| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.2 LAccepted-AOC | ₹98.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹99.0 L+₹77,800 (0.79%)Rejected-Finance | ₹99.0 L+₹77,800 (0.79%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹1.0 Cr+₹2.7 L (2.77%)Rejected-Finance 18 26 THANAWALA GARGE DEVPRAYAG CHS BHAKTI MANDIR ROAD VILLAGE TOWN THANE CITY THANE THANE MAHARASHTRA 400602 INDIA | THANE | MAHARASHTRA | 400602 | ₹1.0 Cr+₹2.7 L (2.77%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹1.1 Cr+₹9.8 L (10.0%)Rejected-Finance 00 DUDHEBHAVI KAVTHEMAHANKAL SANGLI SANGLI MAHARASHTRA 416403 | SANGLI | MAHARASHTRA | 416403 | ₹1.1 Cr+₹9.8 L (10.0%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹1.1 Cr+₹15.9 L (16.2%)Rejected-Finance | ₹1.1 Cr+₹15.9 L (16.2%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Polymer Applicators L1 | Gubbi Civil Engineers L3 | S.V ASSOCIATES L2 | Shivkrupa Enterprises L4 | K D Aher Building Systems Pvt Ltd L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface preparation by removing the damaged and worn out Tarfelt /APP /Indofil waterproofing treatment from the Terrace, filling the cracks if any primer, disposing the unserviceable materials in the dumping ground in the ground floor complete as per specifications and as directed by the Engineer-in-charge complete. | 2,500 | SqM | 150 ₹3,75,000 Lowest | 250 ₹6,25,000 | 171 ₹4,27,500 | 150 ₹3,75,000 Lowest | 150 ₹3,75,000 Lowest |
| 2.00Grouting of Lean Cement grout mixed with Non Shrink Compound/ polymer in pre fixed nipples with High Pressure Hand Pump , removing the nipples after grouting the area and finishing the area with approved material complete all as directed by the Project Engineer at site. | ||||||||
| 2.10 | Drilling Holes of 12/13 mm diameter and fixing Aluminium/ PVC nipples using approved ready Mix High Strength Motar. | 200 | Each | 100 ₹20,000 | 150 ₹30,000 | 90 ₹18,000 Lowest | 200 ₹40,000 | 200 ₹40,000 |
| 2.20 | Grouting (only quantity of Cement used for grouting will be measured and paid). Contractor shall maintain Log book for consumption of Cement duly approved by Engineer-in Charge. | 300 | Kg | 120 ₹36,000 | 65 ₹19,500 | 90 ₹27,000 | 100 ₹30,000 | 50 ₹15,000 Lowest |
| 3.00 | Removing the top layer of cement mortar over brick bat coba and applying on same surface with polymer modified cement mortar with 3% polymer of weight of cement keeping water cement ratio less than 0.5 in 20 mm thick complete as per manufacturers specification & as direcetd by Project Engineer. | 500 | SqM | 1,200 ₹6,00,000 | 1,100 ₹5,50,000 | 540 ₹2,70,000 Lowest | 650 ₹3,25,000 | 650 ₹3,25,000 |
| 4.00 | Removing the damaged PVC flooring carefully including removing resins sticking on the floor, cleaning the floor carefully stacking the serviceable materials at places shown and disposing the unserviceable materials within 50 m lead at places shown complete as directed by th Engineer-in-charge. | 500 | SqM | 200 ₹1,00,000 | 300 ₹1,50,000 | 45 ₹22,500 Lowest | 1,600 ₹8,00,000 | 300 ₹1,50,000 |
| 5.00 | Filling the gap between aluminium frame & adjacent RCC / Brick work / Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete Up to 5 mm depth and 5 mm width. | 200 | M | 160 ₹32,000 | 150 ₹30,000 | 90 ₹18,000 | 50 ₹10,000 Lowest | 500 ₹1,00,000 |
| 6.00 | Dismantling old plaster / skirting, raking out joints & cleaning, the surfaces for plaster including scaffolding, disposal of debris to the dumping ground within 100 metres lead. | 200 | SqM | 80 ₹16,000 | 200 ₹40,000 | 63 ₹12,600 | 50 ₹10,000 Lowest | 100 ₹20,000 |
| 7.00Removing / dismantling the following pipe lines by mechanically / Manually with all connections, including chiselling and removing the embedded portions, all inter connections and proper plugging of the inlets and outlets to prevent water flow etc. from all the floor level, stacking of dismantled materials at the location as directed by Project Engineer. | ||||||||
| 7.10 | Above 50 mm dia upto 150 mm dia GI/PVC/PPR/CI pipelines at all heights. | 50 | RM | 100 ₹5,000 Lowest | 175 ₹8,750 | 126 ₹6,300 | 100 ₹5,000 Lowest | 500 ₹25,000 |
Tender Value
₹1.0 Cr
EMD Value
₹2.4 L
Closing Date
23 Mar 2026, 3:00 pmClosed
Chief Engineer, CED
Civil Engineering Division, BARC
Repairs, waterproofing of terraces and allied civil works at Purnima Complex and other Sea side buildings, North site, BARC, Trombay, Mumbai.
2026_BARC_897728_1
BARC/CED/ET/84/2025-2026 DATE 06/02/2026
Open Tender
Civil Works
Item Rate
452 days
Purnima Complex and other Sea side buildings
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹2.4 L
CED, BARC, Trombay, Mumbai
22 Jul 2026
11 Feb 2026
25 Mar 2026
12 Feb 2026
23 Mar 2026
9 Mar 2026
12 Feb 2026 - 25 Feb 2026
26 Feb 2026
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.46 MB
ScheduleAET84.pdf
Tender Documents • 0.21 MB
ProformaOfSechduleET84.pdf
Tender Documents • 0.28 MB
TechnicalbidET84.xls
Tender Documents • 0.08 MB
BOQ_943607.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .