Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60,180Accepted-AOC | L1 | Accepted-AOC The L1 Bidder issued of AOC | |
| 2 | L2₹62,540+₹2,360 (3.92%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder Rejected | |
| 3 | L3₹5.0 L+₹4.4 L (729.4%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder Rejected |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
16 Dec 2023, 2:00 pmClosed
CE/NCTPS-I
North Chennai Thermal Power Station I, Chennai 600 120
AHP Dn Breakdown works in 6 Ton capacity EOT crane in unit I II III and ash water pump side crane 3 Ton capacity in ash handling pump house
2023_EB_395601_1
CE/NCTPSI/SE/MII/Sp.No98/23-24
Open Tender
Power/Energy Projects/Products
Works
15 days
Work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,400
Yes
30 Sept 2024
2 Dec 2023
18 Dec 2023
2 Dec 2023
16 Dec 2023
2 Dec 2023
Amount
Reconditioning of brake drum and renewal of new brake lining for LT, CT hoist of 6 Ton capacity.
Dismantling of long travel power supply cable wheels for overhauling of all wheels and cleaning of wheels and replacing the worn out parts.
Alignment checking of rails and correcting misalignment by removing of rails cleaning water level settings adding shims packer plates if required and clamping of 3 Ton EOT crane of Ash water bay.
Rewinding of 1 No. LT motor (Main Hoist Motor – 1 No.) at AHP including rewinding of the stator & rotor coils are applying one cost of Dr. Bercks insulating varnish, replacement of both DE and NDE bearings and assembling Rewinding of stator 3 phase, 415 V, 10.7 KW, 910 RPM Main Hoist LT wound Induction motor removing of existing old winding, cleaning of slots, repairing the core if necessary insulating with “F” class insulation rewinding with “F” class copper conductor brazing the joints, binding the overhauling tapping with fire glass tape, varnishing with Dr. Beckinsulation and reassembling after changing the motor both ends bearing, providing new terminal block with copper links (bearings will be supplied by TANGEDCO) (Retrieved copper will be retained by the contractor).
Restacking of stator core
Rewinding of rotor for 1 No. 10.7 KW 3 phase wound induction motor removing of existing, cleaning of slots, insulating with “F” class insulation, rewinding with “F” class copper conductor, brazing the joints, binding the overhangs tapping with fibre glass tape, varnishing with Dr. Beckinsulation and providing new with copper links (retrieved copper will be retained by the contractor)
Restacking of rotor core
Copper insulation material
Transport from NCTPS-I to workshop and workshop to NCTPS-I including loading and unloading cost
Consumables and Tools & Plants for Sl.No.1, 2, 3, 4 & 6.
SRI RAVI BALAJI ERECTORS
JS ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .