Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹144.4 CrQualified | Qualified | |
| 2 | Qualified | Qualified | |
| 3 | Qualified | Qualified | |
| 4 | Qualified | Qualified | |
| 5 | Qualified | Qualified |
Tender Value
Refer Docs
EMD Value
₹2.7 Cr
Closing Date
8 Dec 2020, 11:00 amClosed
Mrs. Charanya Ambati
Power Grid Corporation of India Limited -Saudamini, 3rd Floor, Plot No 2, Sector-29 Gurugram (Haryana) - 122001
Tower Package - TW01 for -Stringing of 2nd circuit of 400kV D/C Kishenpur-Dulhasti line with Quad Moose Conductor - Kishenpur end termination with S/C towers --Kishtwar end termination with S/C and D/C towers associated with Transmission System for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs
CC-CS/1055-NR2/TW-4178/3/G5
Open
Electrical - All
Works
Kishenpur, Dulhasti
₹25,000
₹2.7 Cr
7 Feb 2022
5 Nov 2020
10 Dec 2020
5 Nov 2020
8 Dec 2020
5 Nov 2020
12 Nov 2020
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
01st Envelope-Bid Form & Attachments_TW01.xls
xls • 6.98 MB
02-Attachment-8- Manufacturers Authorization Form_TW01.doc
doc • 0.03 MB
03-Attachment-18-SAFETY PACT_TW01.docx
docx • 0.03 MB
04-Attachment-21- Authorization Certificate issued by Domestic Manufacturer_TW01.docx
docx • 0.02 MB
05-Attachment-22- Affidavit for Self Certifictaion_TW01-Iron & Steel.docx
docx • 0.02 MB
06_Attachemnt-23- Affidavit for self-certifictaion.DOCX
docx • 0.02 MB
07_Attachment 24- certificate by Auditor.docx
docx • 0.02 MB
08-Attachment-25-Compliance to the process related to the e-RA_TW01.docx
docx • 0.02 MB
09-Attachment -26_Declaration regarding events encountered_TW01.docx
docx • 0.03 MB
10_attachment 27- certifacte by bidder.docx
docx • 0.02 MB
11_Second Envelope BPS & Bid Form_TW01.xls
xls • 6.04 MB
12-Legends.pdf
pdf • 0.03 MB
06-04-Section-VI Hardware.pdf
pdf • 11.11 MB
06-03-Section-VI Hardware.pdf
pdf • 14.38 MB
06-02-Section-VI Hardware.pdf
pdf • 14.62 MB
06-01-Section-VI Hardware.pdf
pdf • 13.99 MB
Sec-XII FAQ.pdf
pdf • 0.37 MB
SFQP Transmission Line Pile Foundation, Revision 05A.pdf
pdf • 8.88 MB
Standard MQP Conductor.pdf
pdf • 4.76 MB
05 b MQP Earthwire.PDF
pdf • 0.19 MB
05-1Sec-V,Earthwire Rev-6 March-2018.pdf
pdf • 0.60 MB
07_1 _Section VII_Conductor_ Rev Oct-2020.pdf
pdf • 2.36 MB
08_1_Section-8 COMPOSITE Rev-6 March-2018 Mod Sept-2020.pdf
pdf • 0.90 MB
08A- Section-VIIIA (Porcelain).pdf
pdf • 0.64 MB
Section-X_TS_OPGW_Ver_Dec2019.PDF
pdf • 9.07 MB
03_2-Sec-III(2nd part Annex-A Format for site for Details .pdf
pdf • 1.70 MB
03_3_ TS_VOL-II_,Sec-III _2nd Part_ Annex B -C-D-E.pdf
pdf • 0.48 MB
04_1-Section 4-Rev-6 March-2018 with Mod July-20.pdf
pdf • 1.07 MB
04_2_APP-I_Precommissioning final.pdf
pdf • 1.25 MB
04_3_APP-II_SFQP Transmission Line, Revision 06.pdf
pdf • 2.80 MB
04_4_APP-III_SMQP Rev-5.pdf
pdf • 3.40 MB
04_5_Annex-I_ SAT.pdf
pdf • 0.33 MB
04_6_AM formats.pdf
pdf • 0.56 MB
04_7_APP-IV_List of T&P.pdf
pdf • 0.83 MB
01-Section-I.pdf
pdf • 1.85 MB
02-Section-II -Rev-6 March-2018 with Mod Aug-2020.pdf
pdf • 0.83 MB
03_1-SECTION - 3 - Rev-6 March-2018 with Mod upto Oct-2018.pdf
pdf • 0.99 MB
132kV and 220kV Typical Tower.pdf
pdf • 0.04 MB
BIRD DIVERTER DRAWING.pdf
pdf • 0.07 MB
bird gurad for V String.pdf
pdf • 0.35 MB
Chemical Counterpoise.pdf
pdf • 0.10 MB
Chemical Pipe Type.pdf
pdf • 0.10 MB
Covered grading Ring Drawing.pdf
pdf • 0.62 MB
GA_A_PROP TYPE SST Model (1).pdf
pdf • 0.17 MB
HARD ROCK EARTHING.pdf
pdf • 0.19 MB
Individual Leg SST.pdf
pdf • 0.58 MB
Insulator Packing drawing PVC type.pdf
pdf • 0.88 MB
Insulator Packing drawing.pdf
pdf • 0.09 MB
pile earthing Drawing.pdf
pdf • 0.30 MB
Revised Bird Guard Sheet 1 of 2.pdf
pdf • 0.10 MB
Revised Bird Guard Sheet 2 of 2 .pdf
pdf • 0.11 MB
Rod Type Earthing.pdf
pdf • 0.15 MB
Std Wooden Drum Model EW.pdf
pdf • 0.20 MB
Thumbs.db
db • 0.28 MB
Tower & Access.pdf
pdf • 3.02 MB
~$-Section - I IFB SSTE Vol-I_TW01 F1.docx
docx • 0.00 MB
00-Cover Page_Vol-I_TW01.doc
doc • 0.63 MB
01-Section - I IFB SSTE Vol-I_TW01.docx
docx • 0.05 MB
02-Section - II ITB SSTE S&I Rev 5-DCB-Mjn.pdf
pdf • 1.95 MB
03 Section - III BDS SSTE Vol-I_TW01.docx
docx • 0.07 MB
04-ANNEXURE-A (BDS) _TW01.doc
doc • 0.08 MB
04-Annexure-B to BDS _TW01.docx
docx • 0.02 MB
04-Annexure-C (BDS)_TW01.docx
docx • 0.02 MB
04-Annexure-D to BDS_TW01.docx
docx • 0.03 MB
05-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
06-Section - V SCC SSTE Vol-I_TW01.docx
docx • 0.05 MB
07 Annexure-I to SCC.pdf
pdf • 0.63 MB
08-Appendix-I to SCC_TW01.doc
doc • 0.17 MB
09-Section - VI Forms and Proceedures Vol-I_TW01.doc
doc • 0.56 MB
Revised Form of Joint Deed of Undertaking by the Collaborator.pdf
pdf • 0.22 MB
01_Clarification No-IV -TW01.pdf
pdf • 0.16 MB
01_Amendment No-VII.pdf
pdf • 0.18 MB
Attachment-28-Bid-Securing Declaration _TW01.docx
docx • 0.02 MB
11_Second Envelope BPS & Bid Form_TW01_Rev1.xls
xls • 6.15 MB
00_OBD_EXTN-II_LETTER_TW01.pdf
pdf • 0.54 MB
02_Clarification No-II -TW01.pdf
pdf • 0.12 MB
00_OBD_EXTN-I_LETTER_TW01.pdf
pdf • 0.48 MB
02_Clarification No-I -TW01.pdf
pdf • 0.20 MB
01_Amendment No-II.pdf
pdf • 0.11 MB
01_Amendment No-I.pdf
pdf • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .