Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | ₹30.1 L | L1 | Accepted-AOC TECHNO COMMERCIALLY EVALUATED L1 BIDDER |
| 2 | L2₹31.6 L+₹1.5 L (5.11%)Rejected-Finance | ₹31.6 L+₹1.5 L (5.11%) | L2 | Rejected-Finance REJECTED AS L2 BIDDER |
| 3 | L3₹34.3 L+₹4.2 L (13.9%)Rejected-Finance | ₹34.3 L+₹4.2 L (13.9%) | L3 | Rejected-Finance REJECTED AS L3 BIDDER |
| 4 | L4₹35.4 L+₹5.3 L (17.7%)Rejected-Finance | ₹35.4 L+₹5.3 L (17.7%) | L4 | Rejected-Finance REJECTED AS L4 BIDDER |
| 5 | L5₹36.5 L+₹6.4 L (21.4%)Rejected-Finance | ₹36.5 L+₹6.4 L (21.4%) | L5 | Rejected-Finance REJECTED AS L5 BIDDER |
| Sl No | Description | Qty | Unit | SUNNY MAHANAND L4 | RABINDRA NATH BISWAL L3 | Nikita Sahoo L1 | kisan Sihis L5 | ASHIS KUMAR SETHI L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG Mine by chiselling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30m. And lift up to 1.5m. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 163.05 | Cum | 6,516.43 ₹10,62,503.91 Lowest | 6,708.87 ₹10,93,881.25 | 6,532 ₹10,65,042.6 | 7,926.18 ₹12,92,363.65 | 6,866 ₹11,19,501.3 |
| 2.00 | Providing and laying in position specified grade of Reinforced cement concrete excluding the cost of centering, shuttering finishing, reinforcement and carriage of material from incline mouth to UG mine site. A work up to plinth level, 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) (P.C.C. WORK). | 83.51 | Cum | 7,227.21 ₹6,03,544.31 Lowest | 7,440.63 ₹6,21,367.01 | 7,244 ₹6,04,946.44 | 8,790.72 ₹7,34,113.03 | 7,614 ₹6,35,845.14 |
| 3.00 | Transportation of materials for to the working site 1ND/2L to 1ND/25L in HR Section-IV. | 66.26 | Cum | 10,427.98 ₹6,90,957.95 Lowest | 10,735.93 ₹7,11,362.72 | 10,453 ₹6,92,615.78 | 12,683.94 ₹8,40,437.86 | 10,987 ₹7,27,998.62 |
| 4.00 | Transportation of materials for to the working site 1ND/118L to 1ND/123L in HR Section-I. | 17.25 | Cum | 11,653.5 ₹2,01,022.88 | 1,197.64 ₹20,659.29 Lowest | 11,682 ₹2,01,514.5 | 14,174.58 ₹2,44,511.51 | 12,278 ₹2,11,795.5 |
| 5.00 | Centering and shuttering including strutting propping etc and removal of form for foundation, footing, bases of column etc for mass concrete. | 310.34 | Sqm | 359.27 ₹1,11,495.85 Lowest | 369.88 ₹1,14,788.56 | 360 ₹1,11,722.4 | 437 ₹1,35,618.58 | 378 ₹1,17,308.52 |
| 6.00 | Drain Cleaning. | 26.52 | cum | 651.65 ₹17,281.76 Lowest | 670.89 ₹17,792 | 653 ₹17,317.56 | 792.63 ₹21,020.55 | 686.6 ₹18,208.63 |
| 7.00 | Loading, Unloading & Transportation of 150 nos (GI pipes/50mm) incline mouth to working site 1ND/2L to 1ND/25L in HR Section-IV & 1ND/118L to 1ND/123L in HR Section-I (Lead 0-1 km). | 1,106 | mtr | 13.66 ₹15,107.96 | 14.06 ₹15,550.36 | 13.5 ₹14,931 Lowest | 16.62 ₹18,381.72 | 14.3 ₹15,815.8 |
| 8.00 | Grouting, fixing with welding of Railing pipes for 1ND/2L to 1ND/25L in HR Section-IV & 1ND/118L to 1ND/123L in HR Section-I (50mm GI pipe provided by Company). | 148 | Hole | 2,031.01 ₹3,00,589.48 Lowest | 2,090.98 ₹3,09,465.04 | 2,035 ₹3,01,180 | 2,470.39 ₹3,65,617.72 | 2,139.9 ₹3,16,705.2 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 5,40,450.74 ₹5,40,450.74 | 5,22,875.92 ₹5,22,875.92 Lowest | - | - | - |
Tender Value
₹48.0 L
EMD Value
₹60,000
Closing Date
22 May 2025, 5:00 pmClosed
Staff Officer(Mining), Orient Area, MCL
Office of the General Manager, Orient Area, MCL, Brajrajnagar, Jharsuguda, Odisha
A. Construction of 592 nos. PCC steps for travelling roadways location 1ND2L to 1ND25L in HR section-IV, B. Construction of 154 nos PCC steps for travelling Roadways location 1ND118L to 1ND123L in HR SeC-I.
2025_MCL_335187_1
MCL/GM/OA/SO(M)/25/NIT256/918
Open Tender
Civil Works - Others
Item Rate
180 days
Orient Colliery 1 and 2 Mine, OSA, OA, MCL
Please Refer Tender Document
3 documents required · 3 mandatory
₹60,000
6 Aug 2025
9 May 2025
23 May 2025
12 May 2025
22 May 2025
12 May 2025
12 May 2025 - 17 May 2025
Amount
Excavation of coal/shale in UG Mine by chiselling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30m. And lift up to 1.5m. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C.
Providing and laying in position specified grade of Reinforced cement concrete excluding the cost of centering, shuttering finishing, reinforcement and carriage of material from incline mouth to UG mine site. A work up to plinth level, 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) (P.C.C. WORK).
Transportation of materials for to the working site 1ND/2L to 1ND/25L in HR Section-IV.
Transportation of materials for to the working site 1ND/118L to 1ND/123L in HR Section-I.
Centering and shuttering including strutting propping etc and removal of form for foundation, footing, bases of column etc for mass concrete.
Drain Cleaning.
Loading, Unloading & Transportation of 150 nos (GI pipes/50mm) incline mouth to working site 1ND/2L to 1ND/25L in HR Section-IV & 1ND/118L to 1ND/123L in HR Section-I (Lead 0-1 km).
Grouting, fixing with welding of Railing pipes for 1ND/2L to 1ND/25L in HR Section-IV & 1ND/118L to 1ND/123L in HR Section-I (50mm GI pipe provided by Company).
Total impact of GST for the purpose of CTC
ASHIS KUMAR SETHI (BID ID -1154996)
RABINDRA NATH BISWAL (BID ID -1154960)
SUNNY MAHANAND (BID ID -1154882)
kisan Sihis (BID ID -1155146)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .