| Sl No | Description | Qty | Unit | R ARUMUGAM L2 | AR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting BT Road Surface etc., complete | 16 | m3 | 1,000 ₹16,000 Lowest | 1,300 ₹20,800 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock
requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete (Upto 2.00m) | 262 | m3 | 320 ₹83,840 Lowest | 400 ₹1,04,800 |
| 3.00 | Removing the burst RCC pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipeline with sound pipe etc complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the departmental Officers. 3 times of
ordinary rate is allowed since the works are done in odd hours
400 mm dia Pipe (upto 2m) | 21 | Each | 27,300 ₹5,73,300 Lowest | 32,000 ₹6,72,000 |
| 4.00 | Dewatering using 3hp to 70hp diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
Hire charges for Diesel Pump set For 3 HP | 114 | Hrs | 310 ₹35,340 | 150 ₹17,100 Lowest |
| 5.00 | Supplying, Laying and Joining of CI Pipe with socket and spigot ends for LA Class as per IS 1536/2001 etc complete as directed by Engineer-in-charge
400mm CI LA Class Pipe - Depth upto 2.00m | 50 | m | 15,000 ₹7,50,000 Lowest | 18,000 ₹9,00,000 |
| 6.00 | Refilling the trenches with suitable excavated earth available along the alignment after the pipes & specials are laid, jointed & tested in layers & watering, ramming & consolidation directed by the Engineer-in-Charge. | 255 | m3 | 45 ₹11,475 Lowest | 50 ₹12,750 |
| 7.00 | Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance. | 8 | m3 | 120 ₹960 | 100 ₹800 Lowest |
| 8.00 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer. | 128 | m | 54 ₹6,912 | 20 ₹2,560 Lowest |
| 9.00 | Hire charges for portable Genset 1.00 KVA with 2 Nos. of 150W flood light including all incidental charges, transportation, crew charges and fuel charges etc., complete. | 7 | Day | 1,500 ₹10,500 | 500 ₹3,500 Lowest |
| 10.00 | Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the departmental officers.
140mm PVC 6Ksc Pipe | 26 | m | 1,000 ₹26,000 | 900 ₹23,400 Lowest |
Tender Value
₹32.0 L
EMD Value
₹32,034
Closing Date
13 Mar 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Attending the Burst and Replacing and Anuppanadi SPS Pumping line Bursts and Providing Sluice Valve and Air Valve in Anuppanadi Main Road in Ward No.87.
2026_MAWS_669379_1
Z4 / E8 / Est.467 / 25-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹32,034
16 Jul 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting BT Road Surface etc., complete | 16 | m3 | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock
requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete (Upto 2.00m) | 262 | m3 | - | - |
| 3 | Removing the burst RCC pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipeline with sound pipe etc complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the departmental Officers. 3 times of
ordinary rate is allowed since the works are done in odd hours
400 mm dia Pipe (upto 2m) | 21 | Each | - | - |
| 4 | Dewatering using 3hp to 70hp diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
Hire charges for Diesel Pump set For 3 HP | 114 | Hrs | - | - |
| 5 | Supplying, Laying and Joining of CI Pipe with socket and spigot ends for LA Class as per IS 1536/2001 etc complete as directed by Engineer-in-charge
400mm CI LA Class Pipe - Depth upto 2.00m | 50 | m | - | - |
| 6 | Refilling the trenches with suitable excavated earth available along the alignment after the pipes & specials are laid, jointed & tested in layers & watering, ramming & consolidation directed by the Engineer-in-Charge. | 255 | m3 | - | - |
| 7 | Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance. | 8 | m3 | - | - |
| 8 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer. | 128 | m | - | - |
| 9 | Hire charges for portable Genset 1.00 KVA with 2 Nos. of 150W flood light including all incidental charges, transportation, crew charges and fuel charges etc., complete. | 7 | Day | - | - |
| 10 | Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the departmental officers.
140mm PVC 6Ksc Pipe | 26 | m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Doc.pdf
Tender Documents • 0.82 MB
BOQ_804306.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .