| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹10.1 LAccepted-AOC | 1st | Accepted-AOC 1st lowest | |
| 2 | 2nd₹11.5 L+₹79,500 (7.44%)Rejected-Finance | 2nd | Rejected-Finance 2nd lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected under PAF reservation policy. |
Tender Value
Refer Docs
Closing Date
18 Jun 2022, 5:00 pmClosed
Gr. Sr. Manager (Mech.), PnC Division
Office of the Gr. Sr. Manager (Mech.), PnC Division, NHPC Ltd., Loktak Power Station, Komkeirap, Manipur-795124
Repairing of Internal Drain Old Colony at, Loktak.
2022_NHPC_691600_1
NH-LPS-HOP012(22)/27/2022-CD I and III/975
Open Tender
Civil Works
Works
120 days
NHPC Ltd., Loktak Power Station
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
20 Oct 2022
28 May 2022
24 Jun 2022
28 May 2022
18 Jun 2022
28 May 2022
Amount
Demolition of stone masonry below G.L upto floor two level including stacking of serviceable materials within 50 m lead. 13.16.1 Rubble masonry in cement mortar.
Demolition of brick work above G.L upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within 50 m lead. 13.11.1 In cement mortar.
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 15m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. (b) Hard/Dense soil.
Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering in 1:2:4(1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size).
2nd class (Local 1st class) brick work in foundation and plinth in cement mortar 1:4 (1 cement :4 coarse sand).
Polygonal rubble masonry/R.R. masonry (uncoursed /brought to courses) squared rubble masonry (uncoursed/brought to courses) with hard stone of approved quality in foundation & plinth in cement mortar 1:6 (1 cement:6coarse sand) i/c levelling up with cement concrete 1:6:12(1 cement:6coarse sand 12 stone aggregate 20 mm nominal size) at plinth level.
12 mm cement plaster 1:4 (1 cement : 4 find sand).
Neat Cement Punning
Steel Reinforcement for R.C. work i/c. Bending, binding and placing in position complete.TMT bars.
Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc height of propping and centering below supporting floor to ceiling not exceeding 4m and removal of the same for in-situ reinforced concrete and plain concrete work in flat surface such as suspended floor ,roofs landings and the like.
RCC work in beams, suspended floors, roofs having slope upto 15”landing, balconies, shelves, chajjas, lintels, plain window sills, staircases and spiral staircase upto floor five level i/c finishing and plastering the exposed surface with cement mortar 1:3 (1 cement: 3 fine sand) of thickness not exceeding 6mm to give a smooth and even surface but excluding cost of centering, shuttering, finishing and reinforcement, with- 3.2.2.1:1.5:3(1cement: 1.5 coarse sand: 3graded stone agggt.20 mm nominal size).
Flush or ruled pointing on stone work cement mortar 1:3 (1 cement : 3 fine sand).
Steel work welded in built up sections, framed work in cutting , hoisting, fitting in position & priming coat of red lead paint in gratings, framed guard bars, ladders, painting, brackets, and similar works.
Add EPF @ 0.65%
Add CESS @ 1%
Add GST @ 12%
M/S BALBIR SINGH LAKRA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .