| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-Finance | ₹15.9 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹16.3 L+₹40,537.18 (2.55%)Rejected-Finance NOT AVAILABLE | ₹16.3 L+₹40,537.18 (2.55%) | L2 | Rejected-Finance L2 |
| 3 | L3₹16.5 L+₹65,961.88 (4.15%)Rejected-Finance | ₹16.5 L+₹65,961.88 (4.15%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | RAMESH KUMAR L2 | PARKASH SHARMA GOVT. CONTRACTOR L3 | RAJEEV THANAL CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth up to a lead of 20mtrs (twenty metres) and lift up to 1.50 mrs (one point fifty metres) disposing earth to be leveled and neatly dressed with in all leads and lifts as per the directions of the Engineer in charge. | 41.19 | Cum. | 695 ₹28,627.05 | 700 ₹28,833 | 680 ₹28,009.2 Lowest |
| 2.00 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the directions of the Engineer in charge. | 13.48 | Cum. | 10,000 ₹1,34,800 | 11,000 ₹1,48,280 | 9,999 ₹1,34,786.52 Lowest |
| 3.00 | R/R masonery/Polygonal Mrubble Masonery (Uncoursed /Brought to courses) with hard stone of approved quality in foundation and plinth i/c levelling up with in C.C 1:6:12(1cement:6sand: 12 aggregate) 20mm nominal size) at plinth level in cm 1:6 (1cement:6sand) | 111.69 | Cum. | 8,208 ₹9,16,751.52 | 8,209 ₹9,16,863.21 | 8,203 ₹9,16,193.07 Lowest |
| 4.00 | Providing andf laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification. | 43.88 | Cum. | 9,948 ₹4,36,518.24 | 10,000 ₹4,38,800 | 9,318 ₹4,08,873.84 Lowest |
| 5.00Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. | ||||||
| 5.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like with in all leads aand lifts as per the direction of the Engineer in Charge. | 50.85 | Cum. | 600 ₹30,510 | 678 ₹34,476.3 | 500 ₹25,425 Lowest |
| 6.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm (Forty millimeter nominal size) and curing complete excluding cost of from work in foundation and plinth with in all leads & lifts as per entire satisfication of Engineer-in-Charge.(for Pathway) | 6 | Cum. | 11,000 ₹66,000 | 11,800 ₹70,800 | 10,000 ₹60,000 Lowest |
| 7.00 | Boulder filling behind R/wall & B/wall within all leads and lifts and as directed by the Engineer-in-charge. | 5.4 | Cum. | 2,573 ₹13,894.2 | 2,673 ₹14,434.2 | 2,473 ₹13,354.2 Lowest |
| 8.00 | Providing and fixing of Finolex pipe 50mm dia. In R/Wall including all re-fitting i/e elbowa, sockets etc. with in all leads aand lifts as per the direction of the Engineer in Charge. | 7.8 | Cum. | 200 ₹1,560 | 205 ₹1,599 | 190 ₹1,482 Lowest |
Tender Value
₹15.6 L
EMD Value
₹31,300
Closing Date
6 Aug 2026, 11:00 amClosed
Executive Engineer
JSV Division Jubbal
AR and MO of LWSS Reoth Phanel in GP Ramnagar Tehsil Kotkhai Distt Shimla HP SH C/o R/R Wall and Plum wall for protection of stage 1st stage 2nd pump house and JE office R/Kiar and C/O Retaining wall To protection work at stage 1st 2nd and 3rd Pump H
2026_HPIPH_140169_1
JBL-SML-09-718
Open Tender
Civil Works
Item Rate
90 days
Gumma
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
₹31,300
3 Sept 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earth work and disposal of all excavated earth up to a lead of 20mtrs (twenty metres) and lift up to 1.50 mrs (one point fifty metres) disposing earth to be leveled and neatly dressed with in all leads and lifts as per the directions of the Engineer in charge. | - | Cum. | 679.39 | - |
| 2 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the directions of the Engineer in charge. | - | Cum. | 9,348.45 | - |
| 3 | R/R masonery/Polygonal Mrubble Masonery (Uncoursed /Brought to courses) with hard stone of approved quality in foundation and plinth i/c levelling up with in C.C 1:6:12(1cement:6sand: 12 aggregate) 20mm nominal size) at plinth level in cm 1:6 (1cement:6sand) | - | Cum. | 8,103.64 | - |
| 4 | Providing andf laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification. | 43.88 | Cum. | 9,218.32 | ₹4,04,499.88 |
| 5Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. | |||||
| 5.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like with in all leads aand lifts as per the direction of the Engineer in Charge. | 50.85 | Cum. | 454.26 | ₹23,099.12 |
| 6 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm (Forty millimeter nominal size) and curing complete excluding cost of from work in foundation and plinth with in all leads & lifts as per entire satisfication of Engineer-in-Charge.(for Pathway) | 6 | Cum. | 9,936.31 | ₹59,617.86 |
| 7 | Boulder filling behind R/wall & B/wall within all leads and lifts and as directed by the Engineer-in-charge. | - | Cum. | 2,373.98 | - |
| 8 | Providing and fixing of Finolex pipe 50mm dia. In R/Wall including all re-fitting i/e elbowa, sockets etc. with in all leads aand lifts as per the direction of the Engineer in Charge. | 7.8 | Cum. | 184.45 | ₹1,438.71 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
f8.pdf
Tender Documents • 0.70 MB
tc.pdf
Tender Documents • 0.41 MB
BOQ_207854.xls
BOQ • 0.35 MB
f6.pdf
Tender Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .