| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-Finance | ₹19.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹19.7 LAccepted-Finance | ₹19.7 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | A SURYAKUMARAN L2 | SIVARAMAN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drainage with Horizantal Soak Pit at Pagadupattu Soundar house to Gnadeepam School 300m at Pagadupattu H/O C.K.Hills Therkkunadu Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 199.5 | Cum | 197.22 ₹39,345.39 | 197.22 ₹39,345.39 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 28.5 | Cum | 6,646.03 ₹1.9 L | 6,646.03 ₹1.9 L |
| 4.00Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors etc, complete. | |||||
| 5.00 | Sides | 732.25 | sqm | 694 ₹5.1 L | 694 ₹5.1 L |
| 6.00 | Cement concrete . 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 82.8 | Cum | 8,055 ₹6.7 L | 8,000 ₹6.6 L |
| 7.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 90 | sqm | 363.66 ₹32,729.40 | 363.66 ₹32,729.40 |
| 8.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete | 0.14 | Mt | 1,03,211.5 ₹14,449.61 | 1,03,211.5 ₹14,449.61 |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.95 | Cum | 10,992.79 ₹32,428.73 | 10,992.79 ₹32,428.73 |
| 10.00 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete | 138 | sqm | 76.84 ₹10,603.92 | 76.84 ₹10,603.92 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
15 Jul 2025, 3:00 pmClosed
BDO (VP)
BDO Office, P.N.Palayam Block
Construction of Drainage with Horizontal Soakpit at Pagudupattu Soundar House to Gnadeepam Shool (300M) Panchayat Pedhanayakampallyam Block at Salem District OMDGF - 2025-26
2025_RDTN_577565_1
Roc.No.1616/2025/A2
Open Tender
Civil Works
120 days
BDO Office, P.N.Palayam Block
As per tender document
3 documents required · 3 mandatory
₹0
₹20,000
Yes
6 Mar 2026
3 Jul 2025
15 Jul 2025
3 Jul 2025
15 Jul 2025
3 Jul 2025
Amount
Construction of Drainage with Horizantal Soak Pit at Pagadupattu Soundar house to Gnadeepam School 300m at Pagadupattu H/O C.K.Hills Therkkunadu Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors etc, complete.
Sides
Cement concrete . 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
HORIZANTAL SOAK PIT
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Drain
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors etc, complete.
Sides
Cement concrete . 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying and Filling ISS HBG 20mm iss metal including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and Filling ISS HBG 6 to 10mm Chips metal including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply and fixing Cuddapah slabs 50mm thick including all labour charges etc.complete,
Supplying and fixing P.V.C pipe of 110m dia including all labour charges
Provision for Plants
Provision for Screening mesh arrangement Chareges
Supply of PVC pipe for Ventilator pipe with Cowl
Provision for Man hole of size 0.20 x 0.20m for Anaribic
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A SURYAKUMARAN (BID ID -1401208)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid