Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹50.0 LAccepted-AOC 308 MANDI ROAD BARWALA 125121 | HISAR | HARYANA | 125121 | ₹50.0 L | 1 | Accepted-AOC Rates are on lowest side |
| 2 | 2₹51.4 LRejected-Finance 1200 HOUSING BOARD COLONY SEC 15 HISAR | HISAR | HISAR | HARYANA | ₹51.4 L | 2 | Rejected-Finance Rates are on higher side as compare to L1 |
| 3 | 3₹51.5 LRejected-Finance VPO DATA DISTT HISAR 125049 | HISAR | HISAR | HARYANA | 125049 | ₹51.5 L | 3 | Rejected-Finance Rates are on higher side as compare to L1 |
| Sl No | Description | Qty | Unit | MANDEEP SINGH L3 | VINOD KUMAR CONTRACTOR L1 | SONU L2 |
|---|---|---|---|---|---|---|
| 1.10 | Less Credit of Old material 40% Bricks bats | 2.27 | Cum | 3 -₹6.81 | 2,500 -₹5,675 | 500 -₹1,135 |
| 1.20 | less credit of Bricks 60% of 294 cum = 176 cum @ 480 Nos. /cum = 8448 Bricks | 25,456 | Nos. | 4 -₹1,01,824 | 5 -₹1,27,280 | 6 -₹1,52,736 |
| 1.30 | less credit of Bricks bats 40% of 294 cum = 118 cum | 35.36 | Cum | 3 -₹106.08 | 2,500 -₹88,400 | 500 -₹17,680 |
| 1.40 | Less Credit of Old Bricks*** | 1,636 | Nos. | 4 -₹6,544 | 5 -₹8,180 | 6 -₹9,816 |
| 1.50 | Less credit of old pumping machinery 1600 lpm 40 mtr head 25 BHP. | 2 | Nos. | 3 -₹6 | 10,000 -₹20,000 | 15,000 -₹30,000 |
| 1.60 | Less Credit of steel 1 | 500 | Kg | 15 -₹7,500 | 50 -₹25,000 | 30 -₹15,000 |
Tender Value
₹61.3 L
EMD Value
₹1.2 L
Closing Date
1 Apr 2026, 2:00 pmClosed
ADARSH KUMAR SINGLA
Hisar PHED No. 2
Replacement of 100 mm i/d and 150 mm i/d DI pipe line, Provide FHTC 125 Nos., Restoration of water connection 50 Nos. demolishing and const. of B/w 1861 mtr above DPC, rep. of pump chamber, const. of road and Path etc
2026_HRY_509747_1
2026EFE6675F 1614 4563 9B37 1EDDDBC982D8565PUH
Open Tender
Civil Works
350 days
BOBUA
As per DNIT
3 documents required · 3 mandatory
₹5,000
₹1.2 L
Yes
22 Apr 2026
19 Mar 2026
1 Apr 2026
19 Mar 2026
1 Apr 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Less Credit of Old material 40% Bricks bats | - | Cum | - | - |
| 1.2 | less credit of Bricks 60% of 294 cum = 176 cum @ 480 Nos. /cum = 8448 Bricks | - | Nos. | - | - |
| 1.3 | less credit of Bricks bats 40% of 294 cum = 118 cum | - | Cum | - | - |
| 1.4 | Less Credit of Old Bricks*** | - | Nos. | - | - |
| 1.5 | Less credit of old pumping machinery 1600 lpm 40 mtr head 25 BHP. | - | Nos. | - | - |
| 1.6 | Less Credit of steel 1 | - | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_588551.xls
BOQ • 0.26 MB
0F5JQGZ153219.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid