Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAdmitted-Finance | ₹22.9 L | L1 | Admitted-Finance |
| 2 | L2₹25.9 LAdmitted-Finance 6 NO BIJOY NAGAR SAI TOWER NAIHATI NAIHATI GARIFA WEST BENGAL 743165 UDYAM WB 14 0004481 | 24 PARAGANAS NORTH | WEST BENGAL | 743165 | ₹25.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | HI TECH DESIGN ENGINEERING N COSTRUCTION L1 | P.K.DUTTA AND CO. L2 |
|---|---|---|---|---|---|
| 1.00 | Preliminary survey for Identification of 3 alternative routes using satelite imageries (1:25,000 PAN +LISS merged) for NRSA.Google images and Survey of India maps and finalization of most economical, Optimum route showing the topographical and other features upto 8Kms on either side and indicating final selected route alignment and digital modelling final selected route alignment and digital modelling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications. | 40 | KM | 3,400 ₹1,36,000 Lowest | 8,000 ₹3,20,000 |
| 2.00 | Detailed survey along the approved route alignment approval after conducting the preliminary survey by using Modern survey equipment like GPS/DGPS, Total stations including profiling tower spotting and optimization of locations by using computer aided technique like ALTM as well as other activities as detailed in the scope of work using PLS-CADD software and submission of draft report for approval.
a. Drawing the route profile including Geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc.
b. KMZ/KML file of approval route.
c. Levelling of the profile with reference to Survey of India bench marks(MSL) d. Tower Schedule.
e. Line Schedule.
f. Burgle details by using Modern Survey techniques and providing GPS, Co-ordinates at each anchor points for identification of anchor locations indluding permanents marks like poles, telephones lines, buildings etc. | 40 | KM | 21,000 ₹8,40,000 | 18,000 ₹7,20,000 Lowest |
| 3.00 | Providing and fixing RCC pillar (M-20) of size 150 X 150 X 1000 mm, with approved marks including painting above the ground level and yellow lettering and marking the direction of incoming and outgoing lines are to be marked clearly on the top with red colour.IF the distance between such anchors points is more than 1KM one more directional stone is to be fixed. So also, for the road crossings, railway crossing and nala crossings on both the sides. | 41 | Nos (Each Stone) | 3,200 ₹1,31,200 | 3,000 ₹1,23,000 Lowest |
| 4.00 | Digitized contouring at undulated/hilly tower locations as detailed in technical specifications for assessing the quantum of benching and revetment required and submission of draft report of the work | 1 | Location | 15,000 ₹15,000 | 10,000 ₹10,000 Lowest |
| 5.00Preparation of Schedule and Documents | |||||
| 5.01 | PTCC Proposal containing PTCC questionnaires, topo sheet extracts with marking of the proposed line, SR report, tower sketch, station single line diagram etc. (10 copies/set) | 1 | Per Set | 19,980 ₹19,980 Lowest | 20,000 ₹20,000 |
| 5.02 | Tree schedule containing the details like name of tree, girth size, distance from central line of the alignment, approx height of tree etc., complete and submission of draft report for approval .The details shall be surveyed no.wise along the corridor. (As Per Technical Specification) | 40 | KM | 2,500 ₹1,00,000 Lowest | 2,500 ₹1,00,000 Lowest |
| 5.03 | Railway Crossing proposal with drawing inclusive of graph sheets and other stationery materials, labour etc. (6 sets/crossing) | 2 | Per Crossing | 20,000 ₹40,000 | 10,000 ₹20,000 Lowest |
| 6.00 | Submission of Detailed consolidated report on the surveying work done appending all approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos taken at site and submitting soft copies of all documents and report in 6 sets. The detailed report shall contain following approved draft reports.
Preliminary Report
Detailed Survey Report
Soil classification report with location wise
Tree Schedule
Line Schedule
Burgie details
Digitized contours
Digitized village map geo reference and superimposed on the line corridor | 1 | Job | 1,00,000 ₹1,00,000 | 75,000 ₹75,000 Lowest |
| 7.00 | Preparing of proper layout drawing of the switchyard of Namrup GSS (2 Nos. of outgoing bays to OIL) to scale along with SLD clearly specifying the schemes on AutoCAD as per technical specification | 1 | Job | 50,000 ₹50,000 Lowest | 1,00,000 ₹1,00,000 |
Tender Value
₹45.0 L
EMD Value
₹91,000
Closing Date
25 Jun 2026, 12:00 pmClosed
CGM OnM UAR
1st Floor, Bijulee Bhawan, Guwahati-01
Route Survey for Construction of 220kV Transmission Line for Power Import to OIL, Madhuban from 220kV Namrup GSS and preparation of Master Plan for Construction of 1(One) No. of 220/132/33KV Grid Substation (AIS and GIS) at OIL, Madhuban
2026_AEGCL_52404_1
AEGCL /MD/ CGM(UAR)/ OIL MADHUBAN/ 220KV /2026/ BID (R)
Open Tender
Survey
Works
90 days
220KV Namrup GSS
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹91,000
28 Jul 2026
19 May 2026
26 Jun 2026
19 May 2026
25 Jun 2026
27 May 2026
19 May 2026 - 26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preliminary survey for Identification of 3 alternative routes using satelite imageries (1:25,000 PAN +LISS merged) for NRSA.Google images and Survey of India maps and finalization of most economical, Optimum route showing the topographical and other features upto 8Kms on either side and indicating final selected route alignment and digital modelling final selected route alignment and digital modelling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications. | 40 | KM | - | - |
| 2 | Detailed survey along the approved route alignment approval after conducting the preliminary survey by using Modern survey equipment like GPS/DGPS, Total stations including profiling tower spotting and optimization of locations by using computer aided technique like ALTM as well as other activities as detailed in the scope of work using PLS-CADD software and submission of draft report for approval.
a. Drawing the route profile including Geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc.
b. KMZ/KML file of approval route.
c. Levelling of the profile with reference to Survey of India bench marks(MSL) d. Tower Schedule.
e. Line Schedule.
f. Burgle details by using Modern Survey techniques and providing GPS, Co-ordinates at each anchor points for identification of anchor locations indluding permanents marks like poles, telephones lines, buildings etc. | 40 | KM | - | - |
| 3 | Providing and fixing RCC pillar (M-20) of size 150 X 150 X 1000 mm, with approved marks including painting above the ground level and yellow lettering and marking the direction of incoming and outgoing lines are to be marked clearly on the top with red colour.IF the distance between such anchors points is more than 1KM one more directional stone is to be fixed. So also, for the road crossings, railway crossing and nala crossings on both the sides. | 41 | Nos (Each Stone) | - | - |
| 4 | Digitized contouring at undulated/hilly tower locations as detailed in technical specifications for assessing the quantum of benching and revetment required and submission of draft report of the work | 1 | Location | - | - |
| 5Preparation of Schedule and Documents | |||||
| 5.01 | PTCC Proposal containing PTCC questionnaires, topo sheet extracts with marking of the proposed line, SR report, tower sketch, station single line diagram etc. (10 copies/set) | 1 | Per Set | - | - |
| 5.02 | Tree schedule containing the details like name of tree, girth size, distance from central line of the alignment, approx height of tree etc., complete and submission of draft report for approval .The details shall be surveyed no.wise along the corridor. (As Per Technical Specification) | 40 | KM | - | - |
| 5.03 | Railway Crossing proposal with drawing inclusive of graph sheets and other stationery materials, labour etc. (6 sets/crossing) | 2 | Per Crossing | - | - |
| 6 | Submission of Detailed consolidated report on the surveying work done appending all approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos taken at site and submitting soft copies of all documents and report in 6 sets. The detailed report shall contain following approved draft reports.
Preliminary Report
Detailed Survey Report
Soil classification report with location wise
Tree Schedule
Line Schedule
Burgie details
Digitized contours
Digitized village map geo reference and superimposed on the line corridor | 1 | Job | - | - |
| 7 | Preparing of proper layout drawing of the switchyard of Namrup GSS (2 Nos. of outgoing bays to OIL) to scale along with SLD clearly specifying the schemes on AutoCAD as per technical specification | 1 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Bid_Document_RS.pdf
Tender Documents • 3.09 MB
ifb.pdf
Tender Documents • 0.42 MB
BOQ_82863.xls
BOQ • 0.28 MB
Corrigendum-II.pdf
PDF • 0.15 MB
Corrigendum-I.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].