Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
14 Aug 2020, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGUL
THE PROJECT DIRECTOR DRDA, DINDIGUL
Dindigul Dist - 14th Central Finance Commission 2019-20 Additional 2019-2020 - Vathalagundu block road works TN-05-188
2020_RDTN_174388_1
DIPR/2668/Tender/2020 TN-05-188
Open Tender
Civil Works - Roads
Item Rate
180 days
DINDIGUL
Dindigul Dist - 14th Central Finance Commission 2019-20 Additional 2019-2020 - Vathalagundu block road works TN-05-188
5 documents required · 5 mandatory
₹0
₹45,000
THE PROJECT DIRECTOR DRDA, DINDIGUL
9 Sept 2020
3 Aug 2020
14 Aug 2020
3 Aug 2020
14 Aug 2020
3 Aug 2020
3 Aug 2020
Amount
Part 1 :Strengthening the Road from Ayyankovilpatti Burial ground Road KM 0/0-0/335(R98) Estimate Amount Rs.6.01 Lakhs
Clearing the Scrub jungle clearence including all labour charges for burryingng and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking 5 cm to 10 cm old mettaled surface and sectioning etc complete
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.
Applying TACK COAT over WBM surface at 4 Kgof RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Construction of Retaining wall
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B for foundtaion SL No .61
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supplying and erecting centering are strutting including neceassary supports for place surface for Retaining wall, including material and labour etc., complete.
Cement concrete 1:3:6 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Supply of Hectameter stone of size 0.9 x 0.15 x 0.15 meter
Providing and Fixing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 1 :Strengthening the Road from Meenatchi puram Burial ground Road KM 0/0-0/370(R177) Estimate Amount Rs.7.06 Lakhs
Clearing the Scrub jungle clearence including all labour charges for burryingng and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking 5 cm to 10 cm old mettaled surface and sectioning etc complete
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.
Applying TACK COAT over WBM surface at 4 Kgof RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Construction of Retaining wall
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B for foundtaion SL No .61
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supplying and erecting centering are strutting including neceassary supports for place surface for Retaining wall, including material and labour etc., complete.
Cement concrete 1:3:6 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Supply of Hectameter stone of size 0.9 x 0.15 x 0.15 meter
Providing and Fixing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 : Strengthening the Road for P.Viralipatti General Burial Ground Road KM 0/0-0/2 (R123) Est.Amt : Rs 3.84 Lakhs.
Clearing the Scrub jungle clearence including all labour charges for burryingng and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking 5 cm to 10 cm old mettaled surface and sectioning etc complete
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.
Applying TACK COAT over WBM surface at 4 Kgof RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B for foundtaion SL No .61
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supplying and erecting centering are strutting including neceassary supports for place surface for Retaining wall, including material and labour etc., complete.
Cement concrete 1:3:6 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Supply of Hectameter stone of size 0.9 x 0.15 x 0.15 meter
Providing and Fixing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 : Strengthening the Road for P.Viralipatti to Kottaiapatti Main Road Via old vathalagundu Cross R oad KM 0/0-0/445 (R198) Est.Amt : Rs 14.84 Lakhs.
Picking 5 cm to 10 cm old mettaled surface and sectioning etc complete
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.
Applying TACK COAT over WBM surface at 4 Kgof RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B for foundtaion SL No .61
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supplying and erecting centering are strutting including neceassary supports for place surface for Retaining wall, including material and labour etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all labour charges.
Plastering with Cement mortar 1:5 mix to 20 mm thick including all charges
Providing and Fixing Name Board
Supply of Hectameter stone of size 0.9 x 0.15 x 0.15 meter
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 : Strengthening the Road for Ramanaicken patti general burial ground oad KM 0/0-0/200 (R191) Est.Amt : Rs 5.39 Lakhs.
Clearing the Scrub jungle clearence including all labour charges for burryingng and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking 5 cm to 10 cm old mettaled surface and sectioning etc complete
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.
Applying TACK COAT over WBM surface at 4 Kgof RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B for foundtaion SL No .61
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supplying and erecting centering are strutting including neceassary supports for place surface for Retaining wall, including material and labour etc., complete.
Cement concrete 1:3:6 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Supply of Hectameter stone of size 0.9 x 0.15 x 0.15 meter
Providing and Fixing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 4 : Upgradation to the Road from Eluvanampatti Main Road to Nayakkar mayanam KM 0/0 - 0/400 H/O (R144) Estimate Amount Rs.7.52 Lakhs.
Clearing the Scrub jungle clearence including all labour charges for burryingng and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.
Applying TACK COAT over WBM surface at 4 Kgof RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B for foundtaion SL No .61
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supplying and erecting centering are strutting including neceassary supports for place surface for Retaining wall, including material and labour etc., complete.
Cement concrete 1:3:6 mix using 40m ISS HBG metal including cost and conveyance of all labour charges.
Supply of Hectameter stone of size 0.9 x 0.15 x 0.15 meter
Providing and Fixing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S THAVAMANI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .