| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹15.2 LRejected-AOC | ₹15.2 L | L2 | Rejected-AOC L2 Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw the Contractor |
| Sl No | Description | Qty | Unit | R. BHOOLOGANATHAN L2 | SriAruthraEngginiring Contractor L1 |
|---|---|---|---|---|---|
| 1.00Construction of Anganwadi Building at Kulipirai near Valluvar School in Kulipirai Panchayat | |||||
| 2.00 | EARTHWORK EXCAVATION for foundation in hard soil and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil ) | 42.28 | Cum | 265 ₹11,204.2 | 263.5 ₹11,140.78 Lowest |
| 3.00 | Filling in foundation and basement with M.Sand in layer of not more than 15cm thick including all charges etc.complete | 11.66 | cum | 1,740 ₹20,288.4 | 1,736.5 ₹20,247.59 Lowest |
| 4.00 | Refilling in foundation and basement with excavated eartth in layer of not more than 15cm thick including all charges etc.complete | 17.78 | cum | 46 ₹817.88 | 45.8 ₹814.32 Lowest |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 12.47 | cum | 5,400 ₹67,338 | 5,379.5 ₹67,082.37 Lowest |
| 6.00 | Brick Work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete | 33.24 | Cum | 6,150 ₹2,04,426 | 6,085.5 ₹2,02,282.02 Lowest |
| 7.00Supplying and erecting centering shuttering including necessary supports for the plane surgace in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slab, slaircase steps, bed blocks,critical pier etc., | |||||
| 8.00 | Below sill Level | 36.41 | Sqm | 560 ₹20,389.6 | 547.5 ₹19,934.48 Lowest |
| 9.00 | Above Sill Level | 110.13 | Sqm | 1,060 ₹1,16,737.8 Lowest | 1,095 ₹1,20,592.35 |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 2 | MT | 92,500 ₹1,85,000 | 91,960 ₹1,83,920 Lowest |
Tender Value
₹15.5 L
EMD Value
₹15,500
Closing Date
19 Feb 2026, 3:00 pmClosed
Bdo.Thirumayam
Pt.Union Office,Thirumayam
Construction of Anganwadi Building at Kulipirai near Valluvar School in Kulipirai Panchayat
2026_RDTN_658046_1
Tym/MLACDS/Work-3
Open Tender
Civil Works
Item Rate
Thirumayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,500
12 Aug 2026
16 Feb 2026
19 Feb 2026
16 Feb 2026
19 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Anganwadi Building at Kulipirai near Valluvar School in Kulipirai Panchayat | - | - | - | - |
| 2 | EARTHWORK EXCAVATION for foundation in hard soil and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil ) | 42.28 | Cum | - | - |
| 3 | Filling in foundation and basement with M.Sand in layer of not more than 15cm thick including all charges etc.complete | 11.66 | cum | - | - |
| 4 | Refilling in foundation and basement with excavated eartth in layer of not more than 15cm thick including all charges etc.complete | 17.78 | cum | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 12.47 | cum | - | - |
| 6 | Brick Work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete | 33.24 | Cum | - | - |
| 7 | Supplying and erecting centering shuttering including necessary supports for the plane surgace in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slab, slaircase steps, bed blocks,critical pier etc., | - | - | - | - |
| 8 | Below sill Level | 36.41 | Sqm | - | - |
| 9 | Above Sill Level | 110.13 | Sqm | - | - |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 2 | MT | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tym_doc--3.pdf
Tender Documents • 0.11 MB
BOQ_789354.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].