Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
27 Mar 2021, 11:45 amClosed
OFFICE OF THE EXECUTIVE ENGINEER (SDW) VIII
OFFICE OF THE EXECUTIVE ENGINEER (SDW) VIII
Repairing of 700 mm dia and 800 mm dia Sluice Valves of Shiva Durga make at Sector-24 SPS Dwarka..
2021_DJB_201934_6
NIT No.13 / EE(SDW)-VIII/ 2020-21
Open Tender
Miscellaneous Works
Works
60 days
OFFICE OF THE EXECUTIVE ENGINEER (SDW) VIII
as per nit conditions
2 documents required · 2 mandatory
₹500
services.sabpaisa.in
Exempted
30 Mar 2021
19 Mar 2021
27 Mar 2021
19 Mar 2021
27 Mar 2021
19 Mar 2021
FOR SLUICE VALVE OF 800 MM DIA PUMP SET NO.. 3 SUCTION SIDE.:- Cutting of nut bolts with gas cutter of upper dome and removing one by one of bolts and fixed of new bolt for tightenin of etc.
Removing of complete sluice valve flape and upper dome with the help of HOT crane to taking out side of pump house.
Making/Fixing dead plate on sluice valve body with rubber packing and nut bolt avoid any mishappening for flooding of pump house in raining condition.
To & fro charges for Sluice valve of 800 mm dia. Including loading and unloading charges.
Dismantling of gear box from the top of the sluice valve body flap, gland housing and gland bolts washing of each par by chemical solution and diesel etc to removing the rust.
Repairing of C.I sluice flap by making proper sealing arrangement of spindle nut seat for lifting of flap up & down by rotation of spindle with gear box by bolting with C.I plate as per job condition on both side of seat.
Repairing of SS guide SUO by proper remetling of SS material, drilling and bolting by SS LN bolt making grinding etc as per required by job.
Repairing of SS Seat of flap by remetling, polishing etc. and making grinding as required by job.
Repairing of Bronze Nut by fixing of Bronze Bush in worn out damage thread and rethreading the same. (As per sample)
Replacement of thrust Bearing No. 51217
Repairing of main bewel gear by remetling, making proper teeth on milling machine and also making slotted. Bore keys as per main guide of bewel shaft with locking arrengement as per job conditions.
Repairing of bewel pinion by remetling and making proper teeth on milling machine for teeth.
Replacement of hardware item of gear box.
Assembling of hardware item of gear box.
Assembling flap upper dome SS spindle, G.M nut, Bearings, gland housing and at workshop loading to truck and return back to plant.
Opening of dead flange from the main body by removing of nut bolt. Assembling body with packing nut bolt and operation sluice valve in body by gear box drive as required for closing and opening on load.
FOR SLUICE VALVE OF 700 MM DIA PUMP SET NO.. 3 DELIVERY SIDE :- Cutting of nut bolts of upper dome and removing one by one of bolts and fixed of new bolt for tightenin of etc.
Removing of complete sluice valve flap and upper dome with the help of HOT crane to takin out side of um house.
Making/Fixing dead plate on sluice valve body with rubber packing and nut bolt avoid any mishappening for flooding of pump house in raining condition.
To & fro charges for Sluice valve of 700 mm dia. Including loading and unloading charges.
Dismantling of gear box from the top Of the sluice valve body flape, gland housing and gland bolts washing of each part by chemical solution and diesel etc to removing the rust.
Repairing of C.I sluice flap by making proper sealing arrangement of spindle nut seat for lifting of flape up & down by rotation of spindle with gear box by bolting with C.I. plate as per job condition on both side of seat
Repairing of SS guide SUO by proper remetling of SS material, drilling and bolting by SS LN bolt making grinding etc as per required by job.
Repairing of SS Seat of flap by remetling, polishing etc. and making grinding as required by job.
Repairing of Bronze Nut by fixing of Bronze Bush in worn out damage thread and rethreading the same. (As per sample)
Replacement of thrust Bearing No. 51217.
Repairing of main bewel gear by remetling, making proper teeth on milling machine and also making slotted. Bore keys as per main guide of bewel shaft with locking arrengement as per job conditions.
Repairing of bewel pinion by remetling and making proper teeth on milling machine for teeth.
Replacement of hardware item of gear box.
Assembling of gear box with bearing etc. greasing.
Assembling flap upper dome SS spindle, G.M nut, Bearings, gland housing and at workshop loading to truck and return back to plant.
Opening of dead flange from the main body by removing of nut bolt. Assembling body with packing nut bolt and operation sluice valve in body by gear box drive as required for closing and opening on load
V.K. ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .