Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.3 L+₹21,528.63 (19.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.4 L+₹25,504.85 (23.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.4 L+₹28,505.78 (26.0%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
15 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O FOOTPATH WITH DRAIN/CROSSING AB. RASHID AND OTHERS (W3) BLOCK VERINAG
2026_RDPR_315223_12
ENIT57of2026-27
Open Tender
Civil Works
Percentage
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,500
18 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Engangement of labours for site clearence ,cutting down odf trees etc | - | no | - | - |
| 0.0 | Surface Dressing of the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m in all kinds of soil | - | Sqm | - | - |
| 0.0 | Earthwork in excavation by manual means over areas ( exceeding 30cm in depth 1.5m in width as well as 10 Sq.m on plan including disposal of excavated earth lead upto 50m and lift upto 1.5m in all kinds of soil | - | Cum | - | - |
| 0.0 | P/L OF stone soling hand packed tightly i/c carriage by MT | - | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | 1 | Cum | - | - |
| 0.0 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 graded stone aggregate 20mm nominal size | - | Cum | 1 | - |
| 0.0 | Reinforcement for RCC work including straightening, bending, cutting, placing in position and inding all complete, hot red deformed bars @ 90kgs/cum | 1 | kg | - | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job Slab | - | Sqm | 1 | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job Abuts | - | Sqm | - | - |
| 0.0 | Carriage of material by MT of 35 Kms and HL 50m | 1 | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1022000.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .