| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.2 LAdmitted-Finance | ₹98.2 L | L1 | Admitted-Finance |
| 2 | L2₹99.0 LAdmitted-Finance | ₹99.0 L | L2 | Admitted-Finance |
| 3 | L3₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.1 CrAdmitted-Finance 00 DUDHEBHAVI KAVTHEMAHANKAL SANGLI SANGLI MAHARASHTRA 416403 | SANGLI | MAHARASHTRA | 416403 | ₹1.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Polymer Applicators L1 | Gubbi Civil Engineers L3 | S.V ASSOCIATES L2 | Shivkrupa Enterprises L4 | K D Aher Building Systems Pvt Ltd L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface preparation by removing the damaged and worn out Tarfelt /APP /Indofil waterproofing treatment from the Terrace, filling the cracks if any primer, disposing the unserviceable materials in the dumping ground in the ground floor complete as per specifications and as directed by the Engineer-in-charge complete. | 2,500 | SqM | 150 ₹3.8 L | 250 ₹6.3 L | 171 ₹4.3 L | 150 ₹3.8 L | 150 ₹3.8 L |
| 2.00Grouting of Lean Cement grout mixed with Non Shrink Compound/ polymer in pre fixed nipples with High Pressure Hand Pump , removing the nipples after grouting the area and finishing the area with approved material complete all as directed by the Project Engineer at site. | ||||||||
| 2.10 | Drilling Holes of 12/13 mm diameter and fixing Aluminium/ PVC nipples using approved ready Mix High Strength Motar. | 200 | Each | 100 ₹20,000 | 150 ₹30,000 | 90 ₹18,000 | 200 ₹40,000 | 200 ₹40,000 |
| 2.20 | Grouting (only quantity of Cement used for grouting will be measured and paid). Contractor shall maintain Log book for consumption of Cement duly approved by Engineer-in Charge. | 300 | Kg | 120 ₹36,000 | 65 ₹19,500 | 90 ₹27,000 | 100 ₹30,000 | 50 ₹15,000 |
| 3.00 | Removing the top layer of cement mortar over brick bat coba and applying on same surface with polymer modified cement mortar with 3% polymer of weight of cement keeping water cement ratio less than 0.5 in 20 mm thick complete as per manufacturers specification & as direcetd by Project Engineer. | 500 | SqM | 1,200 ₹6 L | 1,100 ₹5.5 L | 540 ₹2.7 L | 650 ₹3.3 L | 650 ₹3.3 L |
| 4.00 | Removing the damaged PVC flooring carefully including removing resins sticking on the floor, cleaning the floor carefully stacking the serviceable materials at places shown and disposing the unserviceable materials within 50 m lead at places shown complete as directed by th Engineer-in-charge. | 500 | SqM | 200 ₹1 L | 300 ₹1.5 L | 45 ₹22,500 | 1,600 ₹8 L | 300 ₹1.5 L |
| 5.00 | Filling the gap between aluminium frame & adjacent RCC / Brick work / Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete Up to 5 mm depth and 5 mm width. | 200 | M | 160 ₹32,000 | 150 ₹30,000 | 90 ₹18,000 | 50 ₹10,000 | 500 ₹1 L |
| 6.00 | Dismantling old plaster / skirting, raking out joints & cleaning, the surfaces for plaster including scaffolding, disposal of debris to the dumping ground within 100 metres lead. | 200 | SqM | 80 ₹16,000 | 200 ₹40,000 | 63 ₹12,600 | 50 ₹10,000 | 100 ₹20,000 |
| 7.00Removing / dismantling the following pipe lines by mechanically / Manually with all connections, including chiselling and removing the embedded portions, all inter connections and proper plugging of the inlets and outlets to prevent water flow etc. from all the floor level, stacking of dismantled materials at the location as directed by Project Engineer. | ||||||||
| 7.10 | Above 50 mm dia upto 150 mm dia GI/PVC/PPR/CI pipelines at all heights. | 50 | RM | 100 ₹5,000 | 175 ₹8,750 | 126 ₹6,300 | 100 ₹5,000 | 500 ₹25,000 |
Tender Value
₹1.0 Cr
EMD Value
₹2.4 L
Closing Date
23 Mar 2026, 3:00 pmClosed
Chief Engineer, CED
Civil Engineering Division, BARC
Repairs, waterproofing of terraces and allied civil works at Purnima Complex and other Sea side buildings, North site, BARC, Trombay, Mumbai.
2026_BARC_897728_1
BARC/CED/ET/84/2025-2026 DATE 06/02/2026
Open Tender
Civil Works
452 days
Purnima Complex and other Sea side buildings
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹2.4 L
CED, BARC, Trombay, Mumbai
13 May 2026
11 Feb 2026
25 Mar 2026
12 Feb 2026
23 Mar 2026
9 Mar 2026
12 Feb 2026 - 25 Feb 2026
26 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.46 MB
ScheduleAET84.pdf
Tender Documents • 0.21 MB
ProformaOfSechduleET84.pdf
Tender Documents • 0.28 MB
TechnicalbidET84.xls
Tender Documents • 0.08 MB
BOQ_943607.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid