Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹1.1 L (1.10%)Rejected-Finance 487 A 1 GOPAL MISHRA ROAD BEHALA KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹1.0 Cr+₹1.1 L (1.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.0 Cr+₹2.0 L (1.99%)Rejected-Finance 1 1E KHODAGONGE ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹1.0 Cr+₹2.0 L (1.99%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
21 Jul 2026, 2:00 pmClosed
SE/EC-I/EM/KMDA
Office of the Superintending Engineer, Electrical Circle-I, EM Sector, KMDA, D-Block, 2nd Floor, Unnayan Bhavan, Salt Lake-91.
Operation, cleaning including daily/periodic maintenance etc. of the sewage/underground water pumping station....street light operation and maintenance etc. at Howrah sub way complex under EM sector, KMDA for a period of 18(Eighteen) months.
2026_KMDA_1030050_1
KMDA/EM/SE/EC-I/NIT-01/2026-27 dated 19.06.2026
Open Tender
ELECTRICAL WORKS M/R
Percentage
540 days
Howrah Subway
Please refer tender documents.
8 documents required · 8 mandatory
₹0
₹2.0 L
Electrical Circle-I, EM Sector, KMDA
27 Aug 2026
29 Jun 2026
23 Jul 2026
29 Jun 2026
21 Jul 2026
29 Jun 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Round the clock operation & minor maintenance of different electro-mechanical equipment's, pump, Blower-motor and 6.0 KV substation with adequate no's of working personnel for each month as per direction of the EIC. | |||||
| 1.1 | For the period of First year. | 12 | Month | 2,68,858 | ₹32,26,296 |
| 1.2 | For the period of 06 month in Second year. | 6 | Month | 2,80,684 | ₹16,84,104 |
| 2Round the clock operation and minor maintenance for the additional 4 holidays of different electro mechanical equipment's, pump, Blower-motor and 6.0 KV substation with these existing personnel as per direction of the EIC. | |||||
| 2.1 | For the period of First year. | 12 | Month | 60,366 | ₹7,24,392 |
| 2.2 | For the period of 06 month in Second year. | 6 | Month | 63,026 | ₹3,78,156 |
| 3Checking of all the mechanical parts and preventive maintenance of all pump machinery as per scope of work and direction of EIC. (ones in a week). | |||||
| 3.1 | For the period of First year. | 52 | Days | 966 | ₹50,232 |
| 3.2 | For the period of 06 month in Second year. | 26 | Days | 1,008 | ₹26,208 |
| 4Checking of all the Electrical parts and preventive maintenance of all Electrical machinery & distribution system as per scope of work and direction of EIC (ones in a week). | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_2529330.xls
BOQ • 0.40 MB
All.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .