Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹72 L
Closing Date
29 May 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASHOK KUMAR
PROJECT DIRECTOR
GAYA
ASHOK KUMAR
PROJECT DIRECTOR
Design and build sewage treatement plant of installed capacity 16 MLD primary clarifier, 1 nos of main pumping station, along with all appurtenant structures and allied works, including (ii) survey, designs and build interception drain tapping of 01 nos drain, inculding rising mains of 50 meter and disposal of treated effluent through popeline. (iii) Operaton & maintenance of the complete works of sewage treatment plant, interception & diversion works, and effluent channel for a period of 15 years in muzzafarpur town, State of Bihar, India.
122516
Buidco/Yo-78
Open Tender
GENERAL
Gaya
• Name
• Company Name
• Address
• Email ID and Mobile No.
• PAN No. and GST No.
GENERAL
ITEM RATE
L1
1
13 documents required · 13 mandatory
₹72 L
CGM, Buidco office- West Boring Canal Road, Rajapur Pul, Patna- 800001.
29 May 2026
10 Jan 2026
30 May 2026
10 Jan 2026
29 May 2026
10 Jan 2026
15 Jan 2026
Cost of Design, Development, Construction, Testing and Successful Commissioning of 16 MLD STP at Fardo Drain: Design, Construction, Supply and Erection of equipments, Civil, Electrical, Electro-mechanical, Instrumentation, Online Monitoring, including Testing and Commissioning of one no. 16 MLD Sewage Treatment Plant (including all components of Primary and Secondary Sewage Treatment Process) on any proven technology to meet the KPI's as specified in bid document along with construction of Tertiary Treatment Plant (TTP), including Sludge treatment, re-use and disposal facility, Pile work & Construction of RCC platform above Fardo Nala, arrangement for disposal of treated effluent in Kadane river, Chlorination cum Tonner Room, Blower Room, Online Waste water quality analyzer at inlet & outlet, PLC SCADA at STP, CCTV surveillance at STP and MPS, including Campus devalopment works, Boundary wall on the RCC platform, HT Room, LT Room, Meter room, Panel Room, admin building (G+1), Guard Room, Staff Quarter (02 nos.) - (Officer room, Operator Room, SCADA Room, Laboratory room, WC & Kitchen, Conference Room), DG/Transformer yard with platforms, mandatory Solar power plant, water supply, Rain water Harvesting System, Electric Lightning System, Fire Fighting System as per National Building Codes, approach & Internal Road, internal & external electrification, any other facility required for conforming to the effluent standards, with all electro-mechanical components along with appurtenant works described in detail in bid document.
Break-up of Price Item 1 above
Civil and Structural Works (including the requirement of Disposal and Facility for reuse of treated effluent)
Supply, Installation, Testing and Commissioning of Electro-mechanical and Instrumentation equipment and accessories including equipment for electricity generation from Solar Photovaoltaic arrangement (including required for Disposal and Facility for resue of treated effluent)
Ancillary Works - Boundary wall on the RCC platform, HT Room, LT Room, Meter room, Panel Room, admin building (G+1) - (Guard Room, Staff Quarter - 02 nos., Officer room, Operator Room, SCADA Room, Laboratory room, WC & Kitchen, Conference Room), DG/Transformer yard with platforms, mandatory Solar power plant, water supply system, Rain water Harvesting System, Electric Lightning System, Fire Fighting System etc.
Implementation of Environmental Management Plan and ESHS-MSIP, as per Appendix 1 of Schedule 2 (Design Build services)
Insertion and Diversion Work
Survey, Design and Construction of One no. of I&D structure with Coffer dam on Fardo Nala and Gravity Main pipeline till M PS unit from I&D structure.
Main Pumping Station (MPS)
Cost of Design, Development, Construction, Testing and Successful Commissioning of 16 MLD MPS at Fardo Drain: Design, Construction, Supply and Erection of equipments, Civil, Electrical, Electro-mechanical including Testing and Commissioning of one no. 16 MLD MPS.
Rising Main
Rising main from Fardo MPS to Fardo STP: Design, Supply and laying of 300 mm diameter DI K-9 pipe Pressure Pipes with all completed work.
OPERATION AND MAINTENANCE FOR 15 YEARS [NON-POWER]
16 MLD STP (PART A) Operation and Maintenance Price for Treatment of threshold sewage flow for 16 MLD STP at Fardo drain & Tertiary Treatment Plant (TTP) (excluding cost of Power and Fuel) with all Civil, Electrical, Mechanical & Instrumentation works, effluent channel and appurtenanat and allied works for 15 years as specified in then tender document and as per norms of CPHEEO manual on Sewerage and Sewage Treatment Systems 2013 (excluding Power and Fuel Cost) [The bidder need to ensure that quoted value per year shall not be less than 3% of the Design-Build price of 16 MLD STP i.e. 3% on sum of sl.no.1.01 to 1.05]
1st year
2nd year
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
11th year
12th year
13th year
14th year
15th year
PART B Additional Operation and Maintenance Price for Treatment of additional sewage in excess of the threshold on per MLD basis flow for 16MLD STP & Tertiary Treatment Plant at Fardo
1st year
2nd year
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
11th year
12th year
13th year
14th year
15th year
Total O&M Price- assuming indicative Sewage Flow reaching the STP C=a+bx*365 (x= indicative flow minus threshold sewage flow)
1st year (X=12.80-12.80=0)
2nd year (X=13.03-12.80=0.23)
3rd year (X=13.26-12.80=0.46)
4th year (X=13.49-12.80=0.69)
5th year (X=13.72-12.80=0.92)
6th year (X=13.95-12.80=1.15)
7th year (X=14.20-12.80=1.40)
8th year (X=14.62-12.80=1.82)
9th year (X=14.85-12.80=2.05)
10th year (X=15.08-12.80=2.28)
11th year (X=15.32-12.80=2.52)
12th year (X=15.54-12.80=2.74)
13th year (X=15.76-12.80=2.96)
14th year (X=15.95-12.80=3.15)
15th year (X=16-12.80=3.20)
Operation and Maintenance cost (excluding cost of Power and Fuel) of 16 MLD MPS, Insertion & Diversion, Rising Main with all Civil, Electro-mechanical and instrumentation works and appurtenant and allied works for 15 years and specified in the tender document and as per norms of CPHEEO manual on Sewerage and Swage Treatment System 2013 [The bidder need to ensure that quoted value per year shall not be less than 3% of its Design-Build price i.e. 3% on sum of sl.no.2.01 to 4.01]
1st year
2nd year
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
11th year
12th year
13th year
14th year
15th year
Total O&M Price
1st year
2nd year
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
11th year
12th year
13th year
14th year
15th year
NPV of total O&M
1st year (NPV Factor-0.909)
2nd year (NPV Factor-0.826)
3rd year (NPV Factor-0.751)
4th year (NPV Factor-0.683)
5th year (NPV Factor-0.621)
6th year (NPV Factor-0.564)
7th year (NPV Factor-0.513)
8th year (NPV Factor-0.467)
9th year (NPV Factor-0.424)
10th year (NPV Factor-0.386)
11th year (NPV Factor-0.350)
12th year (NPV Factor-0.319)
13th year (NPV Factor-0.290)
14th year (NPV Factor-0.263)
15th year (NPV Factor-0.239)
GUARANTEED ENERGY CONSUMPTION (GEC) for STPs for 15 years
Guaranteed Energy Consumption for 16 MLD STP at Fardo drain for the first month after COD (Value should be entered in all cell Sl. no. 11.02 to 11.05, after adjusting for energy generated through solar power plant if proposed to be installed or any other sources. The permissible value of maximum to minimum GEC quoted in Sl. no. 11.02 to 11.05 should be less than or equal to 1.5)
For flow upto 08 MLD and BOD ≤ 124 mg/L (40% weightage)
For flow upto 08 MLD and BOD > 124 mg/L (10% weightage)
For flow >08 MLD and BOD ≤ 124 mg/L (40% weightage)
For flow >08 MLD and BOD > 124 mg/L (10% weightage)
STP Average GEC
Power Charges for 16 MLD STP at Fardo drain (= Sum of Indicative Flows X Units Consumed/MLD X 365 X 7.98 X 1.25) (Not to be filled by the Bidder)
GUARANTEED ENERGY CONSUMPTION (GEC) for MPS for 15 years
Guaranteed Energy Consumption for 16 MLD MPS at Fardo for the first month after COD
Power Charges for 16 MLD MPS at Fardo (= Sum of Indicative Flows X Units Consumed/MLD X 365 X 7.98 X 1.25) (Not to be filled by the Bidder)
Land Requirement
Land requirement (sqm) - 16 MLD STP at Fardo (Circle rate is Rs 21008 per sq.m.) (Bidder is required to quote the land requirement under column 5 of this row including land required for MPS, Solar Power Plant if proposed, subject to lavailable land i.e. 4500 sqm)
Gross & Captive Power Generation For information Purpose
A. Gross and Captive Power Generation at 16 MLD STP at Fardo site
A1. Capacity of onsite Captive Solar Power Plant, if proposed
A2. Average Power Generation from Solar Power Plant, if proposed
A3. Average Power Generation from Biogas Power Plant, if proposed
A4. Average Power Generation from Micro Hydel Power Plant, if proposed
A5. Total Average Guaranteed Energy Consumption (STP & Associated Infrastructure) from State Power Grid
A6. Total Energy Available from all sources (sum of A2 to A5)
A7. Total Energy Requirement for Operating the STP and Associated Infrastructure.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 78.pdf
NIT • 1.21 MB
BOQ.xls
NIT • 0.32 MB
C8 CORRIGENDUM 06 FOR MUZ.pdf
Corrigendum • 0.60 MB
C7 Corrigendum 05.pdf
Corrigendum • 0.29 MB
C6 Corrigendum 05.pdf
Corrigendum • 0.29 MB
C5 CORRIGENDUM 04 FOR MUZAFFARPUR STP.pdf
Corrigendum • 0.32 MB
C4 Corrigendum 03.pdf
Corrigendum • 0.29 MB
C3 Pre Bid Reply.pdf
Corrigendum • 0.18 MB
C2 Corrigendum 02.pdf
Corrigendum • 0.30 MB
C1 Corrigendum 01.pdf
Corrigendum • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .