GEMC-511687733897795
Awarded to RS POWER SYSTEMS PRIVATE LIMITED
₹27.1 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Design, Supply, Fabrication, Installation, Testing and Commissioning of Solar Plant with Diesel Generator synchronization panel for 2 DGs of 500KVA | POWER PLUS / PPDGS | 9987 | 1 LUMP SUM | 755,200 | 755,200 |
| Supply, Installation, Testing and Commissioning of 2 Pair 1.5 SQ.MM CABLE | - | 8544 | 1,500 METER | 118 | 177,000 |
| Supply, Installation, Testing and Commissioning of 4 Core 2.5 SQ.MM CABLE | - | 8544 | 50 METER | 177 | 8,850 |
| Supply and Laying of RS485 MODBUS CABLE | - | 8544 | 1,500 METER | 118 | 177,000 |
| Supply and Laying of 2 inch HDPE PIPE | - | 9997 | 50 METER | 59 | 2,950 |
| EXCAVATION FOR ROAD CUTTING | - | HSN not specified by seller | 3 CUBIC METER | 1,711 | 5,133 |
| Supply and Laying of 12 inch HUME PIPE IN ROAD CUTTING | - | HSN not specified by seller | 8 METER | 2,776.47 | 22,211.76 |
| Supply, Installation, Testing and Commissioning of 50MM Cable tray | - | HSN not specified by seller | 50 METER | 59 | 2,950 |
| Soil Excavation | - | HSN not specified by seller | 3 CUBIC METER | 649 | 1,947 |
| Supply and laying of PCC | - | HSN not specified by seller | 3 CUBIC METER | 8,496 | 25,488 |
| Supply, Fabrication and Installation of structural steel | - | HSN not specified by seller | 1 METRIC TONNE | 23,600 | 23,600 |
| Brick Masonry | - | HSN not specified by seller | 1 CUBIC METER | 8,024 | 8,024 |
| Design, Supply, Fabrication, Installation, Testing and Commissioning of Solar Plant with Diesel Generator synchronization panel for 1 DG of 600KVA and 2 DGs of 320KVA | POWER PLUS / PPDGS | 9987 | 1 LUMP SUM | 849,600 | 849,600 |
| Supply, Installation, Testing and Commissioning of 2 Pair 1.5 SQ.MM CABLE | - | 8544 | 2,134 METER | 118 | 251,812 |
| Supply, Installation, Testing and Commissioning of 4 Core 2.5 SQ.MM CABLE | - | 8544 | 300 METER | 177 | 53,100 |
| Supply and Laying of RS485 MODBUS CABLE | - | 8544 | 2,150 METER | 118 | 253,700 |
| Supply and Laying of 2 inch HDPE PIPE | - | 9997 | 350 METER | 59 | 20,650 |
| EXCAVATION FOR ROAD CUTTING | - | HSN not specified by seller | 5 CUBIC METER | 1,711 | 8,555 |
| Supply and Laying of 12 inch HUME PIPE IN ROAD CUTTING | - | HSN not specified by seller | 20 METER | 2,950 | 59,000 |
| Soil Excavation | - | HSN not specified by seller | 3 CUBIC METER | 649 | 1,947 |