scraping cleaning & preparation of external surface & painting complete installation of 32.5 x 2 TR (65TR capacity) including compressor, motor, piping, cooling tower, condensor, AHU & panel board etc with two coats of synthetic enamel paint over a coat of primer as per direction on colour code as given including writing SM & MES numbers complete all as per specified & as directed by Engineer-in-Charge
Material and labour for scraping cleaning & preparation of external surface & painting complete installation of 50 x 3 TR (150TR capacity) including compressor, motor, piping, cooling tower, condensor, AHU & panel board etc with two coats of synthetic enamel paint over a coat of primer as per direction on colour code as given including writing SM & MES numbers complete all as per specified & as directed by Engineer-in-Charge
Material and labour for cleaning complete DX type cooling coil of AHU with chemical solution caustic soda to remove impurities dust and foreign materials, complete with nylon brush and cleaning cooling coil with fresh water complete all as specified & directed for the cooling coil section of AHU of 3x50 TR Capacity AC plant at Boatpool Workshop.
Material and labour for disconnecting for Chiller descaling & Plugging them & providing of 15 mm tee outlet for local circulation of mild acid solution in the Chiller (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7, flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & PH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure of 3x50 TR capacity at INS Shikra ACplant complete all as specified & directed by Engineer-in-Charge.
Material and labour for repairs to Microprocessor of 50 TR Capacity chiller unit including replacing diods , transistors and wiring etc for AC Plant at INS SHIKRA all as specified and directed
Material & Labour for LP/HP/OP cut out KP-1 Including taking down old one. Make:- Indofoss
Removing the unserviceable solenoid coil and Supply and fix new solenoid coil suitable for AC plant of various capacities complete with all as specified and as directed
Removing the unserviceable chiller water sensor and supplying and fixing new chiller water Sensor of suitable capacity complet all as specified & directed by Engineer-in-Charge
Removing the unserviceable pressure Sensor HP / LP / OP from and supplying and fixing new pressure Sensor of suitable capacity complet all as specified & directed by Engineer-in-Charge
Supply and errect factory fabricated rectangular square duct made out of 24 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal the longitudinal joints with and including approved sealant complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable insulation from any surface and supply and fix nitrile rubber insulation (Armaflex)of one layer of 19mm thickness sticking on surface by using approved adhesive and sealing the joints by weather proof tape all as directed by Engineer-in-Charge.
Taking out old unserviceable AHU body & supply and fixing of factory fabricated double skin powder coated GI sheet of 21 gauge, 43 mm thick puf insulated CFC free for AHU body including proper door handles, corner supports cutting, bending, welding/ brazing/ wooden work/ structural support all as specified and directed by Engineer-in-Charge
Supply and fix in repairs DX type cooling coil made out of copper of any size and any rows suitable for 30000 CFM AHU unit complete all as specified
Supply and fix in repairs centrifugal fan blower set backward curved fan 640 RPM having velocity 8.84 M/Sec including drum and shaft absorbing power 9.6 KW along with anti-vibration spring isolators for minimizing vibrations (Blow/draw through type) suitable for 30000 CFM of the AHU unit all as specified and directed.
Supply and fix in repairs TEFC squirrel cageIP-55 protected VFD compatible induction motor of capacity 11 KW ,3 phase, 415 volts, 50 Hz ,1450 RPM suitable for 30000 CFM AHU unit and fixed on AHU base plate with suitable size nuts, bolts, washers including making electric connections of motors, earth connections with suitable size copper conductor cables, suction and delivery pipes connections complete all as per manufacturers instructions. Make:- Kirloskar/CG/NGPE complete all as specified
Material & labour for anodised aluminium frames for AHU Panel with one or more rebates, welding, jointing cleats for fixing etc complete all as specified and directed
Taking down old unserviable diffusers / grill and supply and fix new suppli air diffusers / grill made of aluminum powder coated with damper as per existing size .
Taking down old unserviable Fire damper and supply and fix new Fire damper made out of GI sheet 16 G with fusible plug as per existing size
Supply and fix in repairs volume control damper made out of galvanized iron or anodized aluminium with overlapping leafs to avoid any leakage from the damper suitable for AHU as per existing at site complete all as directed by Engineer-in-Charge
Supply and fix in repairs leather type canvas in AHU duct of any size as per existing at site
Taking down old unserviceable AHU pre filter and Supply and fix new AHU pre filters (EU-4)synthetic non oven type efficiency 90% down to particular size of 10 micron double knitted twisted polymer fabric (washable) rated with press drop of 6 mm WC to be mounted in AHU filter assembly size as per existing. Make: ASPAWYMAN/DYNA/MHP as approved
Material and labour for framed work with structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as directed including applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer complete all as specified.
Rewinding of unserviceable electric motor 3 phase 50 Hz 415volt of following capacity pump set complete comprises as under :- (a) Disconnecting & removing the electric motor from installed position including, loading, unloading and transporting to approved workshop. (b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class 'F' insulation. (c) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continuously to check the RPM etc. to the satisfactory performance etc. complete. NOTE: Any damage caused during handling will be made good by contractor without any extra cost to department
(a) 20 HP Chiller Water Pump Motor .
(b) 15 HP Condenser Water Pump Motor.
(c) 5.0 HP Condenser Water Pump Motor.
(f) 50 HP Compressor Motor .
(g) 60 HP Compressor Motor .
(g) 10 HP AHU Blower Motor .
Over hauling of Monoblock pump set after removing from the base plate, disconnecting from pipe line, dismantling the pump set, replacing unserviceable gland packing, gun metal bush bearing water seal applying grease etc. complete and reassembling the pump set connecting with pipe line reconnection of electric supply, including buts bolts, gaskets etc. complete testing of pumps for smooth functioning with following capacity of pumps and motors:-
(a) 20 HP Chiller Water Pump Motor .
(b) 15 HP Condenser Water Pump Motor.
(c) 5.0 HP Condenser Water Pump Motor.
(f) 50 HP Compressor Motor .
(g) 60 HP Compressor Motor .
(g) 10 HP AHU Blower Motor .
MANNING OPERATION AND ROUTINE MAINTENANCE OF RO PLANT INCLUDING SUPPLY OF ESSENTIAL CHEMICALS PART-I Manning and Operation of R.O Plant in three shifts round the clock 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 Hrs including sunday and holiday with cleaning and up keep of the installation operating the submersible pump installed in raw water bore well -02 Nos and operation of treated water pump set including taking care from any pilferage, theft or damage of RO plant etc complete all as specified and directed by Engineer-in-Charge. Notes :- (i) RO operator : 01 No per shift (ii) RO Plants- 02 Nos. (iii) Quoted rate shall be deemed to be for the both RO Plant and shall have out put water capacity not less than 40,000 liters per day. (iv) The Quality of out put water shall confirm to IS 10500 of 1991.
PART-II Routine maintenance of RO plants No. 1 & 2 installed at Vandana and Vishakha complex having out put capacity of drinking water not less than 40,000 ltrs / day, maintenance of chlorine dosing system,coagulant dosing system,antiscalant dosing system carrying out the routine maintenance recommended by the manufacturer for daily, weekly, monthly and quarterly including repairs/ replacement of parts such as bearings, repairs of pumps, filters, welding of cracked/ broken any mild steel items/ foundation, PVC pipes and their fittings, LT panel boards etc complete including painting to all equipment with synthetic enamelled paint complete and all as specified & directed by Engineer-in-Charge including testing of treated water in the approved laboratory for bacteriological test and potability test for every month. Notes :- (a) Chemicals required for operation of RO plant will be measured and paid seperately under Schedule 'A' Part - III (b) RO Plant shall be maintained for smooth functioning and for out put capacity of drinking water not less than 40,000 liters / per day.
PART-III Material and labour for overhauling and including replacement of minor spare parts of submercible pump of installed at Vandana and Vishakha complex complete all as specified and directed by Engineer-in-Charge.
Supply only Antiscalant chemical (Make : Aquachem /Acqua filtron/GE )
Supply only cleaning Chemical (Make: Aquachem/Agua pure/GE )
Disconnecting and taking out unserviceable multiple valve and supply fix with new multiple valve of RO plant complete to match the existing and connecting up with existing system including all accessories complete all as specified and directed by Engineer-in-Charge. Make :- DEWS Aircon / Flow Max / Initiative
Disconnecting and taking out unserviceable cartridge filter and supply fix with new cartridge filter of RO plant complete to match the existing and connecting up with exisiting system including all accessories complete all as specified and directed by Engineer-in-Charge
Disconnecting and taking out unserviceable carbon filter and supply fix with new Carbon filter of RO plant complete to match the existing and connecting up with exisiting system including all accessories complete all as specified and directed by Engineer-in-Charge
Taking out old unserviceable membranes and supply & fix new Reverse Osmosis membrane all as specified and directed by Engineer-in-Charge. Make: Hydranautic/GE/ DOW/CSM
Disconnecting and taking out unserviceable Bore well submersible pump 3.0 HP and supply fix with new Bore well submersible pump horizontal type 3.0 HP capacity,Three phase,2880 rpm,50hz,head-80.5 meter, discharge-1.11 lps complete to match the existing and connecting up with existing control / electric system including all accessories complete all as specified and directed by Engineer-in-Charge. Make:KSB/CG/Kirloskar
Disconnecting and taking out unserviceable induction motor of 1.5 HP and supply fix with new induction motor of 1.5 HP Capacity, 3 phase,2860 rpm,50 HZ,415 Volts,Head range 35-50 meter complete to match the existing and connecting up with existing control / electric system including all accessories complete all as specified and directed by Engineer-in-Charge.Make:Texmo/CG/Kirloskar
Disconnecting and taking out unserviceable open well submersible pump 1.5 HP and supply fix with new open well submersible pump horizontal type 1.5 HP capacity,single phase,2880 rpm,50hz,head-30 meter,discharge-3.42 lps complete to match the existing and connecting up with existing control / electric system including all accessories complete all as specified and directed by Engineer-in-Charge.Make:Texmo/CG/Kirloskar
Disconnecting and taking out unserviceable control panel and supply fix with new control panel for RO plant complete to match the existing and connecting up with existing control / electric system including all accessories complete all as specified and directed by Engineer-in-Charge.
Supply and demonstration of chlorine residual test kit portable digitally operated range 0.1-1 PPM and 0.6 to 6 PPM with enclosure & orthodin solution bottle 500 ml capacity complete all as spificied and directed.
Supply and fix in repair LT Cable on wall/floor/ceiling with proper saddles, including testing of XLPE Insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 2.5 sq mm 3 core.
Taking down old existing CPVC pipes , supply & lay CPVC pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 40 mm Make:prince/sudhakar/Ashirvad
Disconnecting and taking out unserviceable sand core from FRP filter and supply fix with new sand core in FRP Filter of RO plant complete to match the existing and connecting up with existing system including all accessories complete all as specified and directed by Engineer-in-Charge.
Disconnecting and taking out unserviceable carbon media from FRP filter and supply fix with new carbon media for water softner in FRP Filter of RO plant complete to match the existing and connecting up with existing system including all accessories complete all as specified and directed by Engineer-in-Charge.
Disconnecting and taking out unserviceable FRP Housing of membrane and supply fix with new FRP Housing of membrane for supporting and balanceing existing membrane of RO plant complete to match the existing and connecting up with existing system including all accessories complete all as specified and directed by Engineer-in-Charge.
M & L for Rewinding of unserviceable induction motor of 1.5 HP capacity 3 phase 50 Hz 415volt complete comprises as under :- (a) Disconnecting & removing the electric motor from installed position including, loading, unloading and transporting to approved workshop. (b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class 'F' insulation. (c) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continuously to check the RPM etc. to the satisfactory performance etc. complete. NOTE: Any damage caused during handling will be made good by contractor without any extra cost to department
cooltech engineering services
shakti engineering and electrical works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .