Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹64,262Accepted-AOC GSTIN: 02AAYPK3829R1ZV, 02ACYPS3109G1ZH, 02AGQPK7127A1ZR, 02AKCPK0943NIZB, 02AXAPR9448Q1ZS, 02AXDPK8400G1ZZ, 02AYEPK4484CIZS, 02CIOPK5100K1ZG, 02CIOPK5100KIZGCHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹64,262 Quoted ₹64,868 | L-1 | Accepted-AOC Bidder quoted a lowest rate in submitted bids. |
| 2 | L-2₹65,498Rejected-Finance GSTIN: 02AAAAH7757E1ZXVPO TAKARIA TEHSIL AMB DISTT UNA HP | ₹65,498 | L-2 | Rejected-Finance Bidder quoted a higher rate then L-1. |
| 3 | L-3₹66,116Rejected-Finance | ₹66,116 | L-3 | Rejected-Finance Bidder quoted a higher rate then L-1. |
Tender Value
Refer Docs
Closing Date
19 Mar 2026, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer ED HPSEBL Amb
Tender R/R of damaged HT/LT Line due to heavy raining/ storm at various locations on dated 16.04.2025, 23.05.2025 and 10.06.2025 in (E) section Dharamshala Mahanta Under Electrical Sub-Division, HPSEB Ltd., Bharwain
2026_HPSEB_131350_1
AED/223/2025-26
Open Tender
Electrical Works
31 days
Sr. Executive Engineer ED HPSEBL Amb
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
3 Jun 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
Material for LT Line
Shackle Insulator (16 kN)
D-Iron (U- Clamps) with nut and bolts
Full Clamps ( 1 No for Stay Set)
Half Clamp for X-arm
Prov. L.T. Stay Set in all respect.
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Prov. LT Earthing Set
Prov. Nut Bolts
Material for HT Line
Prov. 11 KV Pin Insulator
Prov. 11 KV Disc Insulator
Prov.MS Half Clamp
Prov.MS Full Clamp
Prov.11kv Stay Set in all respect.
Stay Wire (7/3.15 mm) (9 kg Per Stay Set)
Prov. Earthing Set
Prov. Nut Bolts
ERECTION PART
Add Re -Sagging of Conductor 7/3.81 mm line length = 0.120 *3 = .360 Km of HT line.
Add Re -Sagging of Conductor 7/4.26 mm line length = 0.120*4=0.480 Km of LT line.
Re- Erection LT Stay Set
Re- Erection HT Stay Set
Re- Erection LT Earthing Set
Re- Erection of HT Earthing Set
Add Transportation Charges
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_194175.xls
BOQ • 0.30 MB
AED223.rar
Tender Documents • 9.81 MB
Download all tender documents and submit your bid