| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹21.0 L (11.5%)Admitted-Finance | ₹2.0 Cr+₹21.0 L (11.5%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹23.0 L (12.6%)Admitted-Finance | ₹2.1 Cr+₹23.0 L (12.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.3 Cr+₹44.5 L (24.4%)Admitted-Finance | ₹2.3 Cr+₹44.5 L (24.4%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹46.1 L (25.3%)Admitted-Finance | ₹2.3 Cr+₹46.1 L (25.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | The Trikuta Engineer L3 | AJAY KAPOOR L2 | V.K. Sales and Construction Co. L6 | CEEKAY EPC PROJECTS PRIVATE LIMITED L4 | M/s R.S CONSTRUCTIONS L5 | VEENA CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Erection of 11KV Line on 9/11/13 mtr long ST Poles with ACSR Dog Conductor for providing Uninterrupted Power Supply to PHE Pumping Station Salmey | |||||||||
| 1.01 | Supply ,Fabrication,Erection,Testing and Commissioning of 15 mtr high GI (Zinc Coated) Self Supporting Towers along with supply and casting of RCC foundation for structure complete including excavation of earth for foundation ,back filing of the same and disposal thereof surplus earth on turnkey basis complete in all respects.(Note: The Drawing of 15 mtr self supporting structure along with RCC Foundation are uploaded in SBD ) along with earthing 4 No. per tower | 18 | No. | 4,50,000 ₹49,50,000 | 4,14,000 ₹54,00,000 | 0 ₹50,94,000 | 18,000 ₹36,18,000 | 6,12,000 ₹51,12,000 | 5,40,000 ₹32,40,000 Lowest |
| 1.02 | 9 mtr. Long ST Pole (ST-410 SP-33) | 26 | No. | 78,000 ₹4,29,000 Lowest | 1,04,000 ₹4,68,000 | 0 ₹4,72,420 | 13,000 ₹5,59,000 | 1,56,000 ₹7,28,000 | 13,000 ₹4,29,000 Lowest |
| 1.03 | 11 mtr. Long ST Pole (ST-410 SP-56) | 20 | No. | 60,000 ₹4,80,000 Lowest | 1,60,000 ₹6,00,000 | 0 ₹5,16,700 | 10,000 ₹5,44,000 | 1,20,000 ₹7,60,000 | 40,000 ₹5,20,000 |
| 1.04 | 13 mtr. Long ST Pole (ST-410 SP-69) | 2 | No. | 7,000 ₹71,000 | 20,000 ₹80,000 | 0 ₹66,480 | 1,000 ₹60,000 | 6,000 ₹51,000 Lowest | 8,000 ₹64,000 |
| 1.05 | 11 KV GO AB Switch 3 phase 3 pole 200 Amp vertical | 5 | Set | 5,000 ₹50,000 | 10,000 ₹45,000 | 0 ₹46,250 | 250 ₹40,250 | 10,000 ₹60,000 | 2,500 ₹37,500 Lowest |
| 1.06 | GI V Cross -arm with top Bracket including clamps | 1,500 | Kg | 15,000 ₹1,95,000 | 30,000 ₹1,80,000 | 0 ₹2,47,500 | 15,000 ₹1,50,000 | 1,500 ₹1,21,500 Lowest | 15,000 ₹2,02,500 |
| 1.07 | GI Channel X-arm including clamps and Angle for braces | 4,000 | Kg | 40,000 ₹5,20,000 | 80,000 ₹4,80,000 | 0 ₹6,32,000 | 40,000 ₹4,00,000 | 4,000 ₹3,24,000 Lowest | 40,000 ₹5,40,000 |
| 1.08 | 50mm² ACSR Rabbit Conductor | 5.5 | Km | 27,500 ₹4,12,500 | 27,500 ₹3,85,000 | 0 ₹5,58,250 | 5,500 ₹6,38,000 | 11,000 ₹3,30,000 Lowest | 27,500 ₹3,85,000 |
| 1.09 | 100mm² ACSR Dog Conductor | 11.8 | Km | 1,77,000 ₹14,86,800 | 2,95,000 ₹14,75,000 | 0 ₹24,80,950 | 17,700 ₹35,57,700 | 59,000 ₹11,21,000 Lowest | 2,36,000 ₹14,16,000 |
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
23 Apr 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Electric Division Udhampur JPDCL
Augmentation of Water Supply Scheme Udhampur Town under AMRUT 2.0
2026_PDD_307105_1
ED/UDH/03 of 2026-27 dt. 01-04-2026
Open Tender
Electrical Works
Turn-key
120 days
In Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Executive Engineer Electric Division JPDCL
₹5.1 L
11 Jun 2026
1 Apr 2026
24 Apr 2026
1 Apr 2026
23 Apr 2026
1 Apr 2026
1 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Erection of 11KV Line on 9/11/13 mtr long ST Poles with ACSR Dog Conductor for providing Uninterrupted Power Supply to PHE Pumping Station Salmey | |||||
| 1.01 | Supply ,Fabrication,Erection,Testing and Commissioning of 15 mtr high GI (Zinc Coated) Self Supporting Towers along with supply and casting of RCC foundation for structure complete including excavation of earth for foundation ,back filing of the same and disposal thereof surplus earth on turnkey basis complete in all respects.(Note: The Drawing of 15 mtr self supporting structure along with RCC Foundation are uploaded in SBD ) along with earthing 4 No. per tower | - | No. | - | - |
| 1.02 | 9 mtr. Long ST Pole (ST-410 SP-33) | - | No. | - | - |
| 1.03 | 11 mtr. Long ST Pole (ST-410 SP-56) | - | No. | - | - |
| 1.04 | 13 mtr. Long ST Pole (ST-410 SP-69) | - | No. | - | - |
| 1.05 | 11 KV GO AB Switch 3 phase 3 pole 200 Amp vertical | - | Set | - | - |
| 1.06 | GI V Cross -arm with top Bracket including clamps | - | Kg | - | - |
| 1.07 | GI Channel X-arm including clamps and Angle for braces | - | Kg | - | - |
| 1.08 | 50mm² ACSR Rabbit Conductor | - | Km | - | - |
| 1.09 | 100mm² ACSR Dog Conductor | - | Km | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 1.42 MB
Tendernotice_3.pdf
PDF • 2.70 MB
BOQ_996564.xls
BOQ • 0.27 MB
Corrigendum1of03.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .