| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC J P AGARWAL ROAD GUARIPUR DHUBRI SIVSAGAR 783331 | DHUBRI | ASSAM | 783331 | L1 | Accepted-AOC Successful bidder | |
| 2 | L2₹36.8 L+₹43,716 (1.20%)Rejected-AOC 2ND FLOOR TRIPTI TOWER GANESHGURI GUWAHATI 05 | KAMRUP METRO | ASSAM | 781001 | L2 | Rejected-AOC Unsuccessful bidder | |
| 3 | L3₹37.3 L+₹91,012 (2.50%)Rejected-AOC VILL SOUTH LENGA PO BORBAKA PS BAIHATA DIST KAMRUP R PIN 781030 | KAMRUP | ASSAM | 781030 | L3 | Rejected-AOC Unsuccessful bidder |
Tender Value
₹36.4 L
EMD Value
₹72,834
Closing Date
1 Nov 2023, 2:00 pmClosed
SE, PWD Guwahati Building Circle-II Ghy-3
O/o the SE, PWD Guwahati Building Circle-II Chandmari Ghy-3
Construction of Brick Boundary Wall along with brick drain for laying of electric cable around the old Dispur Police Station now merged with the Minister Colony, Dispur, Guwahati
2023_PWBNH_32984_1
SE/BII_Minister Colony_B Wall_Drain etc.
Open Tender
Civil Works - Building
Item Wise
30 days
Dispur, Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹72,834
Yes
O/o the SE, PWD Guwahati Building Circle-II Ghy-3
29 Dec 2023
12 Oct 2023
2 Nov 2023
12 Oct 2023
1 Nov 2023
12 Oct 2023
13 Oct 2023
Amount
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand)
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): Raised and cut pointing
Providing and applying White Cement Based Putty of average thickness 1 mm, of approved brand and manufacturer,over the plastered wall surface to prepare the surface even and smooth complete.
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Providing Convertina wire fencing 600mm dia with razor tape wire fitted to M.S. angle of size 65x65x6 mm placed at 2.50m apart as per drawing and embedded in RCC columns and paining the M.S angles with synthetic enamel paint after applying red oxide priming coat including all labour for Scaffolding fitting of concertina wire etc. and materials complete as direction of the department.
HIGH-TECH ECOGREEN CONTRACTORS LLP
BIJAY KALITA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .