Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC 01 4 KALIBAZAR KALIBAZAR BURDWAN BARDHAMAN WEST BENGAL 713101 | BURDWAN | BARDHAMAN | WEST BENGAL | 713101 | ₹20.5 L | L1 | Accepted-AOC DUE TO L1 BIDDER |
| 2 | L2₹20.8 L+₹22,610.03 (1.10%)Rejected-Finance | ₹20.8 L+₹22,610.03 (1.10%) | L2 | Rejected-Finance DUE TO L2 BIDDER |
| 3 | L3₹21.1 L+₹52,003.07 (2.53%)Rejected-Finance BHARSALA PARA NABAPALLY P O P S RAMPURHAT DIST BIRBHUM WB PIN 731224 | RAMPURHAT | BIRBHUM | WEST BENGAL | 731224 | ₹21.1 L+₹52,003.07 (2.53%) | L3 | Rejected-Finance DUE TO L3 BIDDER |
| 4 | Rejected-Technical RANCHI ROAD BANS BANGLOW PURULIA | PURULIA | PURULIA | WEST BENGAL | - | - | Rejected-Technical Insufficient documents |
Tender Value
₹20.6 L
EMD Value
₹41,109
Closing Date
31 Jul 2026, 2:00 pmClosed
ASSISTANT ENGINEER
Assistant Engineer Durgapur Sub- Division (Bardhaman North), P. H. Engineering Dte. Purth Bhawan, 2nd floor Dist.-Purba Bardhaman-713103
Sinking of250x200mm.dia.150m.deepTubeWellby DRRig methodusing UPVC pipe(CD)andUPVC deep Well Screen (RDS)underCentral Circle,PHE.DTE.(1 No.)at Bolgona RailwayPar,PumpHouse at beside mirickpara ICDS,Laying of RisingMaing,DistributionHW at Bolgona PWSS
2026_PHED_1033844_3
WBPHED/AE/DSD/eNIT-7/2026-2027
Open Tender
CIVIL WORKS
Percentage
DURGAPUR SUB DIVN.PHED., PURTH BAHAWAN, BURDWAN
Please refer Tender documents.
5 documents required · 5 mandatory
₹41,109
Yes
25 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sinking of 250 X 200 mm dia 150m Deep Tube Well by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) under Central Circle, PHE Dte.(1 No) at Bolgona Railway Par (Replacement TW-III) And Pump House at beside Mirickpara ICDS AT PATNA Village and Laying of Rising Main in between Tube Well and Distribution Line for HEAD WORK SITE , PUMP HOUSE 3 (RAIL LINE er dhar ) and PUMP HOUSE 4 (PATNA VILLAGE) under Bolgona PWSS
Including GST @ 18%, Cess @ 1% [Details BOQ attached in S.O.Q.] N.B. : Payment will be made as per attached SOQ. | - | LS | 20,55,457 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.30 MB
Tendernotice_3.pdf
PDF • 0.51 MB
3SOQSinkingBolgona.pdf
Tender Documents • 0.43 MB
BOQ_2539158.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .