Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC 19 M G WORKS S BLOCK NEAR PONDY ENGINEERS PONDICHERRY | PONDICHERRY | PUDUCHERRY | 605001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.9 LSame as L1Rejected-AOC 4 13A PERIYAR NAGAR THANGAMAPURIPATTANAM METTUR DAM 636 402 SALEM DT TAMIL NADU | METTUR DAM | SALEM | TAMIL NADU | 636402 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
21 Mar 2024, 2:00 pmClosed
CE MTPS II
O/o CE MTPS II
Attending repair works overhauling and Load testing of various capacity electrical hoists in the Bottom ash crusher house Fuel Oil Pump House Ash Slurry Pump House and CT Blowdown Pump House areas
2024_EB_442849_1
OT 199
Open Tender
Miscellaneous Works
Works
30 days
SE MI MTPS II
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,000
Yes
28 Aug 2024
6 Mar 2024
22 Mar 2024
6 Mar 2024
21 Mar 2024
6 Mar 2024
Amount
Overhauling of 2 Ton hoist. (This work involves brought down from 45 mtr to 0mtr level for dismantling of drum, drum top cover, motor , Gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. Reconditioning the rope guide, refitting the above parts and assemble the same at 45 mtr elevation).
Overhauling of 3 (or) 5 Ton hoist. (This work involves brought down from 25mtr to 0mtr level for dismantling of drum, drum top cover, motor , Gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. Reconditioning the rope guide, refitting the above parts and assemble the same at 25mtr elevation).
Overhauling of Secondary Crusher 10 Ton hoist. (This work involves brought down of hoist from 14 mtr to 0mtr level for dismantling of drum, drum top cover, motor , Gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. Reconditioning the rope guide, refitting the above parts and assemble the same at 14 mtr elevation).
Charges for load testing 13 Nos of 2 Ton, 3 Ton & 5 Ton capacity electrical hoist by using required capacity test weighers with the presence of competent authority and site engineer including load testing fees, loading, transporting and unloading of test weighers from central stores of MTPS-I / MTPS-II to the respective hoist and return back the test weighers to central stores of MTPS-I / MTPS-II after completing the load test by using movable type crane.
ANNAI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .