Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAdmitted-Finance 1ST FLOOR PLOT NO 16 MAHARSHI DAYANAND SARASVATI MARG SECTOR 88 FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s A TO Z NDT SOLUTIONS (P) LTD L1 |
|---|---|---|---|---|
| 1.00 | Material cost for Strengthening of Head Gear structure of Pit-A & Pit -B of Bansra Colliery approximately 2 Ton. ( ISMC 350 x 90, ISMC 300 x 90, Plate- 16 THK, Plate- 12 THK) | 1 | NOS. | 4,41,600 ₹4,41,600 Lowest |
| 2.00 | Manpower & Hydra Cost of Pit-A & Pit -B of Bansra Colliery | 1 | NOS. | 55,200 ₹55,200 Lowest |
| 3.00 | Equipment cost of of Pit-A & Pit -B of Bansra Colliery | 1 | NOS. | 44,160 ₹44,160 Lowest |
| 4.00 | Consumables cost of of Pit-A & Pit -B of Bansra Colliery | 1 | NOS. | 32,518 ₹32,518 Lowest |
| 5.00 | Overhead cost @ 10% | 1 | NOS. | 57,347 ₹57,347 Lowest |
| 6.00 | Material cost for Strengthening of Head Gear structure of Pit -C of Bansra Colliery approximately 12 Ton. ( ISMC 350 x 90, ISMC 300 x 90, Plate- 12 THK) | 1 | Nos. | 12,19,401 ₹12,19,401 Lowest |
| 7.00 | Manpower & Hydra Cost of Pit -C of Bansra Colliery | 1 | Nos. | 92,000 ₹92,000 Lowest |
| 8.00 | Equipment cost of of Pit -C of Bansra Colliery | 1 | Nos. | 59,800 ₹59,800 Lowest |
| 9.00 | Consumables cost of of Pit -C of Bansra Colliery | 1 | Nos. | 71,760 ₹71,760 Lowest |
| 10.00 | Overhead cost @ 10% | 1 | Nos. | 1,44,297 ₹1,44,297 Lowest |
Tender Value
₹42.7 L
EMD Value
₹53,500
Closing Date
26 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General manager, Kunustoria Area
O/o The General manager, Kunustoria Area, P.O- Toposi, Paschim bardhaman, 713362 (W.B)
Strengthening of Head Gear structures as recommended in structural stability report of Pit- A, B n C of Bansra Colliery and Pit- 2 of Parasea Colliery under Kunustoria Area.
2025_ECL_339362_1
ECL/KNT/EnM/e-Ten/25-26/4 dt07.07.2025
Open Tender
Miscellaneous Works
Item Rate
30 days
Bansra/Parasea Colliery
As per NIT
4 documents required · 4 mandatory
₹53,500
27 Aug 2025
11 Jul 2025
28 Jul 2025
11 Jul 2025
26 Jul 2025
12 Jul 2025
12 Jul 2025 - 15 Jul 2025
Amount
Material cost for Strengthening of Head Gear structure of Pit-A & Pit -B of Bansra Colliery approximately 2 Ton. ( ISMC 350 x 90, ISMC 300 x 90, Plate- 16 THK, Plate- 12 THK)
Manpower & Hydra Cost of Pit-A & Pit -B of Bansra Colliery
Equipment cost of of Pit-A & Pit -B of Bansra Colliery
Consumables cost of of Pit-A & Pit -B of Bansra Colliery
Overhead cost @ 10%
Material cost for Strengthening of Head Gear structure of Pit -C of Bansra Colliery approximately 12 Ton. ( ISMC 350 x 90, ISMC 300 x 90, Plate- 12 THK)
Manpower & Hydra Cost of Pit -C of Bansra Colliery
Equipment cost of of Pit -C of Bansra Colliery
Consumables cost of of Pit -C of Bansra Colliery
Overhead cost @ 10%
Material cost for Strengthening of Head Gear structure of Pit -2 of Parasea Colliery approximately 7 Ton. ( 2ISA 100 x 100 x 8, 2ISA 130 x 130 x 8, ISMC 250, Plate- 12 THK)
Manpower & Hydra Cost of Pit -2 of Parasea Colliery
Equipment cost of of Pit -2 of Parasea Colliery
Consumables cost of of Pit -2 of Parasea Colliery
Overhead profit @ 10%
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .