Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 0 BAANGAD WALTERGANJ BASTI BASTI UTTAR PRADESH 272182 | BASTI | UTTAR PRADESH | 272182 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Sept 2023, 2:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EDC BASTI
Replacement overloaded TF and Erection of new DT under EDD-III basti under B.P. head 2023-24 on semi Turnkey Basti
2023_PVVNV_834728_2
103/EDC(B)/2023-24
Open Tender
Electrical Works
Turn-key
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹3,540
SE EDC
₹10,000
3 Nov 2023
12 Sept 2023
20 Sept 2023
12 Sept 2023
19 Sept 2023
12 Sept 2023
New 11/0.4 KV Substation
Safe Loading carrige & Unloading of PCC Poles from store to different work site at substation Goukhor,Saltuawa, Munderwa, Mahso& Kudraha.
Safe Loading & Carriage 25 kva Transformer from store to different work site Vill Pikaura.
Safe Loading & Carriage 63 kva Transformer from store to different work site Vill Bhitiya Chauraha, Mustfabad, Kakrahwa, Umri,& Saltuawa Market.
Safe Laoding& Carriage 100 kva Transformer from store to different work site Vill Parsa Hajjam, Umri ahra, Machhli Mandi & Bodwal
Safe Loading & Carriage 10 kva Transformer from store to work site Vill Mahsin.
Loading carrige & Unloding of Remaining HT/LT Line material from store to Different work site substation Goukhor,Saltuawa, Munderwa, Mahso & Kudraha.
Errection of Single PCC Pole with all fitting at Different site of Vill Bhitiya Chauraha,Kakrahwa, Umri,& Saltuawa Market.
Errection of Double PCC Pole with all fitting at Different site of work site Vill Bhitiya Chauraha, Mustfabad, Kakrahwa, Mahsin, Pikaura, Parsa Hajjam, Umri Ahra, Machhali Mandi, Bodwal, Umri,& Saltuawa Market.
Errection of T-off PCC Pole with all fitting at Different site of Vill Bhitiya Chauraha,Kakrahwa, Umri,& Saltuawa Market.
Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT Overhead 3 Phase Line
Stringing, Tensioning & Binding of ABC Cable Size 3X95 Sq MM In LT Line ABC Vill Saltuawa Market
safe mounting & charging of 10/25/63/100 KVA Transformer on double pole structure
Earthing of PCC Pole satnderd specifications
Grouting of PCC Pole with Cement Bricks Ballast & coarse sand as per satnderd specifications
Supply of Droper Clamp & Fixing at the Proper Place
Supply of Cross Arm Clamp & Fixing at the Proper Place
Supply of Danger Board
Supply of Top/T-Off Clmap channels & Fixing at the Proper Place
Supply for T/F Lug size 150/240 mm sq. & Fixing at the Proper Place
supply of fuse set Clamp & Fixing at the Proper Place
supply of F Bracket with Clamp & Fixing at the Proper Place
Fixing of Stay Rod & its Erection by fitting of stay Clmap, Stay wire & Its Proper Binding & Tightening
Construction of Transformer plinth Size 2X2X1.5 Mtr Solid with Bricks Work in ratio 1:4:8 with Cement,Coarse Sand and Bricks ballast laid on the base and 75mm thick on all the expoesd sides to the plinth for 250/400 kva transformer Vill Trimurti Chuaraha Munderwa, Lalganj Chauraha,
Disrtribution Transformer 250/400 KVA fencing size 3X2.4 mtr including cost of MS angle size 40X40X5mm & MS Flate size 35X5 fixing of welded steel wire fabricks of steel frame with required all material Under EDSD Bankati , Lalganj, Kudraha, Gayghat, Mahadewa, bankati, Mahso & Under EDSD II Vill Trimurti Chauraha,Rampur Rewati, Bodwal Bazar, Bodwal Goan, Salehpur, Kurthiya, Chhapiya Chhitauna, Near Power House,Near New Thana 1, Near new Thana 2 , Near Old Thana
Capacity Enhancment
Safe Loading & Carriage of 63 kva Transformer From Store Centre Basti to Different Vill Work Site under EDD-III Basti
Safe Loading & Carriage of 100 kva Transformer From Store Centre Basti to Different Vill Work Site under EDD-III Basti
Safe Loading & Carriage of 250 kva Transformer From Store Centre Basti to Different Vill Work Site under EDD-III Basti
Safe Loading & Carriage of 400 kva Transformer From Store Centre Basti to Different Vill Work Site under EDD-III Basti
Safe Mounting & Charging of 63/100/TF on Double Pole under EDD-III Basti
Safe Mounting & Charging of 250/400 TF on Plinth under EDD-III Basti
Safe Unmounting of 25/63 /100 kva TF Old & Used from Double Pole under EDD-III Basti
Safe Unmounting of 250 TF Old & Used from double pole/Plinth under EDD-III Basti
Safe Loading & Carriage of 25/63/100 kva transformer from different work site under EDD-III Basti to Store center Basti
Safe Loading & Carriage of 250 kva transformer from Plinth work site under EDD-III Basti to Store Center Basti
Supply & fixing of Alluminum lug For 63/100/250/400 KVA TF Suppply
M/S MUDRAWATI
M/S CHAUDHARY CONSTRUCTION COMPANY
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .