Capital (Works)
ELECTRICAL
10 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We have read the various conditions attached/referred to in this tender document and agree to abide by the said conditions.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking.
The Tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum o f work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.
The tenderer shall go through the entire tender documents thoroughly and strictly adhere the instructions and directions given at different pages.
(i)For all the tenders having advertised cost of Rs. 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. (ii)This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.(iii)The option so exercised, shall be an integral part of the bidder's offer.(iv)The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.(v)In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC:(a)The LC shall be a sight LC.(b)The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.(c)SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15 % per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills. (d)The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work.(e)The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by Contractor.
(f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.(g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.(h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.(i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j)The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.(k)The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch0.(m)The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.(n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened.(o)The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor.(p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC.
Sr. DEN/south/MDU jurisdiction: Provision of Additional PF shelter 2 Bays at 4 stations and 3 Bays at 2 stations and 4 Bays at RJPM & 5 Bays at TCN (Total 8 stations. TTL, RJPM, SNKL, KIF, EKN, TCN, MEJ and RVS) - Electrical power supply and Lighting arrangements
U-E-OT-2026-12-01
U-E-OT-2026-12-01
Open
Works - General
3 Months
Madurai, Tamil Nadu
₹0
₹32,700
31 Jul 2026
9 Jul 2026
17 Jul 2026
60 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,98,457.14 | ||
| — | 1015.00 | — | — | ||
| Supply and laying of 6 SWG GI wire for earth continuity. | — | — | — | 22,330 | |
| — | 116.00 | — | — | ||
| Excavation of cable trench in all kinds of soil including refilling as per enclosed specifications and drawing. (Only cable will be supplied by Railways). | — | — | — | 28,420 | |
| — | 190.00 | — | — | ||
| Excavation of cable trench across the concrete flooring/Road/Track including refilling as per enclosed specifications and drawing. (Only Cable will be supplied by Railways). | — | — | — | 77,520 | |
| — | 30.00 | — | — | ||
| Breaking of cement concrete flooring and disposal of material as directed by the Senior section Engineer in-charge | — | — | — | 19,103.1 | |
| — | 30.00 | — | — | ||
| Providing and laying in position cement concrete of 1:3:6 proportion (1 cement :3 sand: 6 graded stone aggregate 20mm nominal size) | — | — | — | 99,954 | |
| — | 19.00 | — | — | ||
| Supply and fixing of cable route indicator made up of cast iron, plate type as per specification in drawing No:CEE/CN/MS/11-2004. | — | — | — | 11,286 | |
| — | 1197.00 | — | — | ||
| Laying of HDPE pipes | — | — | — | 35,910 | |
| — | 1197.00 | — | — | ||
| Drawing of LTUG cables in the existing HDPE pipe laid in the excavated cable trench. | — | — | — | 35,910 | |
| — | 151.00 | — | — | ||
| Laying of LTUG cable | — | — | — | 3,693.46 | |
| — | 151.00 | — | — | ||
| Clamping of LTUG Cable on the wall/structure with painted MS clamps of suitable size with fixing hardwares.( Only cable will be supplied by Railways) | — | — | — | 6,040 | |
| — | 40.00 | — | — | ||
| — | 76.00 | — | — | ||
| — | — | — | 39,726.72 | ||
| — | 368.00 | — | — | ||
| — | — | — | 55,899.2 | ||
| — | 31.00 | — | — | ||
| Supply, Fabricate & fixing of MS bracket made up of 40x12 mm Ms flat including fasteners, Pin/shackle insulators etc. For 4 cables and one earth wire over the earth stud as per specification | — | — | — | 18,229.86 | |
| — | 40.00 | — | — | ||
| Supply, erection and testing of earthing arrangements to drg No: CEE/CN/MS/16-2004 | — | — | — | 2,28,240 | |
| — | — | — | 9,36,318.1 | ||
| — | 1140.00 | — | — | ||
| Supply and fixing of PVC wiring conduit,rigid,25mm dia, heavy duty 2mm wall thickness conforming to IS No:9537,part-III in open manner for electrical wiring in all kinds of wall/roof etc., including all accessories. | — | — | — | 69,973.2 | |
| — | 1425.00 | — | — | ||
| Supply and wiring including termination by 3 No's of 1.5 sq.mm PVC insulated flexible copper cables confirming IS No. 694,1100V grade through the existing PVC pipe already laid. (1 No of multistrand cable for Phase +1 No of multistrand cable for Neutral +1 No of single core cable for earth shall be taken as 1m for measurement purpose). | — | — | — | 90,288 | |
| — | 149.00 | — | — | ||
| Erection, testing and commissioning of T 8 LED 18- 20Watts tube light fitting with lamp in the platform shelter / FOB etc with suitable clamp including wiring from ceiling rose to fittings. | — | — | — | 34,074.81 | |
| — | 57.00 | — | — | ||
| Supply, Fixing, testing and commissioning of 40 W (2X20W Retrofit Type) LED Tube light fitting with lamp in the PF shelter with suitable clamp including wiring. | — | — | — | 58,539 | |
| — | 34.00 | — | — | ||
| Fixing, testing commissioning of BLDC ceiling Fan in the shelter with clamp including wiring. (Only Fan will be supplied by Railways). | — | — | — | 11,107.8 | |
| — | 19.00 | — | — | ||
| Fixing, testing and commissioning of Air circulators 600mm sweep, 230V, 50Hz wall mounting type in the existing platform post/piller with suitable clamps to fixing the fans, including wiring between ceiling rose to fan. | — | — | — | 20,064 | |
| — | 285.00 | — | — | ||
| Supply, erection, testing and commissioning of SMC Box of size 150mmX150mmX100mm with 1 No in each of 6A Strip connector, 16A porcelain fuse carrier & ceiling rose, including locking arrangements | — | — | — | 2,04,840.9 | |
| — | 23.00 | — | — | ||
| Supply, fixing of well seasoned wooden control board of size 300X100X60 mm with 3 mm thick hylam decolam sheet, with complete as directed by Engineer in- Charge | — | — | — | 5,396.49 | |
| — | 115.00 | — | — | ||
| Supply, fixing, testing and commissioning of switch and socket 6A- 5Pin type including internal wiring in the existing control board | — | — | — | 9,677.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Correctionslipno1.pdf
ATTACHMENT
Correctionslipno2.pdf
ATTACHMENT
Correctionslipno3.pdf
ATTACHMENT
Correctionslipno4.pdf
ATTACHMENT
Correctionslipno5.pdf
ATTACHMENT
TenderDocumentforPFshelter8stations.pdf Tender Document
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
TenderDocumentforPFshelter8stations.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .