| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC NH 17 MAIN ROAD BINAGA BAZAR KARWAR 581307 | UTTARA KANNADA | KARNATAKA | 581307 | ₹31.5 L Quoted ₹31.9 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹32.7 LRejected-Finance MAHALSA ROAD BINAGA KARWAR 581307 | KARWAR | UTTARA KANNADA | KARNATAKA | 581307 | ₹32.7 L | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹35.3 LRejected-Finance LEKSHMI NIVAS TELANG ROAD NANDANGADDA KARWAR 581 304 | KARWAR | UTTARA KANNADA | KARNATAKA | 581304 | ₹35.3 L | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹36.9 LRejected-Finance | ₹36.9 L | L4 | Rejected-Finance Not Being L1 |
| 5 | L5₹38.5 LRejected-Finance | ₹38.5 L | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | Ms V. S. NAYAK L4 | M/S KAMALKANTH NAIK L2 | K.G.SHANKER L6 | SIRI SALES AND SERVICES L8 | KOTIAN -ECC L7 | LEKSHMI ENGINEERS L3 | ANKIT SHIP REPAIRERS AND SUPPLIERS L1 | M/s. Prakash Engineers Contractors and Suppliers L9 | AARADHYA VENTURES L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete of any description as in sunken floor or in any position as specified and directed. | 12 | Cum | 1,750 ₹21,000 | 150 ₹1,800 | 1,000 ₹12,000 | 1,200 ₹14,400 | 1,900 ₹22,800 | 950 ₹11,400 | 1,180 ₹14,160 | 1,500 ₹18,000 | 800 ₹9,600 |
| 2.00 | Treatment of sunken floor slab comprises of the following specifications and all as specified:-
(i) M&L for cleaning the sunken/ lowered portion of RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chisel out any mortar sticking to the surface and brooming completely. 40mm thick average PCC 1:2:4 type B-0 using 12.5mm graded stone aggregate as in padding concrete to achieve proper slope
(ii) Rendering of uneven surfaces with 5mm thick CM 1:3 mixed with integral water proofing compound at the rate as per manufacturer's instructions. Fill it with water and check dampness and seepage. Where dampness/seepage is noticed, nozzles shall be fixed and grouting to be carried out (WPC shall be measured and paid separately)
(iii) All junctions points of side wall where CI/GI pipes are passing through shall be sealed with epoxy putty.
(iv) After drying putty, wash the slab and sides of sunken portion with water and make it clear and clean. | 55 | Sqm | 1,500 ₹82,500 | 600 ₹33,000 | 2,000 ₹1.1 L | 1,600 ₹88,000 | 1,300 ₹71,500 | 1,390 ₹76,450 | 835 ₹45,925 | 1,200 ₹66,000 | 900 ₹49,500 |
| 2.01(v) M&L for applying two coats of polymer modified cementious water proof coating as per manufacturer's instruction to bottom and vertical sides up to finished floor level +100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky,, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion all as specified and directed. (This item shall be measured and paid separately). (vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20mm thick CM 1:4 mixed with integral water proofing compound as per manufacturer's specification including rounding of corners and junctions sloping towards spout. (WPC shall be measured & paid separately ) (vii) All pipes laid in sunken portion shall be covered with 50mm thick PCC 1:3:6, type C-1 all round after painting with anticorrosive paint (Black paint shall be paid separately) Note:- Test the water proofed area (ponding test) by filling water for at least 72 hours and tested for leakage seepage and to the entire satisfaction of GE. Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. The treatment shall be carried out by authorised applicators of chemicals. Cost of testing shall be deemed to be included in the rate quoted above. | ||||||||||||
| 3.00 | M&L for applying two coats of polymer modified cementious water proof coating as per manufacturer's instruction to bottom and vertical sides up to finished floor level +100mm height. The thickness of two layers shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion all as specified and directed. | 60 | Sqm | 285 ₹17,100 | 180 ₹10,800 | 350 ₹21,000 | 444 ₹26,640 | 295 ₹17,700 | 295 ₹17,700 | 228 ₹13,680 | 325 ₹19,500 | 300 ₹18,000 |
| 4.00 | Supply only Integral Water proofing compound complete all as specified and directed. | 170 | Kg | 50 ₹8,500 | 10 ₹1,700 | 80 ₹13,600 | 44 ₹7,480 | 55 ₹9,350 | 62 ₹10,540 | 30 ₹5,100 | 56 ₹9,520 | 21 ₹3,570 |
| 5.00 | M&L for PCC 1:5:10 type E-2 using 40mm graded stone aggregate as in sunken floor of toilet complete all as specified and as directed. | 16 | Cum | 4,950 ₹79,200 | 7,000 ₹1.1 L | 4,000 ₹64,000 | 3,900 ₹62,400 | 5,850 ₹93,600 | 4,800 ₹76,800 | 4,800 ₹76,800 | 5,500 ₹88,000 | 7,000 ₹1.1 L |
| 6.00 | Taking up or down GI tubing and connections 15mm bore including fittings/ connections etc., all as specified and directed. | 100 | RM | 35 ₹3,500 | 10 ₹1,000 | 25 ₹2,500 | 10 ₹1,000 | 35 ₹3,500 | 26 ₹2,600 | 10 ₹1,000 | 37 ₹3,700 | 21 ₹2,100 |
| 7.00 | Taking up or down GI tubing and connections 20mm bore including fittings/ connections etc., all as specified and directed. | 70 | RM | 75 ₹5,250 | 10 ₹700 | 25 ₹1,750 | 10 ₹700 | 40 ₹2,800 | 26 ₹1,820 | 10 ₹700 | 40 ₹2,800 | 21 ₹1,470 |
| 8.00 | S&F 15mm dia UPVC pipes of pressure rating 10 Kgf/cm2 fixed to walls, ceiling or on floors etc complete all as specified and directed. | 100 | RM | 105 ₹10,500 | 100 ₹10,000 | 150 ₹15,000 | 121 ₹12,100 | 120 ₹12,000 | 127 ₹12,700 | 70 ₹7,000 | 95 ₹9,500 | 150 ₹15,000 |
| 9.00 | S&F 20 mm dia UPVC pipes of pressure rating 10 Kgf/cm2 fixed to walls, ceiling or on floors etc complete all as specified and directed. | 70 | RM | 115 ₹8,050 | 100 ₹7,000 | 180 ₹12,600 | 140 ₹9,800 | 140 ₹9,800 | 135 ₹9,450 | 80 ₹5,600 | 144 ₹10,080 | 180 ₹12,600 |
Tender Value
₹44.9 L
EMD Value
₹89,800
Closing Date
20 Sept 2025, 6:00 pmClosed
GE (SB) KARWAR
GARRISON ENGINEER (SEABIRD) KARWAR Naval Base, Sankrubagh (PO) Karwar - 581308
CERTAIN B/R REPAIRS TO TOILETS, FLOORS, ROOF, CEILING, SUNKEN FLOORS, LEAKAGE/ SEEPAGE AND PLUMBING WORKS OF NOFRA NAVAL BASE KARWAR UNDER GE (SB) KARWAR.
2025_MES_725526_1
8364/E8
Open Tender
Civil Works
330 days
GE (SB) KARWAR
As per NIT
8 documents required · 8 mandatory
₹500
GE (SB) KARWAR
₹89,800
Yes
10 Dec 2025
23 Aug 2025
22 Sept 2025
23 Aug 2025
20 Sept 2025
6 Sept 2025
23 Aug 2025 - 30 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid