Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Fee/PreQual/Technical/Finance | -27.60% | ₹15.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹16.0 L+₹32,400 (2.07%)Admitted-Fee/PreQual/Technical/Finance KANCHALHKOOT | KANNAUJ | UTTAR PRADESH | 209720 | -26.10% | ₹16.0 L+₹32,400 (2.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹16.0 L+₹34,581.60 (2.21%)Admitted-Fee/PreQual/Technical/Finance | -26.00% | ₹16.0 L+₹34,581.60 (2.21%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹16.9 L+₹1.3 L (8.29%)Admitted-Fee/PreQual/Technical/Finance | -21.60% | ₹16.9 L+₹1.3 L (8.29%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹17.0 L+₹1.4 L (8.98%)Admitted-Fee/PreQual/Technical/Finance | -21.10% | ₹17.0 L+₹1.4 L (8.98%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.6 L
EMD Value
₹64,800
Closing Date
3 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
DEWAT AT DIYAROO KARSHNGAM (18KLD)
2026_RDPR_313860_4
E-NIT 34 of 2026-2027
Open Tender
Civil Works
Percentage
30 days
office of the executive engineer rew ang
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹64,800
7 Jul 2026
27 Jun 2026
4 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includin disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 171.9 | cum | - | - |
| 2 | Providing and Filling in foundation with granite / trap broken metal 100mm. And down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications | 8.86 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 5.91 | cum | 1 | ₹5.9 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete in walls including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level . 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 36.12 | cum | 1 | ₹36.08 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.45 | cum | - | - |
| 6 | Extra for use of water proofing compound in cement concrete grade of M20 at one kg of compound per bag of cement. | 332.54 | kgs | - | - |
| 7 | Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. .ncl. carriage by M.T lead 1 km. | 4.16 | MT | 0.29 | ₹1.21 |
| 8 | Formwork of ordinary timber planks for in situ concrete work including removal and all complete. | 16.92 | sqm | - | - |
| 9 | Formwork of ordinary timber planks for in situ concrete work including removal and all complete. | 163.24 | sqm | - | - |
| 10 | Formwork of ordinary timber planks for in situ concrete work including removal and all complete. | 39.07 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1015971.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .