Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.1 CrRejected-Finance SINGAHI ROAD NIGHASAN LAKHIMPUR KHERI UP | KHERI | UTTAR PRADESH | 261501 | ₹4.1 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.4 CrRejected-Finance MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | ₹4.4 Cr | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.6 CrRejected-Finance GRAM HAZRATPUR PO SAHKARI NAGAR DISTRICT BULANDSHAHR | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | ₹4.6 Cr | L4 | Rejected-Finance Rejected |
| 5 | L5₹4.7 CrRejected-Finance 102 IST FLOOR DEVIKA CHAMBER RDC RAJ NAGAR GHAZIABAD U P | GHAZIABAD | UTTAR PRADESH | 201001 | ₹4.7 Cr | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | DEVEDNRA KUMAR L4 | NP BUILDWELL PRIVATE LIMITED L5 | M/S Neeraj Kumar Contractor L2 | Anil kumar L3 | SADHNA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per MORT&H specification 201 SI. No. 2.03 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 5,000 | sqm | 3 ₹15,000 | 6 ₹30,000 | 5 ₹25,000 | 3 ₹15,000 | 5 ₹25,000 |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MORT&H specification 301 SI. No. 3.6 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 1,300 | Cum | 40 ₹52,000 | 103 ₹1.3 L | 20 ₹26,000 | 90 ₹1.2 L | 50 ₹65,000 |
| 3.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material with in all lifts and leads upto 1000 metres. as per MORT&H specification 305.4.3 SI. No. 3.15 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 11,000 | sqm | 6 ₹66,000 | 6 ₹66,000 | 200 ₹22 L | 7 ₹77,000 | 5 ₹55,000 |
| 4.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 18,500 | Cum | 100 ₹18.5 L | 56 ₹10.4 L | 30 ₹5.5 L | 46 ₹8.5 L | 100 ₹18.5 L |
| 5.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 (B) Sr No 4.1 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 1,300 | Cum | 2,600 ₹33.8 L | 3,589 ₹46.7 L | 2,000 ₹26 L | 2,900 ₹37.7 L | 2,400 ₹31.2 L |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 (A) Sr No 4.14 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 3,400 | Cum | 3,300 ₹1.1 Cr | 3,804 ₹1.3 Cr | 2,500 ₹85 L | 3,100 ₹1.1 Cr | 2,500 ₹85 L |
| 7.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. MORT&H Specification 502 A Sr No 5.01 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 29,150 | Sqm | 25 ₹7.3 L | 34 ₹9.9 L | 28 ₹8.2 L | 25 ₹7.3 L | 15 ₹4.4 L |
| 8.00 | Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. MORT&H Specification 505 B Sr No 5.4 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 1,890 | Cum | 9,500 ₹1.8 Cr | 8,935 ₹1.7 Cr | 8,250 ₹1.6 Cr | 8,900 ₹1.7 Cr | 8,300 ₹1.6 Cr |
| 9.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 Sr No 5.2 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 29,150 | Sqm | 10 ₹2.9 L | 9.85 ₹2.9 L | 10 ₹2.9 L | 10 ₹2.9 L | 8 ₹2.3 L |
| 10.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 B Sr. No. 5.5 complete in all respects Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. | 870 | Cum | 10,500 ₹91.3 L | 9,860 ₹85.8 L | 9,500 ₹82.7 L | 10,600 ₹92.2 L | 8,800 ₹76.6 L |
Tender Value
₹6.1 Cr
EMD Value
₹12.2 L
Closing Date
24 Dec 2025, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Widening And Strengthening of Dariyapur Dostpur Gangerua Khetalpur Bhansauli road from Ch. 0.000 to 5.400
2025_CEMRT_1098427_1
8511/96M/E-Tender/BSR Circle/2025-26 dt. 12.11.2025
Open Tender
Civil Works - Roads
365 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹12.2 L
SE BSR Circle PWD Bulandshahr
7 Feb 2026
12 Dec 2025
24 Dec 2025
12 Dec 2025
24 Dec 2025
12 Dec 2025
12 Dec 2025 - 12 Dec 2025
12 Dec 2025
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per MORT&H specification 201 SI. No. 2.03 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MORT&H specification 301 SI. No. 3.6 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material with in all lifts and leads upto 1000 metres. as per MORT&H specification 305.4.3 SI. No. 3.15 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 (B) Sr No 4.1 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 (A) Sr No 4.14 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. MORT&H Specification 502 A Sr No 5.01 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. MORT&H Specification 505 B Sr No 5.4 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 Sr No 5.2 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 B Sr. No. 5.5 complete in all respects Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. as per MORTH specification clause No. 601 Sr. No. 6.10 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per MORTH specification clause No.602 Sr. No. 6.02 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. MORT&H Specification 304 Sr No 3.13 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. MORT&H Specification 2100 Sr No 12.04 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. MORT&H Specification 1300 Sr No 12.05 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Supply and fixing of 1000 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.02 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.03 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.25% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @0.50% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @0.75% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @1% of Total Work Amount)
M/S Neeraj Kumar Contractor (BID ID -5765561)
Anil kumar (BID ID -5766334)
DEVEDNRA KUMAR (BID ID -5761403)
NP BUILDWELL PRIVATE LIMITED (BID ID -5766224)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 1.31 MB
BOQ_2023181.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid