Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 LAdmitted-Finance | ₹32.2 L | L1 | Admitted-Finance |
| 2 | L2₹33.8 LAdmitted-Finance | ₹33.8 L | L2 | Admitted-Finance |
| 3 | L3₹34.4 LAdmitted-Finance | ₹34.4 L | L3 | Admitted-Finance |
| 4 | L4₹36.6 LAdmitted-Finance | ₹36.6 L | L4 | Admitted-Finance |
| 5 | L5₹38.7 LAdmitted-Finance | ₹38.7 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SR CONSTRUCTIONS L8 | A M CHOUDHURY AND CO L1 | MD ABIDUR ALI L3 | Chief Builders &Consultants L7 | PEE BEE INDIA L6 | M/S P.G CONSTRUCTION L2 | 4S ASSOCIATES L5 | M/S M R CONSTRUCTION & CO L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | |||||||||||
| 1.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 5.96 | Cum | 800 ₹4,768 | 580 ₹3,456.80 | 620 ₹3,695.20 | 770 ₹4,589.20 | 780 ₹4,648.80 | 600 ₹3,576 | 750 ₹4,470 | 655 ₹3,903.80 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 194.75 | Sqm | 70 ₹13,632.50 | 30 ₹5,842.50 | 40 ₹7,790 | 65 ₹12,658.75 | 56 ₹10,906 | 35 ₹6,816.25 | 55 ₹10,711.25 | 47 ₹9,153.25 |
| 3.00 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 814 | Sqm | 65 ₹52,910 | 28 ₹22,792 | 35 ₹28,490 | 55 ₹44,770 | 45 ₹36,630 | 32 ₹26,048 | 44 ₹35,816 | 38 ₹30,932 |
| 4.00 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 120 | Sqm | 60 ₹7,200 | 26 ₹3,120 | 38 ₹4,560 | 53 ₹6,360 | 48 ₹5,760 | 28 ₹3,360 | 48 ₹5,760 | 44 ₹5,280 |
| 5.00 | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 5 | Each | 185 ₹925 | 140 ₹700 | 155 ₹775 | 175 ₹875 | 166 ₹830 | 145 ₹725 | 166 ₹830 | 157 ₹785 |
| 6.00 | Taking down wooden chowkats or frames woth shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 5 | Each | 175 ₹875 | 130 ₹650 | 145 ₹725 | 166 ₹830 | 160 ₹800 | 135 ₹675 | 160 ₹800 | 152 ₹760 |
| 7.00 | Taking down wooden shutters of any description exceeding 1.00 Sqm but not exceeding 2.00 Sqm each complete all as specified and as directed. | 10 | Per Leaf | 165 ₹1,650 | 125 ₹1,250 | 140 ₹1,400 | 162 ₹1,620 | 152 ₹1,520 | 132 ₹1,320 | 155 ₹1,550 | 147 ₹1,470 |
| 8.00 | Taking down wooden shutters of any description not exceeding 1.00 Sqm each complete all as specified and as directed. | 10 | Per Leaf | 158 ₹1,580 | 120 ₹1,200 | 130 ₹1,300 | 152 ₹1,520 | 142 ₹1,420 | 127 ₹1,270 | 142 ₹1,420 | 138 ₹1,380 |
| 9.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 437.78 | Sqm | 55 ₹24,077.90 | 20 ₹8,755.60 | 25 ₹10,944.50 | 50 ₹21,889 | 45 ₹19,700.10 | 27 ₹11,820.06 | 44 ₹19,262.32 | 38 ₹16,635.64 |
Tender Value
₹33 L
EMD Value
₹66,000
Closing Date
6 May 2026, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
COMPREHENSIVE MAINT AND CERTAIN B/R WORKS OF MINOR UNIT OF 825 AND ARO AREA AT ROWRIAH AND REPAIR TO DILAPIDATED ROOF SHEETS FALSE CEILING JOINARY GLAZING FLOORING PLASTERING AND ASSOCIATED WORKS AT LICHUBARI UNDER GE JORHAT
2026_MES_760624_1
8312/GE/E8
Open Tender
Civil Works
180 days
GE JORHAT
As per Tender Documents
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹66,000
Yes
5 Jun 2026
16 Apr 2026
9 May 2026
16 Apr 2026
6 May 2026
30 Apr 2026
16 Apr 2026 - 23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | - | Cum | - | - | |
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | - | Sqm | - | - | |
Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | - | Sqm | - | - | |
Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | - | Sqm | - | - | |
Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | - | Each | - | - | |
Taking down wooden chowkats or frames woth shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | - | Each | - | - | |
Taking down wooden shutters of any description exceeding 1.00 Sqm but not exceeding 2.00 Sqm each complete all as specified and as directed. | - | Per Leaf | - | - | |
Taking down wooden shutters of any description not exceeding 1.00 Sqm each complete all as specified and as directed. | - | Per Leaf | - | - | |
Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | - | Sqm | - | - | |
Demolition of cement concrete of (unreinforced) any description and any position not otherwise specifically provided for and removal of rubbish from the site complete all as specified and as directed. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tender_8312.rar
Tender Documents • 2.15 MB
BOQ_852004.xls
BOQ • 5.55 MB
Download all tender documents and submit your bid