Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance PUNE | MAHARASHTRA | 410301 | L1 | Admitted-Finance | ||
| 2 | L1₹10.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L2₹10.0 L+₹5,934.02 (0.60%)Admitted-Finance | L2 | Admitted-Finance | ||
| 4 | L3₹10.0 L+₹7,945.55 (0.80%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L4₹10.2 L+₹20,014.73 (2.01%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹10.6 L
EMD Value
₹10,647
Closing Date
12 Aug 2026, 6:00 pmClosed
Add.Chief Executive Officer Z.P.Pune WellaslayRd.C
Z.P.Pune WellaslayRd.Camp pune 01
41.Construction of the road leading towards the Shambho Payatha Temple at Bibi Bursewadi tal khed
2026_RDPUN_1324813_41
ZPPune/North/e-Tender/5/26-27
Open Tender
Civil Works - Roads
Percentage
100 days
Z.P.Pune WellaslayRd.Camp pune 01
As per Tender notice
10 documents required · 10 mandatory
₹590
₹10,647
26 Sept 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 720 | Square Metre | 12 | ₹8,640 |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 144 | Cubic Metre | 119 | ₹17,136 |
| 3 | Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed | 144 | Cubic Metre | 139 | ₹20,016 |
| 4 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 % of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller. | 144 | Cubic Metre | 91 | ₹13,104 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2) mm Aggregate) | 196.5 | Cubic Metre | 2,729.02 | ₹5,36,252.43 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) | 90 | Cubic Metre | 2,680.67 | ₹2,41,260.3 |
| 7 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete | 120 | Cubic Metre | 654.98 | ₹78,597.6 |
| 8 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complet | 120 | Cubic Metre | 79 | ₹9,480 |
| 9 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete | 600 | Square Metre | 21 | ₹12,600 |
| 10 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diaMetre in proper line, level and slope including providing and fixing collars in cement mortar 1:2
and curing etc. complete. | 15 | Running Metre | 2,790.44 | ₹41,856.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.87 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.63 MB
Tendernotice_5.pdf
PDF • 0.39 MB
Tendernotice_6.pdf
PDF • 0.12 MB
Tendernotice_7.pdf
PDF • 0.36 MB
BOQ_2269437.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .