| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance AT JAWAHAR NAGAR PO BERMO DIST BOKARO PIN 829104 JHARKHAND | BERMO | BOKARO | JHARKHAND | 829104 | ₹2.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.2 L+₹3,818.52 (1.73%)Admitted-Fee/PreQual/Technical/Finance AT KARGALI BAZAR PO BERMO PSBERMO DIST BOKARO JHARKHAND 829104 | BOKARO | JHARKHAND | 829104 | ₹2.2 L+₹3,818.52 (1.73%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.3 L+₹10,092.97 (4.58%)Admitted-Fee/PreQual/Technical/Finance GANDHI NAGAR F 4 BERMO PURVI SUNDAY BAZAR BOKARO 829127 | BOKARO | JHARKHAND | 829127 | ₹2.3 L+₹10,092.97 (4.58%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S MANOJ ENTERPRISES L3 | M/S ROSHNI ENTERPRISES L2 | M/S JAI MAA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.01 | Excavation for foundation in soft soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 metres, (20' x 10' x 1.5') = (300 cubic feet x 0.0283 cum)= 8.49 cum | 8.49 | cum | 322.62 ₹2,739.04 | 314 ₹2,665.86 | 312 ₹2,648.88 Lowest |
| 1.02 | Providing and laying in position cement concrete 1:3:6 (1 cement : 2 coarse sand : 6 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required | 16.6 | cum | 8,148.72 ₹1,35,268.75 | 7,934 ₹1,31,704.4 | 7,792 ₹1,29,347.2 Lowest |
| 1.03 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Jointing 18 x 2 nos. of 0.5 metre length of 100 mm x 50 mm x 6 mm Channel Iron) equivalent to 18 x 2 x (9.56 kg/m x 0.5 m) = 172.08 kg plus 50 metre length of 50 mm x 50 mm x 6 mm Angle Iron (50 m x 4.5 kg/ m = 225 kg); Total = 397.08 kg | 397.08 | kg. | 130.98 ₹52,009.54 | 127 ₹50,429.16 | 125 ₹49,635 Lowest |
| 1.04 | Cutting of 6" dia M.S./ G.I. Pipes for smooth surface making as required (Cutting of one no. of 10 metre length of 90 lbs Rail Pole into 6 pieces of 5 feet each = 77.4025 x 5 = 387.01"), Thus, for making 42 no. of pieces = 387.01 x 7 = 2709.07" | 2,709.07 | inch | 14.94 ₹40,473.51 | 14.55 ₹39,416.97 | 14.31 ₹38,766.79 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
13 Aug 2026, 9:00 amClosed
PE EnM Karo OCP
Office of PE EnM Karo OCP
Making of protective boundary along a portion of the pipeline of the Pump, in operation at siding, supplying water to the reservoir, by cutting, welding of departmental Rail Pole and work of Channel, Angle Iron, at Kargali siding PF-II under Karo OCP
2026_CCL_362965_1
P.E. / Karo OCP/ e-tender/ 2026-27/ 15
Open Tender
Electrical and Maintenance Works
Item Rate
5 days
Karo OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
19 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
3 Aug 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation for foundation in soft soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 metres, (20' x 10' x 1.5') = (300 cubic feet x 0.0283 cum)= 8.49 cum | 8.49 | cum | - | - |
| 1.02 | Providing and laying in position cement concrete 1:3:6 (1 cement : 2 coarse sand : 6 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required | 16.6 | cum | - | - |
| 1.03 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Jointing 18 x 2 nos. of 0.5 metre length of 100 mm x 50 mm x 6 mm Channel Iron) equivalent to 18 x 2 x (9.56 kg/m x 0.5 m) = 172.08 kg plus 50 metre length of 50 mm x 50 mm x 6 mm Angle Iron (50 m x 4.5 kg/ m = 225 kg); Total = 397.08 kg | 397.08 | kg. | - | - |
| 1.04 | Cutting of 6" dia M.S./ G.I. Pipes for smooth surface making as required (Cutting of one no. of 10 metre length of 90 lbs Rail Pole into 6 pieces of 5 feet each = 77.4025 x 5 = 387.01"), Thus, for making 42 no. of pieces = 387.01 x 7 = 2709.07" | 2,709.07 | inch | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_375879.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .