| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84.0 LAccepted-AOC | ₹84.0 L | 1 | Accepted-AOC LOWEST |
| 2 | 2₹94.1 L+₹10.1 L (12.0%)Rejected-Finance | ₹94.1 L+₹10.1 L (12.0%) | 2 | Rejected-Finance NOT lOWEST |
| 3 | 3₹96.1 L+₹12.1 L (14.4%)Rejected-Finance | ₹96.1 L+₹12.1 L (14.4%) | 3 | Rejected-Finance NOT lOWEST |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
10 Oct 2018, 5:00 pmClosed
EE (HQ)
A-1/4 UPSIDC Complex Lakhanpur Kanpur
Maintenance of Roads,Drains and Culverts at IA Site-1 (BSR Road) Ghaziabad
2018_SIDC_252195_1
cd_1_18_dt_290518
Open Tender
Civil Works
Item Rate
120 days
(BSR Road) Ghaziabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,168
UPSIDC
₹2.1 L
25 Feb 2020
20 Sept 2018
11 Oct 2018
20 Sept 2018
10 Oct 2018
20 Sept 2018
Amount
Excavation in foundation in ordinary soil (Loam,clay or sand) including lift upto 1.5 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trencehs.
Same as item no.1 above but for one extra lift of 1.50 Mtr.
Cement concrete with 4 cm gauge approved stone ballast, coarse sand and cement in proportion of 8:4:1including supply of all material, labour T&P etc. required for proper completion of the work
Same as item no.3 above but in 10:5:1
M-150 class brick work in 1:3 cement & approved coarse sand of 2.2 FM mortar in foundation & plinth including supply of all material, labour & T&P etc. required for proper completion of the work.
Same As Item No. 5 Above but in 1:6 Cement and coarse sand Mortar
R.C.C. work with cement, approved coarse sand & 20mm gauge approved stone grit in proportion of 1:1.5:3 in slabs & bed block excluding the supply of reinforcement & its bending but including its fixing in position & binding the same with 24 BWG GI binding wire & including the cost of binding wire & including providing & fixing necessary centering & shuttering & its removal after completion of work & supply of all materials, labour T&P etc.required for proper completion of work.
Mild steel (Tor Steel or Plain) in plain work such as R.C.C./R.B.work including bending for proper shape and including supply of Steel and its wastage, bend, hooks and authorised overlapping Shall be Measured, All labour & T&P etc. required for proper completion of the work.
2.5 cm (1") thick 1:2:4 Plain Cement Concrete floor with Cement, Approved coarse sand and 2 cm, (1") graded approved stone grit laid in penals finsihed with 3mm. (1/8") floating coat of neat cement of Cement and marble dust in ratio 5:1 as specified and removing any overlapping mortar at the joints of the penlas if any and giving them a uniform finsih, including supply of all material, Labour,tools & Plants etc. Required for Proper Completion of the Work.
Same as item No. 9 above but 4.00 Cm thick P.C.C. Floor
Cement concrete with 20mm gauge approved stone grit,coarse sand & cemenet in the proportion of 4:2:1 including supply of all material,labour T&P etc.required for proper completion of the work .
Struck pointing with the cement mortar consisting of one part of cement and two part of fine sand of 1.25 fineness moduouls on brick work including racking the joints washing and cleaning and supply of all materials,labour T&P etc. required for proper compltion of the work.
Flush pointing with the cement mortar consisting of one part of cement and two part of fine sand of 1.25 fineness moduouls on brick work including racking the joints washing and cleaning and supply of all materials,labour T&P etc. required for proper completion of the work.
Finishing walls with waterproof cement paints of approved make and quality on new work with three coats to give an even shade including supply of all materials, labour & T&P etc. required for proper completion of the work.
Supply and stacking of 22.4-53 mm gauage hard stone ballast from approved quarry for Top Coat 10 Cm Thick (Loose) including royalty, cartage GST and all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side patries including dressing of road patries as required where metal is to be stacked as per direction of Engineer incharge.
Collection of Screening Material for consolidation of Stone ballast of Approved Quarry Stacked on road side patries including Dressing the Surface Where Materials is to be Stacked including Cost of Material, its Cartage all Taxes, GST royality, T&P etc. Required for Proper completion of the work and as per direction of Engineer-in-charge
Consolidation of 22.4-53mm guage hard stone ballast for 10cm (loose) thick Top-Coat by road roller including hire and fuel charges of road roller, excluding cost of stone ballast and blinding materials but including opening out stacks, sorting ballast into different sizes, spreading making medhi to retain water and also including cost of carriage of materials & water and T&p etc. required for the proper completion of the work, Water for consolidation to be arranged by the contractor at his own cost
Water allowance for Consolidation of Stone Ballast including cost of water, T&P and labour etc. to be allowed from 15th Nov.to 31st May.
Bitumen painting over WBM surface (1st Coat painting) including supply of13.20mm gauge stone grit and bitumen including maintenance of side patries watering them during operation for proper completion of the work as directed by the engineer-in-Charge and also including road roller charges and its fuel wages of fireman tar Boiler and also Supplying of material and all sundries etc. As per MORTH Specification. The Quantity of Grit 13.2mm Guage. in painting will be Used @ 1.50 cum per 100.00 Sqm
Providing and laying 50 mm (Average) thick Bituminous Macadame (B.M.) with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grade premixed with bituminous binder @ 3.3% by weight of total mix and filler transporting the hot mix to work site, by tippers laying with hydostatic material paver finisher with sensor conrol to the required grade, level and alignment rolling with smooth wheeled, vibratory and power rollers to achieve the desired compaction as per MORTH specifications clause 504 complete in all respects and also including cost of tack coat with Bitumen @ 0.20 Kg/Sqm using emulsion pressure distributors on prepared surface cleaned with mechanical brooms
Providing and laying 25 mm thick Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grade premixed with bituminous binder @ 4.5% by weight of total mix and filler transporting the hot mix material to work site, by tippers laying with hydostatic paver finisher with sensor conrol to the required grade, level and alignment rolling with smooth wheeled, vibratory and power rollers to achieve the desired compaction as per MORTH specifications clause 504 complete in all respects and also including cost of tack coat with Bitumen @ 0.20 Kg/Sqm using emulsion pressure distributors on prepared surface cleaned with mechanical brooms
M/S JANARDAN SHARMA
M/S YASH INFRA HEIGHTS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .