Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Fee/PreQual/Technical/Finance | -6.00% | ₹9.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.3 L+₹2,274.24 (0.24%)Admitted-Fee/PreQual/Technical/Finance | -5.77% | ₹9.3 L+₹2,274.24 (0.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
18 Sept 2026, 12:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Building C and M Division Erode
Special Repairs to Ceiling, Doors, Windows, Aluminium partition and painting arrangements for Skill Lab in Government Erode Medical College and Hospital at Perundurai in Erode District
2026_PWD_701199_1
NIT.06 2026 27 BCM DIVISION ERODE Dated 01.09.2026
Open Tender
Maintenance Works
Percentage
perundurai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹10,000
21 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Chipping of concrete & roughening the surface etc., complete as per standard specification and as directed by the deparmental officers. | 80 | M2 | 43.2 | ₹3,456 |
| 2 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 80 | M2 | 328.75 | ₹26,300 |
| 3 | Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers. | 673.2 | kg | 107.8 | ₹72,570.96 |
| 4 | Fabricating Supplying and fixing in position of Aluminium anodised powdered coated 1/3rd fixed glazing 2/3rd prelaminated board of Aluminium partition of size 3.50 x 2.88m. The outer frames Outer frame: 63.50x38x3mm@ 1.72 kg/ m,Centre mullions: 63.50x38x3mm@ 1.55 kg/m,Alu. Clips: 17.27x17.15x1.50mm @ 0.175kg/mg/m for intermediate vertical mullion 90cm c/c. Horizontal mullion at 1.00m 2.10m covered with 5.5mm thick plain glass with neccessary aluminium clips of size 17.27x17.15 x1.50mm @ 0.176kg/m and with required rubber beading etc., including necessary dismantling holes in RCC column,masonry wherever in necessary with power drills to the extent required and made good the damaged portion in good condition after fixing etc... complete complying with standard specification and as directed by the deparmental officers. All the aluminium sections should be anodised not less than 15 microns as ISI specification1868/1962 / and should be gotapproved by Executive Engineer before use. | 142.76 | M2 | 4,087.7 | ₹5,83,560.05 |
| 5 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 827.8 | M2 | 178.7 | ₹1,47,927.86 |
| 6 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with One coats of best approved first quality and colour of synthetic enamel paint over the priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 26.93 | M2 | 154.1 | ₹4,149.91 |
stage.html
html • 0.02 MB
finance_842790.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tencon_Skilllab.pdf
Tender Documents • 2.06 MB
BOQ_842790.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .