Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹26.6 L+₹19,125 (0.72%)Rejected-AOC | L2 | Rejected-AOC REJECT | |
| 3 | L3₹26.7 L+₹31,350 (1.19%)Rejected-AOC | L3 | Rejected-AOC REJECT | |
| 4 | L4₹27.9 L+₹1.5 L (5.64%)Rejected-AOC | L4 | Rejected-AOC REJECT |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
9 Jul 2019, 6:00 pmClosed
GE (AF) SURATGARH
GE (AF) SURATGARH
CAMOUFLAGE PAINTING IN DOMESTIC AREA IN AKASH MARU VIHAR AT AF STATION SURATGARH
2019_MES_258615_1
8736/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) SURATGARH
AS PER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹500
Yes
GE (AF) SURATGARH
₹80,000
Yes
20 Jan 2020
10 Jun 2019
11 Jul 2019
10 Jun 2019
9 Jul 2019
26 Jun 2019
Amount
BOQ (Camouflage Painting in Domestic area in Akash & Maru Vihar at AF Station Suratgarh)
Taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, including removal of rubbish outside MoD land ,complete all as specified and directed by the Engineer in Charge.
Rendering 15 mm thick cement plaster in cement mortar (1:4) on fair faces of brick works or concrete surfaces , finished even and smooth without using extra cement , complete all as specified and directed by the Engineer-in-Charge.
Rough cast plaster over and including 10 mm thick rendering coat in cement mortar 1:4 on fair faces of brick or concrete surfaces.complete all as specified and directed by Engineer-in-Charge.
Complete removal of existing treatment ncluding brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc. and Preparation of old plastered wall /ceiling/ roof surfaces and applying two coats of exterior acrylic emulsion paint (antifungal) , (in camouflage pattern using number of colours) , complete all as specified and directed by the Engineer-in-Charge. Notes for item No.4.00,5 .00 & 6.00 : (i) The contractor shall procure 50% quantity of exterior acrylic emulsion paint required in the work within 15 days from the date of commencment and deposit the same in the custody of Engineer-in-Charge.Engineer-in-Charge shall maintain a record of the material brought and consumed at site in the work and purchase vouchers shall be defaced and verified by the Engineer-in- Charge and same shall be submitted to GE for verification. (ii) Material shall be recorded in MB under proprietary branded material duly signed by all concerned . (iii) Pattern of camouflage shall be approved by GE.
Preparation of new plastered external wall surfaces and applying two coats of exterior acrylic emulsion paint (antifungal) over and including one coat of primer, (in camouflage pattern using number of colours) , complete all as specified and directed by the Engineer-in-Charge.
Preparation of old plastered wall /ceiling/ roof surfaces and applying one coat of exterior acrylic emulsion paint (antifungal) , (in camouflage pattern using number of colours) , complete all as specified and directed by the Engineer-in-Charge.
Complete removal of existing treatment and preparation of old steel or iron surfaces over 10 cm width or girth not other wise described and applying two coats of synthetic enamel paint (of approved shade) , complete all as specified and directed by Engineer-in-Charge.
Preparation of old wooden surfaces of any description, exceeding 10 cm width or girth and applying two coats of synthetic enamel paint (of approved shade) , complete all as specified and directed by Engineer-in-Charge.
Preparation of old wooden surfaces of any description, exceeding 10 cm width or girth and applying one coat of synthetic enamel paint (of approved shade) , complete all as specified and directed by Engineer-in-Charge.
Preparation of old concrete surfaces of any description, exceeding 10 cm width or girth and applying two coats of synthetic enamel paint (of approved shade) to concrete surfaces ( like, road side Stone kreb ) , complete all as specified and directed by Engineer-in-Charge.
Cuting shrubs wild growth/tree not exc 30 cm girth and removing complete vegetation growth from walls including taking out roots from roof/brick work and making good the disturbed surface with PCC 1:2:4 type B0 (using 12.5mm graded stone aggregate after application of copper salphate) and disposing the rubbish from site (MOD land) complete including necessary steel scafolding etc , complete all as specified and directed by Engineer-in-Charge. Note :- Quoted rate of this item shallbe included complete removal of trees/roots/vegetation anywhere in the bldg and any number of times during the progress of work.
Dismantling and repair to joints of CI pipe 100mm bore rubber or fibre board gasket including fixing the joints to wall/floors with brackets , complete all as specified and directed by Engineer-in-Charge.
Dismantling and repair to jonts of CI pipe 75 mm bore with rubber or bigre board gasket including fixing the jonts to walls/floors with brackets , complete all as specified and directed by Engineer-in-Charge.
Cutting of cast iron pipes 100mm bore in position for insertion of new tees, branches etc including fixing the joints to walls/floors with brackets ,complete all as specified and directed by Engineer-in-Charge.
Cutting of cast iron pipes 75mm bore in position for insertion of nefw tees, branchs etc including fixing the joints to wall/floors with brackets, complete all as specified and directed by Engineer-in-Charge.
Preparation of old decorated surfaces of walls, Chhajja, Perapet (Plastered or unplastered) including brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc. including removal of nails stickers etc and filling nails holes, crackes, uneven surfaces with JK/Birla wall putty in multistoried bldgs and applying two coats of white wash, complete all as specified and directed by Engineer –in-Charge.
Repair to RCC members surface area n exc 0.50 sqm on external sides of building such as suspended chajja, RCC soffits, beam/column ends/sides etc by applying 10mm thick cement plaster in cement motar 1:3 in multy storey building including necessary scafolding and shuttering , complete all as specified and directed by Engineer-in-Charge. Notes for item no.16 & 17 : (i) Work shall be executed n multy storey building . (ii) All Safety measures for the safety of workmen shall be ensured by the contractor. Insurance of workers shall also be got done by the contractor before execution of this item. This aspect shall deemed to be included in quoted rates and nothing extra shall be admissible on this ground.
Contract Amount shall be derived after affecting the amount of Schedule of Credit in General Summary on serial page No 15 of tender documents.
shubham enterprises
H S BUILDERS
RATHORE ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .