Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.1 L+₹59,282 (23.5%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.2 L+₹65,635 (26.0%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹3.2 L+₹72,260 (28.6%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹3.4 L+₹86,564 (34.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹3.9 L
EMD Value
₹7,795
Closing Date
5 Jun 2026, 6:00 pmClosed
Hazari Lal Sah
Silver Jubille Road, Cooch Behar
One time through cleaning of Tufanganj SD Hospital premises, Tufanganj under Cooch Behar Division PWD during the year of 2026_27
2026_WBPWD_5014444_4
WBPWD/AE/CSD_II/NIT_01/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Cooch Behar sadar
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,795
Yes
12 Jun 2026
28 May 2026
8 Jun 2026
28 May 2026
5 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting and removing plants from the surface of walls
parapet etc and making good damages.(a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. | - | Each | 50 | - |
| 1.01 | Up to 12 mtr | - | Each | 60 | - |
| 1.03 | (b) Medium size plant of girth of exposed stem above 75 mm.
but not exceeding 150 mm. lift upto 6 mtr | - | Each | 60 | - |
| 1.04 | Up to 12 mtr | - | Each | 72 | - |
| 2 | Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting
and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge a) 3.90 metre height | - | each | 279 | - |
| 2.01 | Sccafolding of height 7.5m | - | Each | 524 | - |
| 2.02 | b) Shifting each @ 20 times each(one time shifting charge | - | Each | 52.4 | - |
| 3 | Clearing compound premises of shurbs, plants, jungles etc.
by cutting and removing as directed | - | m2 | 11 | - |
| 4 | Resectioning kutcha drain by mathor labour after removing sludge, filth, night soil etc. and bailing out water from source, making earthen bundh where necessary and removing afterwards, trimming the sides and regrading bottom including necessary chilchalling involving earth work upto 150 mm
average thickness and disposal of spoils as directed and fine dressing. ( Payment to be made on area trimmed and dressed i.e. the length measured along the profile length). | - | m2 | 25 | - |
| 5 | Cleaning and removing conservancy garbage mixed with
rubbish & other filthy materials from the road side flank,
drain and compound including cutting, loading, unloading
to and from truck or cart by Mathor labour & removing the
same to any distance. | 1 | %/m3 | 5,662 | ₹5,656.34 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_5082549.xls
BOQ • 0.48 MB
WBF-2911-ii.pdf
Tender Documents • 2.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .