Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC UTTAR PRADESH UP | ₹2.9 Cr | L1 | Accepted-AOC Bidder is Lowest One (L1) |
| 2 | L2₹2.9 Cr+₹3.3 L (1.14%)Rejected-Finance 1252 20 M AVNTIKA BHAWAN STATION ROAD MAINPURI | MAINPURI | MAINPURI | UTTAR PRADESH | ₹2.9 Cr+₹3.3 L (1.14%) | L2 | Rejected-Finance Quoted Amount is not Lowest by bidder |
| 3 | L3₹3.1 Cr+₹21.2 L (7.30%)Rejected-Finance GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | ₹3.1 Cr+₹21.2 L (7.30%) | L3 | Rejected-Finance Quoted Amount is not Lowest by bidder |
| 4 | L4₹3.3 Cr+₹35.7 L (12.3%)Rejected-Finance 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | ₹3.3 Cr+₹35.7 L (12.3%) | L4 | Rejected-Finance Quoted Amount is not Lowest by bidder |
| 5 | Rejected-Technical N A | PALWAL | HARYANA | 121004 | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S NIRMALA RAI CONTRACTOR L1 | M/S A K CONSTRUCTION L4 | SINGH CONTRACTOR L3 | GLOBAL INFRATECH INDIA PVT LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting/silt ramming in all type of soil (loam,clay or sand ) including lift up to 1.5 m, lead upto 30 m, filling watering and ramming of excavated earth in to the trenches or into the space between the structures and sides of the foundation trenches or upto plinth with removal and disposal of surplus earth as per directed by Engineer-in-Charge for proper completion of work.
(Complete Rate) | 1,253.84 | Cum | 90 ₹1,12,845.6 | 120 ₹1,50,460.8 | 113 ₹1,41,683.92 | 56 ₹70,215.04 Lowest |
| 2.00 | Providing & Laying in position cement concrete of specified grade excluding the cost of centering and shuttering in ratio 1:3:6 (1 cement : 3 coarse sand : 6 graded size 20-40 mm nominal size) including all labour, material and T&P and royalty but excluding cost of GST for proper completion of work as per direction of Engineer-in -Charge. (Complete Rate) | 209.98 | Cum | 5,200 ₹10,91,896 | 5,700 ₹11,96,886 | 5,403 ₹11,34,521.94 | 4,450 ₹9,34,411 Lowest |
| 3.00 | Brick work (M-150) in 1:4 cement mortar upto 3 m lift and 60 m lead of material including cost of all labour, material and T&P for proper completion of work as per direction of Engineer-in -Charge. (Complete Rate) | 777.73 | Cum | 5,200 ₹40,44,196 Lowest | 5,687 ₹44,22,950.51 | 5,390 ₹41,91,964.7 | 5,200 ₹40,44,196 Lowest |
| 4.00 | Centering and shuttering of R.C.C. Work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintels, sun shades, column & wall etc. as per directed by Engineer-in -Charge.(Complete Rate) | 497.29 | Sqm | 830 ₹4,12,750.7 | 1,100 ₹5,47,019 | 1,042 ₹5,18,176.18 | 200 ₹99,458 Lowest |
| 5.00 | Providing & Laying in position cement concrete of specified grade excluding the cost of centering and shuttering in ratio 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded size 20mm nominal size) including all labour, material and T&P and royalty but excluding cost of GST for proper completion of work as per directed by Engineer-in -Charge. (Complete Rate) | 289.46 | Cum | 7,000 ₹20,26,220 | 5,900 ₹17,07,814 | 5,654 ₹16,36,606.84 Lowest | 6,500 ₹18,81,490 |
| 6.00 | Steel rainforcement for RCC work including straightening, cutting, bending and placing in position including cost of wires, steel, labour and T&P etc. complete for proper completion of work as per directed by Engineer-in -Charge. (Complete Rate) | 21.83 | MT | 88,110 ₹19,23,441.3 | 82,000 ₹17,90,060 | 7,875 ₹1,71,911.25 Lowest | 82,000 ₹17,90,060 |
| 7.00 | Pointing on brick work or brick flooring with cement mortar 1:3(1 cement : 3 fine sand) including cost of all labour, material and T&P for proper completion of work as per direction of Engineer-in- Charge.(Complete Rate) | 709.5 | Sqm | 214.4 ₹1,52,116.8 | 200 ₹1,41,900 | 189 ₹1,34,095.5 | 100 ₹70,950 Lowest |
| 8.00 | Dismentaling of Brick work in cement mortar and including stacking of material with a distance of 60 M as per directed by Engineer-in -Charge.(Complete Rate) | 85.68 | Cum | 600 ₹51,408 | 500 ₹42,840 | 534 ₹45,753.12 | 80 ₹6,854.4 Lowest |
| 9.00 | Painting work with two coat of acrylic smooth exterior paint of standard quality including cleaning the surface of all dirt, dust and other foreign matter, papering and stopping including cost of material, labour and T&P etc. required for proper completion of work as per directed by Engineer-in -Charge.(Complete Rate) | 893.87 | Sqm | 129 ₹1,15,309.23 | 121 ₹1,08,158.27 | 115 ₹1,02,795.05 | 100 ₹89,387 Lowest |
| 10.00 | Earth work in side embankment / diversion/ Dismantling in ordinary soil, excavation to be in the form of irregular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required level and slopes and also including 1.5 m. lift and 30 m. lead as per directed by Engineer-in -Charge.(Complete Rate) | 1,529.24 | Cum | 67 ₹1,02,459.08 | 86 ₹1,31,514.64 | 82 ₹1,25,397.68 | 45 ₹68,815.8 Lowest |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
30 Aug 2025, 3:00 pmClosed
Superintending Engineer
Office of The Superintending Engineer 2nd Circle Irrigation Works Kanpur
Janpad Kanpur Nagar me Rajwaha Nadiha Ke Km. 0.000 se 17.500 tak Punarsthapana evam Nahari Bhoomi ke Seemankan Karya
2025_UPIDC_1064195_2
03/S.E.-II/2025-26
Open Tender
Civil Works - Canal
Item Wise
365 days
Thesil Narwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,800
₹6.6 L
25 Oct 2025
21 Aug 2025
30 Aug 2025
21 Aug 2025
30 Aug 2025
21 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .