| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹14,044 (3.86%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | spp engineearing | MSC ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the spalled/ distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 12.4 | M3 | 59,631.6 ₹70,365.29 Lowest | 61,900.8 ₹73,042.94 |
| 2.00 | Providing RTS reinforcement cutting bending and tying in position with binding wire including cost of all materials labour, lead, lift, etc., complete. | 496 | Kg | 47,616 ₹56,186.88 Lowest | 49,600 ₹58,528 |
| 3.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 39.8 | M2 | 21,452.2 ₹25,313.6 Lowest | 22,288 ₹26,299.84 |
| 4.00 | Providing RCC 1:1.5:3 using OP/PP cement with 6 to 10mm metal including cost of all materials, labours, lead, lift, tools, curing etc. complete. | 12.4 | M3 | 1,15,778.8 ₹1,36,618.98 Lowest | 1,20,180.8 ₹1,41,813.34 |
| 5.00 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. | 118 | M2 | 1,062 ₹1,253.16 Lowest | 1,180 ₹1,392.4 |
| 6.00 | Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, labours, lead, lift, curing, etc. complete | 1 | M3 | 6,791 ₹8,013.38 Lowest | 7,049 ₹8,317.82 |
| 7.00 | Plastering with C.M.1:5, 12 mm thick with Nitobond AR mixed in cement mortar at 250ml/bag of cement including cost of all materials, labours, lead, lift, curing, etc. complete | 122 | M2 | 37,210 ₹43,907.8 Lowest | 38,552 ₹45,491.36 |
| 8.00 | Plastering in CM 1:3, 12mm thick with Nitobond AR mixed in cement mortar at 250ml/bag of cement for wall/ ceiling, etc., rate including cost of all materials, labours, leads, lifts etc., complete. | 38.1 | M2 | 12,268.2 ₹14,476.48 Lowest | 12,725.4 ₹15,015.97 |
| 9.00 | Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete | 264.2 | M2 | 62,351.2 ₹73,574.42 Lowest | 64,729 ₹76,380.22 |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
9 Jul 2025, 2:00 pmClosed
CE TTPS TTN 4
O o SE Civil TTPS TTN 4
Repair and Maintenance Works to the Mill Floor and Bottom Ash Hopper Pedestal in Unit 3
2025_EB_572552_1
CE SE C TTPS Spec No.132 25 26
Open Tender
Civil Works - Others
Item Rate
60 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,800
Yes
7 Nov 2025
23 Jun 2025
10 Jul 2025
23 Jun 2025
9 Jul 2025
23 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .