Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | Admitted-Finance |
| 2 | Admitted-Finance BARI BRAHMANA JAMMU | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
6 Sept 2021, 4:00 pmClosed
Executive Engineer Tube well Irri Div Jammu
Executive Engineer Tube well Irri Div Jammu
Revival of Tube well Nai Basti including up gradation of Electro Mechanical equipments of Irrigation Tube Well in Samba District
2021_IFC_134730_1
eNIT No. 15 of 2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
samba
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer Tube well Irri Div Jammu
Exempted
15 Sept 2021
16 Aug 2021
7 Sept 2021
16 Aug 2021
6 Sept 2021
16 Aug 2021
Amount
The job includes shifting of column pipes to workshop, Cutting of rusted worn out flanges from column pipes and providing / fitting of new flanges in place of old .The flanges should have a cut/slot for sub. Cable. Shifting of flanged column pipes to Tubewell. P/F of 150mm dia delivery pipe along with 150 MM dia sluice and non return valve. Providing, Installation, testing & commissioning of submersible pump set(KSB or equivalent make) at Tube-well Swankha having capacity 8,000 GPH 40-60m head coupled with 3 phase submersible motor of suitable capacity along with existing 150mm dia fabricated flanged column pipes, and other allied materials/ equipments required during lowering of submersible pump set along with 10 sq. mm sub cable. and testing on full load at site. The job also includes cost of transport, material &labour charges. Complete job
Reconditioning of 63 KVA Electric transformer installed at tube-well Nai basti by way of rewinding of all HV/LV Coils with superior quality wire, insulating material. P/F of all HV/LV bush rods along with bush nut and washers P/F of all sundry items required as per job requirement. Cleaning of tank of transformer to remove all dust All dust & settled particles. Repair the tank wherever required and checking for leakage if any. Filling of T-oil in the transformer upto the required level. Assembling all the parts by P/F of new nuts, bolts and washers can connecting it with power supply for testing it on full load at site. Complete job.
The job also includes providing and fitting of 01 no. LT fuse set at RCC pole of electric transformer as per specification with P/F of 3.5mm sq 3.5 core 30mtr AL cable from transformer to main switch to voltage stabilizer to control panel with proper thimbling. The job also includes cost of transport, material &labour charges. (complete job)
JAGDEMBAY MECH ENGG WORKS
G S ENGINEERING WORKS
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .