Tender Value
₹40.9 L
EMD Value
₹81,800
Closing Date
18 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
LUCKNOW
13 conditions · 2 needing a document upload
NA
NA
24 conditions · 10 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
Pre and Post tamping track measurement survey using Trimble gedo vorsys trolley system or similar and development of updated scale map in the jurisdiction of ADEN-I-LKO under Sr.DEN-I/LKO.
36-SrDEN-I-LKO-2026-27~NR
36-SrDEN-I-LKO-2026-27
Open
Works - General
6 Months
Lucknow, Uttar Pradesh
₹0
₹81,800
27 Aug 2026
27 Aug 2026
4 Sept 2026
5 items across 1 schedule · ₹40,88,944.8 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Pre Tamping Measurements (a) Reference Points Establishments of main GNNS (DSPS Base) Point & Reference point establishment at 150 meter maximum interval along the track. | Per Track KM | 108.00 | 7,004.32 | 7,56,466.56 |
| 2 | Pre Measurement for tamping with total station & amp; prism Gedo trolley measure and store Gauge. Cross elevation, Chainage, shift and lift value at every 3mi.e Every 5th sleeper interval along the track centre line and coordinates of track centre line at every 3mto be submitted with track geometry(per/km/Round)"" | Per Track KM | 108.00 | 12,272.33 | 13,25,411.64 |
| 3 | Construct Target/Design alignment with the good points of existing pre measurement profile in design software. To export date in ALC format with design alignment of measured reading in M/c and to provide track adjustment file with over extension and also to provide & quot " Geo Geometry file to provide text file with slow. Uplift and gauge at every 3 m i.e. every 5thsleeper interval for tamping machine operator reference during reference. | Per Track KM | 108.00 | 3,155.81 | 3,40,827.48 |
| 4 | Post Tamping Measurements (a)Post Tamping Measurements with total station & amp prism Gedo trolley measure and store Gauge. Cross elevation, Chainage, shift and lift value at every 3m i.e Every 5th sleeper interval along the track centre line and coordinates of track centre line at every 3m to be submitted with track geometry (per/km/Round)"& quot | Per Track KM | 108.00 | 12,272.33 | 13,25,411.64 |
| 5 | Reporting Soft and hard copies of slew &, uplift report at every 3 m interval i.e. every 5th sleeper interval compared with design Vs Pre profile Report of offset distance from track centre to OHE neighbouring track centre & amp, platform point compared with design Vs Pre profile report a.Reference points statement b. Slew & amp, Uplift statement for Pre tamping measurements c. Pre & amp, Post Vertical alignment chartd. Pre & amp Post Horizontal alignment chart e. Statement showing Pre and Post slew details Statement of Track parameters after Final tamping g.Pre & amp ,Post Track levels h. Curve details & quot | Per Track KM | 108.00 | 3,155.81 | 3,40,827.48 |
| Schedule total | ₹40,88,944.8 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocumentpreandpost.pdf Tender Document
ATTACHMENT
TenderDocumentpreandpost.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .