Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-AOC | ₹36.9 L Quoted ₹38 L | L1 | Accepted-AOC Accepted due to lowest rate quoted |
| 2 | L2₹39.8 L+₹1.8 L (4.61%)Rejected-Finance | ₹39.8 L+₹1.8 L (4.61%) | L2 | Rejected-Finance Rejected due to highest rate quoted |
| 3 | L3₹41.9 L+₹3.9 L (10.2%)Rejected-Finance | ₹41.9 L+₹3.9 L (10.2%) | L3 | Rejected-Finance Rejected due to highest rate quoted |
| 4 | L4₹44.9 L+₹6.9 L (18.2%)Rejected-Finance NOT FOUND | ₹44.9 L+₹6.9 L (18.2%) | L4 | Rejected-Finance Rejected due to highest rate quoted |
| 5 | L5₹45.3 L+₹7.3 L (19.1%)Rejected-Finance | ₹45.3 L+₹7.3 L (19.1%) | L5 | Rejected-Finance Rejected due to highest rate quoted |
| Sl No | Description | Qty | Unit | Goyal Enterprises L2 | shiv shanker enterprises L4 | M/s Luxmi Constructions L7 | KISHAN SINGH AND CO L5 | Shiv Shakti Builders L3 | GIR RAJ BUILDERS L1 | M/S RK Builders L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for removal of blokage in sewage line between manholes of various sizes by any means by using Kambore NM-01 No Kamgarb 5 Ltr 01 No, Kambore 1075 up-01 Nos Retriever 150 including removing Rugs of any type, dirt etc complete upto the entire satisfaction of Engr-in-Charge
Note : (i) The rates quoted in the above item includes cost of T&P like Kambore NM-01 No Kamgarb 5 Ltr 01 No & Retriever 150 etc complete. (ii) The lines measured once can not measured again within three months, if block in the same lines re-occure with in three months the contractor has to remove the blockage and shall not be paid extra for this (iii) Minimum two persons shall be deployed by contractor and they shall be present on all working days for attending the complaints of Sewage. The complaints shall be detailed by JE/AGE concerned. In case of non attending of complaints within 20 hours except on holidays, the recovery @ Rs 100/- per complaint shall be made from contractors dues. (iv) All the above machineries shall be procured and shall be deposited in complaint cell of AGE B&R (AF) Rajokri within 20 days on commencement of the work | 1,800 | RM | 110 ₹1,98,000 | 160 ₹2,88,000 | 234 ₹4,21,200 | 250 ₹4,50,000 | 50 ₹90,000 Lowest | 100 ₹1,80,000 | 300 ₹5,40,000 |
| 2.00 | M&L for removal of blokage of soil/waste pipes WC, WHB,Bottle Trap, Floor Trap etc running on external wall of buildings, complete all as specified and directed | 250 | Each | 160 ₹40,000 | 180 ₹45,000 | 198 ₹49,500 | 150 ₹37,500 | 50 ₹12,500 Lowest | 100 ₹25,000 | 200 ₹50,000 |
| 3.00 | Cleaning of manhole upto 1 m depth and removal of sludge silt/liquid/mud/sand/water etc in foul position to outside the MoD land complete all as specified and directed | 250 | Each | 221 ₹55,250 | 370 ₹92,500 | 198 ₹49,500 | 240 ₹60,000 | 50 ₹12,500 Lowest | 150 ₹37,500 | 250 ₹62,500 |
| 4.00 | All as per item No 3 here-in-before but exceeding 1m and not exceeding 2m in depth. | 250 | Each | 250 ₹62,500 | 410 ₹1,02,500 | 378 ₹94,500 | 310 ₹77,500 | 100 ₹25,000 Lowest | 200 ₹50,000 | 300 ₹75,000 |
| 5.00 | All as per item No 3 here-in-before but exceeding 2m and not exceeding 3 m in depth. | 50 | Each | 290 ₹14,500 | 570 ₹28,500 | 630 ₹31,500 | 490 ₹24,500 | 200 ₹10,000 Lowest | 300 ₹15,000 | 350 ₹17,500 |
| 6.00 | Excavation in trenches not exceeding 1.50m wide and not exceeding 1.50m in depth and not exceeding 10 Sqm on plan and not exceeding 1.50 m in depth for manholes ,well etc and getting out in soft/loose soil, complete all as specified and directed | 850 | Cum | 111 ₹94,350 | 200 ₹1,70,000 | 225 ₹1,91,250 | 170 ₹1,44,500 | 100 ₹85,000 Lowest | 100 ₹85,000 Lowest | 320 ₹2,72,000 |
| 7.00 | All as per Srl Item No 6 here-in-before but depth exceeding 1.50m and not exceeding 3m. | 50 | Cum | 158 ₹7,900 Lowest | 270 ₹13,500 | 252 ₹12,600 | 210 ₹10,500 | 200 ₹10,000 | 300 ₹15,000 | 200 ₹10,000 |
| 8.00 | Returning filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm.. | 580 | Cum | 57 ₹33,060 | 30 ₹17,400 Lowest | 36 ₹20,880 | 70 ₹40,600 | 50 ₹29,000 | 40 ₹23,200 | 350 ₹2,03,000 |
| 9.00 | Removing excavated materials to a distance exceeding 50m but not exceeding 200m and depositing where directed at a level not exceeding 1.50m above the starting point in soft/loose soil, complete all as specified. | 390 | Cum | 54 ₹21,060 Lowest | 90 ₹35,100 | 126 ₹49,140 | 90 ₹35,100 | 100 ₹39,000 | 60 ₹23,400 | 80 ₹31,200 |
| 10.00 | Demolition & breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar including bed concrete internal dia of pipe 150mm and removal of demolished materail out of MoD land complete all as specified. | 520 | RM | 7 ₹3,640 | 10 ₹5,200 | 5.4 ₹2,808 Lowest | 20 ₹10,400 | 10 ₹5,200 | 40 ₹20,800 | 60 ₹31,200 |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
7 Aug 2026, 6:00 pmClosed
GE (AF) GURGAON
GE (AF) GURGAON
REPAIR/REPLACEMENT OF SEWAGE LINES MANHOLES SEPTIC TANK BRICK DRAIN AND CERTAIN MISC B/R WORKS IN TECH AREA AT AF STN RAJOKRI UNDER GE (AF) GURGAON
2026_MES_777702_1
GE/GUR-/NIT-39/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE (AF) GURGAON
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) GURGAON
₹92,000
10 Sept 2026
10 Jul 2026
10 Aug 2026
10 Jul 2026
7 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for removal of blokage in sewage line between manholes of various sizes by any means by using Kambore NM-01 No Kamgarb 5 Ltr 01 No, Kambore 1075 up-01 Nos Retriever 150 including removing Rugs of any type, dirt etc complete upto the entire satisfaction of Engr-in-Charge
Note : (i) The rates quoted in the above item includes cost of T&P like Kambore NM-01 No Kamgarb 5 Ltr 01 No & Retriever 150 etc complete. (ii) The lines measured once can not measured again within three months, if block in the same lines re-occure with in three months the contractor has to remove the blockage and shall not be paid extra for this (iii) Minimum two persons shall be deployed by contractor and they shall be present on all working days for attending the complaints of Sewage. The complaints shall be detailed by JE/AGE concerned. In case of non attending of complaints within 20 hours except on holidays, the recovery @ Rs 100/- per complaint shall be made from contractors dues. (iv) All the above machineries shall be procured and shall be deposited in complaint cell of AGE B&R (AF) Rajokri within 20 days on commencement of the work | 1,800 | RM | - | - |
| 2 | M&L for removal of blokage of soil/waste pipes WC, WHB,Bottle Trap, Floor Trap etc running on external wall of buildings, complete all as specified and directed | 250 | Each | - | - |
| 3 | Cleaning of manhole upto 1 m depth and removal of sludge silt/liquid/mud/sand/water etc in foul position to outside the MoD land complete all as specified and directed | 250 | Each | - | - |
| 4 | All as per item No 3 here-in-before but exceeding 1m and not exceeding 2m in depth. | 250 | Each | - | - |
| 5 | All as per item No 3 here-in-before but exceeding 2m and not exceeding 3 m in depth. | 50 | Each | - | - |
| 6 | Excavation in trenches not exceeding 1.50m wide and not exceeding 1.50m in depth and not exceeding 10 Sqm on plan and not exceeding 1.50 m in depth for manholes ,well etc and getting out in soft/loose soil, complete all as specified and directed | 850 | Cum | - | - |
| 7 | All as per Srl Item No 6 here-in-before but depth exceeding 1.50m and not exceeding 3m. | 50 | Cum | - | - |
| 8 | Returning filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm.. | 580 | Cum | - | - |
| 9 | Removing excavated materials to a distance exceeding 50m but not exceeding 200m and depositing where directed at a level not exceeding 1.50m above the starting point in soft/loose soil, complete all as specified. | 390 | Cum | - | - |
| 10 | Demolition & breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar including bed concrete internal dia of pipe 150mm and removal of demolished materail out of MoD land complete all as specified. | 520 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_870994.xls
BOQ • 0.48 MB
TenderDocuments39.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .