| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.8 L+₹6,795.92 (2.50%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹2.9 L+₹15,154.89 (5.57%)Rejected-Finance | L3 | Rejected-Finance TC recommendation |
Tender Value
₹2.7 L
EMD Value
₹3,500
Closing Date
9 Oct 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repairing Hydraulic test and fitting with Commissioning of Lancashire Boiler No BR 6247 of Kumardihi B Colliery C pit under Bankola Area.
2023_ECL_289988_1
ECL/GM/BA/E TENDER/23-24/EnM/95 Dt. 28.09.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹3,500
23 Dec 2023
29 Sept 2023
10 Oct 2023
29 Sept 2023
9 Oct 2023
29 Sept 2023
29 Sept 2023 - 3 Oct 2023
Amount
Item Description/ Heading
Cleaning of all the ash from the bottom of the boiler by breaking of bricks wall
Cleaning of all the ash from both side flue pass of the boiler by breaking of bricks wall
Cleaning of all the ash from both side furnace of boiler by scraping washing of the same at fire side
Cleaning of all scale by scraping of the boiler shell plate and both the furnace of the boiler at water side & washing the same .
Dismantling of all the fire bar from both the furnce all the valves and depositing the same at colliery store
Cost of boiler cleaning chemical
old both side fusible plug opening boring threading labour charges
New fusible plug both side & same position fitting with IBR TC
Boiler all valve mounting repairing overhauling & inspection by boiler inspector with consumable & labour Charges
isolated peeting of different shell strake to be build up by MMAW Process using low hydrogen electrode and grind smooth
Complete Brick Work of both sides flues pass bottom of the boiler both side furnace with material and loabour charges
Fabrication & fitting of fire bar of L boiler at both side furnace with cost of electrode
Supply & fitting of 20" long 3/4 dia gaguge glass tube
Cocking of leaky rivets & reseting of the same for making leak proof
Lancashire boiler hydrulic test arrangement inspector ( Dirctor of Boiler )
Lancashire boiler fitting purches materials tape joint , cotton tape , steam joint , hole tight , nut , bolt rubber joint , fiber bush , rubber cone gauge glass etc .
Lancashire boiler fitting commissioning steaming & running condition with consumable & labour charges
Total impact of GST for the purpose of CTC
GT ENTERPRISE
SUBHAS ROY
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .