Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 CrAccepted-Finance | ₹17.6 Cr | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹20.3 Cr+₹2.6 Cr (15.0%)Rejected-Finance | ₹20.3 Cr+₹2.6 Cr (15.0%) | L2 | Rejected-Finance 2nd Lowest Bidder |
Tender Value
₹17.6 Cr
EMD Value
₹44.1 L
Closing Date
19 Feb 2024, 10:00 amClosed
Pr. Chief Engineer, RDD
Rural Devlopment department, Gangtok Head Office
MRL06-Kaluk Rincenpong SPWD road to Lower Karthok and 3 other works
2024_CESDA_131702_22
SKPMGSY III
Open Tender
Civil Works - Roads
Percentage
365 days
West Sikkim
Please refer Tender documents.
6 documents required · 6 mandatory
₹1 L
Finance Controller SRRDA
₹44.1 L
Yes
O/o PCE, PMGSY RDD
1 Mar 2024
31 Jan 2024
19 Feb 2024
31 Jan 2024
19 Feb 2024
31 Jan 2024
9 Feb 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MRL06-Kaluk Rinchenpong SWD road to Lower Karthok | |||||
| 1.01 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | - | - | - |
| 1.02 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | - | - | - |
| 1.03 | Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means | - | Hec | 88,494.12 | - |
| 1.04 | Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1 | - | Sqm | 2.96 | - |
| 1.05 | Dismentaling | - | - | - | - |
| 1.06 | Slab | - | - | - | - |
| 1.07 | Below foundation) | - | - | - | - |
| 1.08 | Removing Pipe | - | - | - | - |
| 1.09 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | - | Cum | 256.22 | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_207158.xls
BOQ Document • 0.80 MB
138462232.pdf
Tender Document • 3.91 MB
sbd.pdf
Tender Document • 10.66 MB
138462236.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .